EPA Air · inspections by county and year
Air-emissions inspections in Reno County, Kansas, 2023
- 40Inspections
A compliance evaluation is the on-site or file review a state, local or federal air agency records against a permitted source. Each row below is one inspection recorded against a source in Reno County, Kansas during 2023. A facility can appear several times: this is the year’s record of what happened, not a list of places. The sources themselves are on the Reno County facility page.
Air-emissions inspections in Reno County, other years
Air-emissions inspections recorded in Reno County, Kansas, 2023
| Date | Facility | Kind | Agency |
|---|---|---|---|
| 2023-12-13 | NUSTAR PIPELINE - HUTCHINSON PRODUCTS BREAKOUT TERMINAL | FCE On-Site | State |
| 2023-12-12 | HUTCHINSON SALT CO (AIR) | FCE On-Site | State |
| 2023-11-15 | ADE-WIFCO STEEL PRODUCTS (AIR) | FCE On-Site | State |
| 2023-11-14 | ARCONIC AEROSPACE CENTER (AIR) | FCE On-Site | State |
| 2023-10-23 | MORTON SALT (AIR) | FCE On-Site | State |
| 2023-10-13 | GEO CHEMICALS LLC (AIR) | FCE On-Site | State |
| 2023-09-18 | PDX PIPELINE - RENO CO. GAS PROC. PLANT (AIR) | FCE On-Site | State |
| 2023-09-18 | PDX PIPELINE - RENO CO. GAS PROC. PLANT (AIR) | PCE On-Site | State |
| 2023-09-11 | PANHANDLE EASTERN PIPE LINE - HAVEN STATION (AIR) | FCE On-Site | State |
| 2023-09-11 | ARK VALLEY ELECTRIC CO-OP - ARLINGTON SUBSTATION (AIR) | FCE On-Site | State |
| 2023-09-06 | ONEOK HYDROCARBON - HUTCHINSON FRACT. (AIR) | FCE On-Site | State |
| 2023-09-06 | ONEOK NGL PIPELINE - HUTCHINSON JUNCTION STATION | FCE On-Site | State |
| 2023-07-20 | KANSAS GAS SERVICE - SOUTH HUTCHINSON STATION (AIR) | FCE On-Site | State |
| 2023-07-19 | WILLIAMS HUTCH RAIL - HUTCHINSON TERM. (NGL STOR & LOAD)(AIR) | FCE On-Site | State |
| 2023-07-17 | TYSON PREPARED FOODS INC. - HUTCHINSON (N WASHINGTON) (AIR) | FCE On-Site | State |
| 2023-06-29 | HUTCHINSON CORRECTIONAL FACILITY - CENTRAL (AIR) | FCE On-Site | State |
| 2023-06-23 | KUHN KRAUSE INC. (BURN-OFF OVEN)(AIR) | FCE On-Site | State |
| 2023-06-14 | APAC-KANSAS SHEARS DIV - HUTCHINSON ASPHALT PLANT (AIR) | FCE On-Site | State |
| 2023-06-14 | CARGILL - HUTCHINSON (E 2ND)(AIR) | FCE On-Site | State |
| 2023-06-02 | EVERGY INC - HUTCHINSON ENERGY CENTER (AIR) | FCE On-Site | State |
| 2023-05-24 | RENO CO LANDFILL (AIR) | FCE On-Site | State |
| 2023-05-23 | SUPERIOR BOILER TECHNOLOGIES INC (AIR) | FCE On-Site | State |
| 2023-05-18 | ADM GRAIN - HUTCHINSON (816 N HALSTEAD) | FCE On-Site | State |
| 2023-05-18 | ADM GRAIN - HUTCHINSON (1 N HALSTEAD) (AIR) | FCE On-Site | State |
| 2023-05-18 | ADM GRAIN - HUTCHINSON (AIR) | FCE On-Site | State |
| 2023-05-18 | ADM GRAIN - HUTCHINSON (1700 N HALSTEAD) | FCE On-Site | State |
| 2023-05-10 | LOWEN CORP. (AIR) | FCE On-Site | State |
| 2023-05-02 | COLLINS BUS - SOUTH HUTCHINSON (AIR) | FCE On-Site | State |
| 2023-04-28 | KINCAID EQUIP. MFG. (AIR) | FCE On-Site | State |
| 2023-04-28 | JACKSON DAIRY - HUTCHINSON (AIR) | FCE On-Site | State |
| 2023-04-04 | CARGILL - HUTCHINSON (N HALSTEAD)(AIR) | FCE On-Site | State |
| 2023-04-02 | HUTCHINSON CORRECTIONAL FACILITY - CENTRAL (AIR) | PCE Off-Site | State |
| 2023-04-02 | ARK VALLEY ELECTRIC CO-OP - ARLINGTON SUBSTATION (AIR) | PCE Off-Site | State |
| 2023-03-09 | ADM - KANSAS PROTEIN FOODS (AIR) | FCE On-Site | State |
| 2023-03-06 | TYSON PREPARED FOODS - HUTCHINSON (S MAIN) (AIR) | FCE On-Site | State |
| 2023-03-06 | TYSON PREPARED FOODS - HUTCHINSON (S MAIN) (AIR) | PCE On-Site | State |
| 2023-01-26 | NUSTAR PIPELINE - HUTCHINSON PRODUCTS BREAKOUT TERMINAL | FCE On-Site | State |
| 2023-01-23 | ADE-WIFCO STEEL PRODUCTS (AIR) | FCE On-Site | State |
| 2023-01-20 | HUTCHINSON SALT CO (AIR) | FCE On-Site | State |
| 2023-01-03 | ARCONIC AEROSPACE CENTER (AIR) | FCE On-Site | State |
Dates as filed by the agency that recorded the inspection. Figures from EPA’s ICIS-AIR download.