Velarion Records

The 340B register and hospital finances — joined, watched daily, delivered.

EPA Air · inspections by county and year

Air-emissions inspections in St. Clair County, Alabama, 2022

A compliance evaluation is the on-site or file review a state, local or federal air agency records against a permitted source. Each row below is one inspection recorded against a source in St. Clair County, Alabama during 2022. A facility can appear several times: this is the year’s record of what happened, not a list of places. The sources themselves are on the St. Clair County facility page.

Air-emissions inspections in St. Clair County, other years

Air-emissions inspections recorded in St. Clair County, Alabama, 2022

DateFacilityKindAgency
2022-10-26THE FORD METER BOX COMPANYPCE On-SiteState
2022-09-30NATIONAL CEMENT CO OF ALABAMA — high-priority violation on fileFCE On-SiteState
2022-09-30REAL ALLOY SPECIFICATION, LLC — high-priority violation on fileFCE On-SiteState
2022-09-30ALLIED MINERAL PRODUCTS, INC. (RIVERSIDE REFRACT)FCE On-SiteState
2022-09-30BUCKNER BARRELS & DRUMS INCFCE On-SiteState
2022-09-30GARDNER ASPHALT CORPORATIONFCE On-SiteState
2022-09-30BENJAMIN MOORE AND COMPANYFCE On-SiteState
2022-09-30SOUTHERN NATURAL GASFCE On-SiteState
2022-09-30TCI OF ALABAMA LLCFCE On-SiteState
2022-09-30FONTAINE SPECIALIZED INCFCE On-SiteState
2022-09-30THE FORD METER BOX COMPANYFCE On-SiteState
2022-09-30STAR RIDGE LANDFILLFCE On-SiteState
2022-09-30VULCAN CONSTRUCTION MATERIALS LLCFCE On-SiteState
2022-09-30WIREGRASS CONSTRUCTION COMPANY, INC.FCE On-SiteState
2022-09-30BLOUNT SPRINGS MATERIALS, INC.FCE On-SiteState
2022-09-30CEDAR HILL LANDFILLFCE On-SiteState
2022-09-30NATIONAL CEMENT COMPANY OF ALABAMA, INC.FCE On-SiteState
2022-09-30VALTIR, LLCFCE On-SiteState
2022-09-30ACME BRICK COMPANYFCE On-SiteState
2022-09-30WKW ERBSLOEH, NORTH AMERICAFCE On-SiteState
2022-09-30INDUSTRIAL CONTAINER SERVICES AL, LLCFCE On-SiteState
2022-09-30GROOMS ALUMINUM PROCESSING — high-priority violation on fileFCE On-SiteState
2022-09-09GROOMS ALUMINUM PROCESSING — high-priority violation on filePCE On-SiteState
2022-09-07REAL ALLOY SPECIFICATION, LLC — high-priority violation on filePCE On-SiteState
2022-09-01ACME BRICK COMPANYPCE On-SiteState
2022-08-01NATIONAL CEMENT CO OF ALABAMA — high-priority violation on filePCE On-SiteState
2022-07-14BUCKNER BARRELS & DRUMS INCPCE On-SiteState
2022-07-14INDUSTRIAL CONTAINER SERVICES AL, LLCPCE On-SiteState
2022-06-15ALLIED MINERAL PRODUCTS, INC. (RIVERSIDE REFRACT)PCE On-SiteState
2022-06-15TCI OF ALABAMA LLCPCE On-SiteState
2022-06-15NATIONAL CEMENT COMPANY OF ALABAMA, INC.PCE On-SiteState
2022-05-17STAR RIDGE LANDFILLPCE On-SiteState
2022-05-17CEDAR HILL LANDFILLPCE On-SiteState
2022-05-05BENJAMIN MOORE AND COMPANYPCE On-SiteState
2022-05-05VALTIR, LLCPCE On-SiteState
2022-04-27FONTAINE SPECIALIZED INCPCE On-SiteState
2022-01-13SOUTHERN NATURAL GASPCE On-SiteState
2022-01-11THE FORD METER BOX COMPANYPCE On-SiteState
2022-01-11WKW ERBSLOEH, NORTH AMERICAPCE On-SiteState
2022-01-11GROOMS ALUMINUM PROCESSING — high-priority violation on filePCE On-SiteState

Dates as filed by the agency that recorded the inspection. Figures from EPA’s ICIS-AIR download.