Air-emissions inspections in Jefferson County, Alabama, 2021
- 61Inspections
A compliance evaluation is the on-site or file review a state, local or federal air agency records against a permitted source. Each row below is one inspection recorded against a source in Jefferson County, Alabama during 2021. A facility can appear several times: this is the year’s record of what happened, not a list of places. The sources themselves are on the Jefferson County facility page.
Jefferson County, Alabama, 2021
- Stack tests 15
Air-emissions inspections in Jefferson County, other years
Air-emissions inspections recorded in Jefferson County, Alabama, 2021
| Date | Facility | Kind | Agency |
|---|---|---|---|
| 2021-12-16 | HOLCIM (US) INC. | FCE On-Site | Local |
| 2021-12-15 | REGIONS OPERATIONS CENTER | FCE On-Site | Local |
| 2021-12-13 | MIDSOUTH PAVING INC. TARRANT ASPHALT PLANT | FCE On-Site | Local |
| 2021-12-13 | MIDSOUTH PAVING INC. TARRANT ASPHALT PLANT | FCE On-Site | Local |
| 2021-12-13 | DIVERSIFIED NONFERROUS TECHNOLOGIES | FCE On-Site | Local |
| 2021-12-13 | DIVERSIFIED NONFERROUS TECHNOLOGIES | FCE On-Site | Local |
| 2021-12-09 | CHEVRON USA PRODUCTS COMPANY | FCE On-Site | Local |
| 2021-12-09 | CHEVRON USA PRODUCTS COMPANY | FCE On-Site | Local |
| 2021-12-08 | WESTERN PIPE SERVICE | FCE On-Site | Local |
| 2021-10-25 | AMERICAN CAST IRON PIPE COMPANY | FCE On-Site | Local |
| 2021-10-20 | ERGON TERMINALLING, INC. | FCE On-Site | Local |
| 2021-10-20 | VULCAN PIPE & STEEL COATINGS, INC. | FCE On-Site | Local |
| 2021-10-14 | AFFINITY HOSPITAL, LLC D/B/A GRANDVIEW MEDICAL CEN | FCE On-Site | Local |
| 2021-09-14 | ALABAMA POWER COMPANY (MILLER POWER PLANT) | FCE On-Site | Local |
| 2021-09-10 | RENO REFRACTORIES, INC. | FCE On-Site | Local |
| 2021-09-01 | UNITED STATES STEEL CORPORATIONFAIRFIELD PIPE MIL | FCE On-Site | Local |
| 2021-08-26 | MERIDIAN BRICK, LLC BESSEMER PLANT NO. 6 | FCE On-Site | Local |
| 2021-08-23 | DRUMMOND COMPANY, INC. (ABC COKE) | FCE On-Site | Local |
| 2021-08-13 | CIRCLE K TERMINAL ALABAMA LLC (OLD BAMA TERMINAL) | PCE On-Site CEMS/CMS Audit | Local |
| 2021-08-13 | MCSWEENY HOLDINGS LLC (OLD MCM CUSTOM) | FCE On-Site | Local |
| 2021-08-11 | ALABAMAS BEST FABRICATORS, INC. | FCE On-Site | Local |
| 2021-08-11 | MELSUR CORPORATION | FCE On-Site | Local |
| 2021-08-10 | LEHIGH CEMENT COMPANY | FCE On-Site | Local |
| 2021-08-05 | MAYCO INDUSTRIES, INC. | FCE On-Site | State |
| 2021-08-03 | JEFFERSON COUNTY LANDFILL NO. 1 | FCE On-Site | State |
| 2021-08-02 | TRUSSVILLE WASTEWATER TREATMENT FACILITY WWTP | FCE On-Site | State |
| 2021-07-30 | DRUMMOND COMPANY, INC. (ABC COKE) | PCE On-Site | U.S. EPA |
| 2021-07-30 | THE SHERWIN WILLIAMS COMPANY | PCE On-Site | U.S. EPA |
| 2021-07-29 | CITGO PETROLEUM CORP. | PCE On-Site | U.S. EPA |
| 2021-07-28 | OAK GROVE RESOURCES, LLC | FCE On-Site | State |
| 2021-07-23 | BLUESTONE COKE | FCE On-Site | State |
| 2021-07-23 | UNIVERSITY OF ALABAMA AT BIRMINGHAM | FCE On-Site | State |
| 2021-07-22 | HANNA STEEL CORP. | FCE On-Site | State |
| 2021-07-20 | GRAIN CRAFT | FCE On-Site | State |
| 2021-07-15 | PRECOAT METALS DIVISION SEQUA CORPORATION | FCE On-Site | State |
| 2021-07-15 | PRECOAT METALS DIVISION SEQUA CORPORATION | FCE On-Site | State |
| 2021-07-13 | BIRMINGHAM HIDE AND TALLOW | FCE On-Site | State |
| 2021-06-25 | SMI STEEL, INC. | FCE On-Site | Local |
| 2021-06-24 | NUCOR STEEL BIRMINGHAM,INC. | FCE On-Site | Local |
| 2021-06-23 | U. S. PIPE & FOUNDRY COMPANY,LLC.BESSEMER PLANT) | FCE On-Site | Local |
| 2021-06-23 | GLASFORMS, INC. | FCE On-Site | Local |
| 2021-05-21 | BAMA CONCRETE BIRMINGHAM TRUSSVILLE PLANT | FCE On-Site | Local |
| 2021-05-18 | ALTEC INDUSTRIES, INC. | FCE On-Site | Local |
| 2021-05-18 | MILLER AND COMPANY LLC | FCE On-Site | Local |
| 2021-05-14 | BLAIR BLOCK LLC | FCE On-Site | Local |
| 2021-05-05 | IKG/BORDEN (IKG INDUSTRIES) | FCE On-Site | Local |
| 2021-05-05 | IKG/BORDEN (IKG INDUSTRIES) | FCE On-Site | Local |
| 2021-04-22 | STEWART INDUSTRIES INTERNATIONAL BIRMINGHAM | FCE On-Site | Local |
| 2021-04-20 | SPIRE ALABAMA | FCE On-Site | Local |
| 2021-04-16 | C & B PIPING, INC.(LEEDS) | FCE On-Site | Local |
| 2021-04-14 | REMURIATE TECHNOLOGIES L.L.C. | FCE On-Site | Local |
| 2021-04-09 | QUIKRETE BIRMINGHAM, INC. | FCE On-Site | Local |
| 2021-04-09 | LAKESHORE BATCH PLANT | FCE On-Site | Local |
| 2021-03-29 | BELLSOUTH TELECOMMUNICTIONS, INC.DBA AT&T ALABAM | FCE On-Site | Local |
| 2021-02-09 | SOUTHERN NATURAL GAS CORP. | FCE On-Site | Local |
| 2021-02-03 | CEMEX,INC, BIRMINGHAM TERMINAL | FCE On-Site | Local |
| 2021-01-14 | MPLX TERMINALS LLC BIRMINGHAM TERMINAL | FCE On-Site | Local |
| 2021-01-14 | SHERMAN INDUSTRIES,INC. | FCE On-Site | Local |
| 2021-01-14 | SHERMAN INDUSTRIES LLC GARDENDALE PLANT | FCE On-Site | Local |
| 2021-01-06 | L. B. FOSTER COMPANY | FCE On-Site | Local |
| 2021-01-04 | KIRKPATRICK CONCRETE,INC. PLANT 13 | FCE On-Site | Local |
Dates as filed by the agency that recorded the inspection. Figures from EPA’s ICIS-AIR download.