EPA Air · inspections by state, industry and year
Oil and gas extraction (NAICS 2111): inspections in Utah, 2019
- 107Inspections
A compliance evaluation is the on-site or file review a state, local or federal air agency records against a permitted source. Each row is one inspection recorded during 2019 at a Utah source whose primary industry code is NAICS 2111. A facility filing more than one industry code is counted under the first one on its record.
Oil and gas extraction (NAICS 2111) in Utah, other years
Other industries in Utah, 2019
- NAICS 9999 13
- Petroleum and coal products manufacturing (NAICS 3241) 11
- Utilities (NAICS 2211) 7
- Primary metal manufacturing (NAICS 3314) 6
- Waste management and remediation (NAICS 5622) 5
- Pipeline transportation (NAICS 4862) 4
- Nonmetallic mineral product manufacturing (NAICS 3273) 3
- National security and international affairs (NAICS 9281) 3
Air-emissions inspections recorded in Utah, 2019
| Date | Facility | Where | Kind | Agency |
|---|---|---|---|---|
| 2019-11-05 | GREEN NATURAL VENTURES, LLC LISBON (FORMERLY PARADOX MIDSTREAM) | UTAH, Undetermined, UT | FCE On-Site | State |
| 2019-08-28 | IRONHORSE COMPLEX | UTAH, Undetermined, UT | FCE On-Site | U.S. EPA |
| 2019-08-26 | DIABLO COMPRESSOR STATION | VERNAL, Uintah, UT | FCE On-Site | U.S. EPA |
| 2019-08-26 | OURAY COMPRESSOR STATION | VERNAL, Uintah, UT | FCE On-Site | U.S. EPA |
| 2019-08-26 | NORTH COMPRESSOR STATION | VERNAL, Uintah, UT | FCE On-Site | U.S. EPA |
| 2019-08-26 | ANTELOPE FLATS/SAND WASH COMPRESSOR STATIONS & SOUTH CENTRAL TANK BATTERY | VERNAL, Uintah, UT | FCE On-Site | U.S. EPA |
| 2019-08-15 | NEWFIELD/ENCANA UTE TRIBAL 11-10-4-1E OIL & GAS | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-08-15 | NEWFIELD/ENCANA UTE TRIBAL 13-9-4-1E | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-08-15 | CRESCENT POINT- KENDALL 13-7-3-1E | UINTAH COUNTY, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-08-15 | CRESCENT POINT- KENDALL TRIBAL 1-13-3-1W | UINTAH COUNTY, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-08-15 | CRESCENT POINT- KENDALL TRIBAL 1-13-3-1W-H1 | UINTAH COUNTY, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-08-15 | CRESCENT POINT- KENDALL TRIBAL 13-7-6-3-1E-H4 | UINTAH COUNTY, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-08-15 | CRESCENT POINT- KENDALL TRIBAL 4-18-3-1E-H3 | UINTAH COUNTY, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-08-15 | CRESCENT POINT- MERRITT 1-18-3-1E-H1 | UINTAH COUNTY, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-08-15 | CRESCENT POINT- MERRITT 3-18-3-1E | UINTAH COUNTY, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-08-15 | NEWFIELD/ENCANA- UTE TRIBAL 15-9-4-1E | UINTAH COUNTY, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-08-15 | NEWFIELD/ENCANA- UTE TRIBAL 3-10-4-1E | UINTAH COUNTY, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-08-15 | NEWFIELD/ENCANA- UTE TRIBAL 5-9-4-1E | UINTAH COUNTY, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-08-15 | NEWFIELD/ENCANA- UTE TRIBAL 9-9-4-1E | UINTAH COUNTY, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-08-14 | THORNE 4-21-3-2WH | UINTAH COUNTY, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-08-14 | FREEMAN 4-16B4 EP ENERGY | ALTAMONT, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-08-14 | EL PASO 4-21B4 EP ENERGY | ALTAMONT, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-08-14 | NEWFIELD/ENCANA LEJEUNE 1-17-3-2WH OIL & GAS NEWFIELD | MYTON, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-08-14 | NEWFIELD/ENCANA MURRAY 2-17 3-2-8-5-12H | MYTON, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-08-14 | EP ENERGY- DUCHESNE COUNTY 4-5C4 | DUCHESNE COUNTY, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-08-14 | EP