Velarion Records
Follow this handler
Unsubscribe any time.

EPA ID CAR000236208

METRO GOLD LINE FOOTHILL EXTENSION CONSTRUCTION PROJECT, Monrovia, CA: hazardous-waste inspections, violations, penalties

No inspection of METRO GOLD LINE FOOTHILL EXTENSION CONSTRUCTION PROJECT is on file. What the counts and dates cover.

Identity

Name as filedMETRO GOLD LINE FOOTHILL EXTENSION CONSTRUCTION PROJECT
EPA IDCAR000236208
Address406 E HUNTINGTON DR, Monrovia, CA 91016
CountyLos Angeles
Generator statusLarge quantity generator
IndustryHeavy and civil engineering construction (NAICS 23731)

Cited to rcra_downloads.zip/RCRA_FACILITIES.csv, loaded September 15, 2026.

For METRO GOLD LINE FOOTHILL EXTENSION CONSTRUCTION PROJECT (EPA ID CAR000236208): no inspection, no violation, no enforcement action since 2017; no Biennial Report waste code on file.

Watch METRO GOLD LINE FOOTHILL EXTENSION CONSTRUCTION PROJECT

One handler — $99/month

Billing

30-day card trial: card required now, charged nothing until it ends, then $99/month continues; cancel anytime.

Privacy

Free from EPA: ECHO Notify for EPA ID CAR000236208.

Other handlers in Monrovia beside METRO GOLD LINE FOOTHILL EXTENSION CONSTRUCTION PROJECT (name, EPA ID)