EPA Air · inspections by county and year
Air-emissions inspections in Lea County, New Mexico, 2024
- 42Inspections
A compliance evaluation is the on-site or file review a state, local or federal air agency records against a permitted source. Each row below is one inspection recorded against a source in Lea County, New Mexico during 2024. A facility can appear several times: this is the year’s record of what happened, not a list of places. The sources themselves are on the Lea County facility page.
Lea County, New Mexico, 2024
Air-emissions inspections in Lea County, other years
Air-emissions inspections recorded in Lea County, New Mexico, 2024
| Date | Facility | Kind | Agency |
|---|---|---|---|
| 2024-09-26 | MALJAMAR GAS PLANT | FCE On-Site | State |
| 2024-09-26 | SALADO DRAW COMPRESSOR STATION | FCE On-Site | State |
| 2024-07-11 | MADDOX STATION | FCE On-Site | State |
| 2024-07-11 | CUNNINGHAM STATION POWER PLANT | FCE On-Site | State |
| 2024-07-11 | HOBBS GENERATING STATION | FCE On-Site | State |
| 2024-05-22 | FRAC CAT COMPRESSOR STATION | FCE On-Site | State |
| 2024-04-11 | SALADO DRAW 19 CTB AND CS — high-priority violation on file | PCE On-Site | U.S. EPA |
| 2024-04-11 | CHEVRON U.S.A. INC - SALADO DRAW 23 COMPRESSOR STATION & TANK BATTERY — high-priority violation on file | PCE On-Site | U.S. EPA |
| 2024-04-11 | NORTH BELL LAKE PAD 11 | PCE On-Site | U.S. EPA |
| 2024-04-11 | RED HILLS FACILITY PAD 2 | PCE On-Site | U.S. EPA |
| 2024-04-11 | BELL LAKE UNIT NORTH PAD 1 | PCE On-Site | U.S. EPA |
| 2024-04-11 | NORTH BELL LAKE PAD 18 | PCE On-Site | U.S. EPA |
| 2024-04-10 | TAP ROCK - BETTIS 20 STATE COM NO. 2H | PCE On-Site | U.S. EPA |
| 2024-04-10 | TAP ROCK - BETTIS 20 STATE COM NO. 3H | PCE On-Site | U.S. EPA |
| 2024-04-10 | TAP ROCK - BETTIS 20 STATE COM NO. 4H | PCE On-Site | U.S. EPA |
| 2024-04-10 | TAP ROCK - BETTIS 20 STATE COM NO. 5H | PCE On-Site | U.S. EPA |
| 2024-04-10 | TAP ROCK - BRININSTOOL 4 STATE NO. 4H | PCE On-Site | U.S. EPA |
| 2024-04-10 | TAP ROCK - JACKSON UNIT 22H | PCE On-Site | U.S. EPA |
| 2024-04-10 | TAP ROCK - JACKSON UNIT 23H | PCE On-Site | U.S. EPA |
| 2024-04-10 | TAP ROCK - JACKSON UNIT 28H | PCE On-Site | U.S. EPA |
| 2024-04-10 | TAP ROCK - MOGI 9 STATE COM 10H | PCE On-Site | U.S. EPA |
| 2024-04-10 | TAP ROCK - MOGI 9 STATE COM 11H | PCE On-Site | U.S. EPA |
| 2024-04-10 | HYPERION A CTB | PCE On-Site | U.S. EPA |
| 2024-04-10 | TAP ROCK - JACKSON UNIT 29H AND 30H FACILITY | PCE On-Site | U.S. EPA |
| 2024-04-10 | PAC MAN 36 FED COM BATTERY AND MERCHANT GAP #502H | PCE On-Site | U.S. EPA |
| 2024-04-10 | ZEUS CTB | PCE On-Site | U.S. EPA |
| 2024-04-10 | BRIDGE STATE 29 CTB#1 | PCE On-Site | U.S. EPA |
| 2024-04-10 | TAP ROCK - PROMETHEUS C CTB | PCE On-Site | U.S. EPA |
| 2024-04-09 | MADERA 24 FED NO1 | PCE On-Site | U.S. EPA |
| 2024-04-09 | MADERA 19 FED COM 26-35-10 5H 1H 2H 6H | PCE On-Site | U.S. EPA |
| 2024-04-09 | CAVE LION 26-35-5 FED 2H 6H 8H 9H 12H 15H CTB | PCE On-Site | U.S. EPA |
| 2024-04-09 | DOGIE DRAW ENDER WIGGINS PAD | PCE On-Site | U.S. EPA |
| 2024-04-09 | CHARLIE MURPHY 6 FED COM CTB | PCE On-Site | U.S. EPA |
| 2024-04-09 | MAMMOTH 1 FED COM CTB | PCE On-Site | U.S. EPA |
| 2024-04-09 | PAUL FOSTER CTB | PCE On-Site | U.S. EPA |
| 2024-04-09 | GREEN LIGHT CENTRAL TANK BATTERY | PCE On-Site | U.S. EPA |
| 2024-04-09 | LOE CENTRAL TANK BATTERY | PCE On-Site | U.S. EPA |
| 2024-04-09 | TATANKA NORTH CENTRAL TANK BATTERY | PCE On-Site | U.S. EPA |
| 2024-04-09 | THUNDERBIRD 1 TB FED 14H AND 1 WA FED 18H PRODUCTION FACILITY | PCE On-Site | U.S. EPA |
| 2024-04-09 | ENDER WIGGINS 14 FED COM CTB | PCE On-Site | U.S. EPA |
| 2024-02-08 | GROBE COMPRESSOR STATION | FCE On-Site | State |
| 2024-02-08 | BRININSTOOL COMPRESSOR STATION | FCE On-Site | State |
Dates as filed by the agency that recorded the inspection. Figures from EPA’s ICIS-AIR download.