ENERGY- EL PASO 3-21B4 | DUCHESNE COUNTY, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-08-14 | EP ENERGY- HEWETT 2-6C4 | DUCHESNE COUNTY, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-08-14 | EP ENERGY- HUNT 1-21B4 | DUCHESNE COUNTY, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-08-14 | EP ENERGY- KOZAR 2-5C4 | DUCHESNE COUNTY, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-08-14 | EP ENERGY- THOMAS 3-4C4 | DUCHESNE COUNTY, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-08-14 | EP ENERGY- UTE TRIBAL 1-28-B4 | DUCHESNE COUNTY, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-08-14 | EP ENERGY- YOUNG 4-6C4 | DUCHESNE COUNTY, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-08-13 | CRESCENT POINT- UTE TRIBAL 4-7-18-4-3E-H1 | UINTAH COUNTY, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-08-13 | EP ENERGY- UTE TRIBAL 2-13A3 | DUCHESNE COUNTY, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-08-13 | EP ENERGY- UTE TRIBAL 2-14A3 | DUCHESNE COUNTY, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-08-13 | UTE TRIBAL 3-13A3 | DUCHESNE COUNTY, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-08-13 | UTE LB 1-13A3 | UINTAH COUNTY, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-08-13 | UTE TRIBAL 2-22-27-3-2E-H1 & UTE TRIBAL 3-22-27-3-2E-H1 | UINTAH COUNTY, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-08-13 | UTE TRIBAL 3-35-2-3-2E-H1 | UINTAH COUNTY, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-08-13 | UTE TRIBAL 3-34A1E | UINTAH COUNTY, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-08-13 | UTE 4-34A1E | UINTAH COUNTY, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-07-23 | KINDER MORGAN LLC - ALTAMONT EAST | ALTAMONT, Duchesne, UT | FCE On-Site | State |
| 2019-07-23 | KINDER MORGAN LLC - WEST STATION | DUCHESNE, Duchesne, UT | FCE On-Site | State |
| 2019-07-23 | KINDER MORGAN ALTAMONT - SOUTH | DUCHESNE, Duchesne, UT | FCE On-Site | State |
| 2019-06-14 | WHITING OIL & GAS - FAIRVIEW 31E | FAIRVIEW, Sanpete, UT | FCE On-Site | State |
| 2019-06-13 | WAPITI OPERATING LLC | UTAH, Undetermined, UT | FCE On-Site | State |
| 2019-06-13 | WAPITI OPERATING LLC | UTAH, Undetermined, UT | FCE On-Site | State |
| 2019-06-13 | WAPITI OPERATING LLC | UTAH, Undetermined, UT | FCE On-Site | State |
| 2019-05-23 | MULLINS 11-14-3-2W NEWFIELD | DUCHESNE, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-23 | DILLMAN 10-17-3-2W NEWFIELD | MYTON, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-23 | NEWFIELD/ENCANA LEJEUNE 1-17-3-2WH OIL & GAS NEWFIELD | MYTON, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-23 | NEWFIELD/ENCANA MURRAY 2-17 3-2-8-5-12H | MYTON, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-23 | MILES 15-8-3-2W OIL & GAS NEWFIELD | MYTON, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-23 | ANDRE 15-7-6-3-2WH NEWFIELD | MYTON, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-23 | SPROUSE UT 15-7 3-2-18-19-1H NEWFIELD | MYTON, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-23 | SPROUSE UT 15-7 3-2-18-19-3H NEWFIELD | MYTON, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-23 | SPROUSE UT 15-7 3-2-18-19-5H NEWFIELD | MYTON, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-23 | ANDRE 14-7-6-3-2WH NEWFIELD | MYTON, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-23 | UTE TRIBAL 3-28-4-2E NEWFIELD | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-23 | UTE TRIBAL 13-21-4-2E NEWFIELD | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-23 | NEWFIELD/ENCANA UTE TRIBAL 11-10-4-1E OIL & GAS | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-23 | NEWFIELD/ENCANA UTE TRIBAL 13-9-4-1E | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-23 | UTE TRIBAL 11-9-4-1E NEWFIELD | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-22 | BOWERS 1-6-4-2E CRESCENT POINT | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-22 | DEEP CREEK 14-9-4-2E CRESCENT POINT | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-22 | DEEP CREEK 2-16-4-2E CRESCENT POINT | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-22 | DEEP CREEK 7-16-4-2E CRESCENT POINT | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-22 | DEEP CREEK 5-16-4-2E CRESCENT POINT | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-22 | DEEP CREEK 6-16-4-2E CRESCENT POINT | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-22 | COLEMAN TRIBAL 7-18-4-2E CRESCENT POINT | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-22 | COLEMAN TRIBAL 14-18-4-2E CRESCENT POINT | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-22 | COLEMAN TRIBAL 16-18-4-2E CRESCENT POINT | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-22 | COX 12-31-3-1E CRESCENT POINT | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-22 | SITE DIRECTLY EAST OF COX 12-31-3-1E CRESCENT POINT | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-22 | COLEMAN TRIBAL 13-29-20-3-1E-H1 CRESCENT POINT | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-22 | COLEMAN CORDOVA 14-28-3-1E-H1 CRESCENT POINT | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-22 | NEXT TO COLEMAN CORDOVA 14-28-3-1E-H1 CRESCENT POINT | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-22 | ULT 12-34-3-1E CRESCENT POINT | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-22 | UTE ENERGY 14-27-3-1E CRESCENT POINT | RANDLETT, Uintah, UT | PCE On-Site | U.S. EPA |
| 2019-05-21 | AUBREY 2-15-22-3-2WH NEWFIELD | MYTON, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-21 | RANCH 15-10-3-3-2W-MW NEWFIELD | MYTON, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-21 | UTE TRIBAL 14-10-3-3-2W-UW NEWFIELD | MYTON, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-21 | RANCH 16-10-3-3-2WH NEWFIELD | MYTON, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-21 | AUBREY 1A-15-22-3-2-WH NEWFIELD | MYTON, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-21 | DART 13-11-2-3-2WH NEWFIELD | MYTON, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-21 | UTE TRIBAL 3-14-23-3-2WH NEWFIELD | MYTON, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-21 | MOON 2-33C4 EP ENERGY | DUCHESNE, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-21 | MOON 3-32C4 EP ENERGY | DUCHESNE, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-21 | FREEMAN 4-16B4 EP ENERGY | ALTAMONT, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-21 | EL PASO 3-21B4 EP ENERGY | ALTAMONT, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-21 | ADJACENT TO EL PASO 1-28B4 EP ENERGY | ALTAMONT, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-21 | EL PASO 1-28B4 EP ENERGY | ALTAMONT, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-21 | EL PASO 4-21B4 EP ENERGY | ALTAMONT, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-21 | VASQUEZ 3-7C4 EP ENERGY | DUCHESNE, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-21 | CHESTNUT 3-17C4 EP ENERGY | DUCHESNE, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-21 | BRUCE 2-14-3-2-14-23-1H NEWFIELD | ROOSEVELT, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-21 | JENSEN 2-9C4 EP ENERGY | DUCHESNE, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-05-21 | MARQUEZ 2-17C4 EP ENERGY | DUCHESNE, Duchesne, UT | PCE On-Site | U.S. EPA |
| 2019-03-14 | BLUE FEATHER BATTERY | VERNAL, Uintah, UT | FCE On-Site | U.S. EPA |
| 2019-03-14 | L-16 COMPRESSOR STATION | VERNAL, Uintah, UT | FCE On-Site | U.S. EPA |
Page 1 of 2NextPage 2
Primary NAICS code as filed on the facility record; dates as filed by the agency that recorded the inspection. Figures from EPA’s ICIS-AIR download.