EPA Air · inspections by state, industry and year
Pipeline transportation (NAICS 4862): inspections in Idaho, 2020
- 12Inspections
A compliance evaluation is the on-site or file review a state, local or federal air agency records against a permitted source. Each row is one inspection recorded during 2020 at a Idaho source whose primary industry code is NAICS 4862. A facility filing more than one industry code is counted under the first one on its record.
Pipeline transportation (NAICS 4862) in Idaho, other years
Other industries in Idaho, 2020
- Nonmetallic mineral product manufacturing (NAICS 3273) 34
- Mining and quarrying (NAICS 2123) 31
- Repair and maintenance (NAICS 8111) 18
- Petroleum and coal products manufacturing (NAICS 3241) 15
- Wood product manufacturing (NAICS 3211) 14
- Food manufacturing (NAICS 3114) 7
- Plastics and rubber products manufacturing (NAICS 3261) 6
- Waste management and remediation (NAICS 5622) 6
- Food manufacturing (NAICS 3115) 5
- Utilities (NAICS 2211) 4
- Food manufacturing (NAICS 3112) 3
- Administration of environmental programs (NAICS 9241) 3
- Transportation equipment manufacturing (NAICS 3362) 3
- Food manufacturing (NAICS 3111) 3
- Fabricated metal product manufacturing (NAICS 3323) 3
- Merchant wholesalers, durable goods (NAICS 4233) 3
Air-emissions inspections recorded in Idaho, 2020
| Date | Facility | Where | Kind | Agency |
|---|---|---|---|---|
| 2020-11-25 | NORTHWEST PIPELINE LLC LAVA HOT SPRINGS | TOPAZ (HISTORICAL), Bannock, ID | PCE On-Site | State |
| 2020-11-25 | NORTHWEST PIPELINE LLC PEGRAM | PEGRAM, Bear Lake, ID | PCE On-Site | State |
| 2020-11-25 | NORTHWEST PIPELINE LLC SODA SPRINGS | GEORGETOWN, Bear Lake, ID | PCE On-Site | State |
| 2020-05-11 | NORTHWEST PIPELINE LLC MOUNTAIN HOME | GLENNS FERRY, Elmore, ID | FCE Off-Site | State |
| 2020-05-06 | NORTHWEST PIPELINE GP OWYHEE | RIDDLE, Owyhee, ID | PCE Off-Site | State |
| 2020-05-04 | NORTHWEST PIPELINE LLC BOISE | BOISE, Ada, ID | FCE Off-Site | State |
| 2020-04-29 | NORTHWEST PIPELINE LLC BOISE | BOISE, Ada, ID | PCE Off-Site | State |
| 2020-04-23 | NORTHWEST PIPELINE LLC MOUNTAIN HOME | GLENNS FERRY, Elmore, ID | PCE Off-Site | State |
| 2020-04-01 | GAS TRANSMISSION NORTHWEST - COMPRESSOR STATION 03 - EASTPORT | EASTPORT, Boundary, ID | FCE On-Site | State |
| 2020-03-18 | NORTHWEST PIPELINE LLC BURLEY | BURLEY, Cassia, ID | PCE Off-Site | State |
| 2020-03-18 | NORTHWEST PIPELINE LLC BUHL | BUHL, Twin Falls, ID | PCE Off-Site | State |
| 2020-03-10 | GAS TRANSMISSION NORTHWEST - COMPRESSOR STATION 5 - ATHOL | ATHOL, Kootenai, ID | FCE On-Site | State |
Primary NAICS code as filed on the facility record; dates as filed by the agency that recorded the inspection. Figures from EPA’s ICIS-AIR download.