EPA Air · inspections by county and year
Air-emissions inspections in San Bernardino County, California, 2024
- 143Inspections
A compliance evaluation is the on-site or file review a state, local or federal air agency records against a permitted source. Each row below is one inspection recorded against a source in San Bernardino County, California during 2024. A facility can appear several times: this is the year’s record of what happened, not a list of places. The sources themselves are on the San Bernardino County facility page.
San Bernardino County, California, 2024
Air-emissions inspections in San Bernardino County, other years
Air-emissions inspections recorded in San Bernardino County, California, 2024
| Date | Facility | Kind | Agency |
|---|---|---|---|
| 2024-03-27 | SO CAL GAS - KELSO | FCE On-Site | Local |
| 2024-03-27 | 3M OAK HILLS | PCE On-Site | Local |
| 2024-03-27 | INSULFOAM | FCE On-Site | Local |
| 2024-03-27 | TST INC | FCE On-Site | Local |
| 2024-03-25 | PG&E- TOPOCK | FCE On-Site | Local |
| 2024-03-25 | PG&E- HINKLEY | FCE On-Site | Local |
| 2024-03-25 | PG&E- HINKLEY | FCE On-Site | U.S. EPA |
| 2024-03-25 | SO CAL GAS - ADELANTO | FCE On-Site | Local |
| 2024-03-25 | SB CO LANDFILL - VICTORVILLE | FCE On-Site | Local |
| 2024-03-25 | SBCO - BARSTOW LANDFILL | FCE On-Site | Local |
| 2024-03-21 | CAL NEV PIPELINE/DAGGETT BULK TERM | PCE On-Site | Local |
| 2024-03-21 | CEMEX LLC - BLACK MT. QUARRY | PCE On-Site | Local |
| 2024-03-21 | CEMEX LLC - RIVER PLANT | PCE On-Site | Local |
| 2024-03-20 | BUILDING MATERIALS MANUFACTURING CORP | FCE On-Site | Local |
| 2024-03-20 | BLUESCOPE COATED PRODUCTS LLC | FCE On-Site | Local |
| 2024-03-20 | SOUTHERN CALIFORNIA EDISON | FCE On-Site | Local |
| 2024-03-19 | SO CAL GAS - ADELANTO | PCE On-Site | Local |
| 2024-03-19 | ARROWHEAD REGIONAL MEDICAL CENTER — high-priority violation on file | FCE On-Site | Local |
| 2024-03-13 | INLAND EMPIRE UTILITIES AGENCY | FCE On-Site | Local |
| 2024-03-12 | GATX CORPORATION | FCE On-Site | Local |
| 2024-03-12 | CITY OF COLTON | FCE On-Site | Local |
| 2024-03-07 | SO CAL EDISON CO | FCE On-Site | Local |
| 2024-03-06 | SO CAL GAS - NEWBERRY SPRINGS | PCE On-Site | Local |
| 2024-03-06 | SO CAL GAS - KELSO | PCE On-Site | Local |
| 2024-03-06 | SAN BERNARDINO CO- SOLID WASTE MGMT | FCE On-Site | Local |
| 2024-03-06 | COLTON POWER, LP | FCE On-Site | Local |
| 2024-03-06 | JENSEN PRECAST | FCE On-Site | Local |
| 2024-03-05 | SO CAL GAS - SO. NEEDLES | PCE On-Site | Local |
| 2024-03-05 | SO CAL GAS - NO. NEEDLES | PCE On-Site | Local |
| 2024-03-05 | BECKER SPECIALTY CORP | FCE On-Site | Local |
| 2024-02-27 | AMERICAN SECURITY PRODUCTS | FCE On-Site | Local |
| 2024-02-23 | FONTANA PAPER MILLS INC | FCE On-Site | Local |
| 2024-02-23 | SAN BERNARDINO CO- SOLID WASTE MGMT | FCE On-Site | Local |
| 2024-02-22 | PHILLIPS 66 COLTON TERMINAL WEST | FCE On-Site | Local |
| 2024-02-22 | SORENSON ENGINEERING | FCE On-Site | Local |
| 2024-02-22 | PHILLIPS 66 - COLTON TERMINAL EAST | FCE On-Site | Local |
| 2024-02-19 | PG&E- TOPOCK | FCE On-Site | Local |
| 2024-02-13 | DUCOMMUN AEROSTRUCTURES (FRMLY AEROCHEM) | PCE On-Site | Local |
| 2024-02-13 | LOMA LINDA UNIVERSITY | FCE On-Site | Local |
| 2024-02-08 | FIBER CARE BATHS INC. | FCE On-Site | Local |
| 2024-02-08 | CALIFORNIA STEEL INDUSTRIES INC — high-priority violation on file | FCE On-Site | Local |
| 2024-02-08 | INLAND EMPIRE UTILITY AGENCY, A MUN WATER DIS | FCE On-Site | Local |
| 2024-01-12 | HIGH DESERT POWER PROJECT, LLC | FCE On-Site | Local |
PreviousPage 1Page 2 of 2
Dates as filed by the agency that recorded the inspection. Figures from EPA’s ICIS-AIR download.