FIRST CUT DESIGN & FABRICATION INC, Richburg, SC: Clean Air Act compliance record, inspections, violations, penalties

FIRST CUT DESIGN & FABRICATION INC is on EPA’s ICIS-AIR register at 4818 MORRISON RD, Richburg in Chester County, South Carolina: operating status operating, emissions classification synthetic minor source, current violation status “No Violation Identified”.

What stands out

  • The newest of the 11 events on file is a compliance evaluation dated April 29, 2026.
  • Its events on file run from July 12, 2022 through April 29, 2026.
  • Of the 1 formal enforcement action on file, 1 carries a filed penalty above zero. The largest on file is $9,900, filed April 14, 2025.
  • Of its 6 compliance evaluations on file, 3 are a full compliance evaluation.
  • The register holds 42 air-emissions sources in Chester County, South Carolina.

Every line is computed by formula from the record’s stored figures; nothing is estimated.

Identity

Facility as filedFIRST CUT DESIGN & FABRICATION INC
ICIS-AIR IDSC00006400083
EPA facility registry ID110070943075
Operating statusOperating
Emissions classificationSynthetic minor source
Current violation status (HPV field)No Violation Identified
Address4818 MORRISON RD, Richburg, SC 29729
CountyChester County
In a nonattainment countyNo (EPA Green Book)
Industry (NAICS)Fabricated metal product manufacturing (NAICS 3329)
EPA region04

Programs and pollutants

The program, pollutant and Title V files are not loaded: what this page covers.

Compliance evaluations

DateWhat EPA recordedAgencyPrograms
April 29, 2026FCE On-SiteStateState Implementation Plan for National Primary and Secondary Ambient Air Quality Standards
March 25, 2026PCE On-SiteStateState Implementation Plan for National Primary and Secondary Ambient Air Quality Standards
June 25, 2024FCE On-SiteStateState Implementation Plan for National Primary and Secondary Ambient Air Quality Standards
June 12, 2024PCE On-SiteStateState Implementation Plan for National Primary and Secondary Ambient Air Quality Standards
August 30, 2022FCE On-SiteStateState Implementation Plan for National Primary and Secondary Ambient Air Quality Standards
July 12, 2022PCE On-SiteStateState Implementation Plan for National Primary and Secondary Ambient Air Quality Standards

Violations

What high-priority and federally reportable violations mean.

DateWhat EPA recordedAgencyPrograms
June 25, 2024Earliest FRV determinationState40 CFR Part 63 Area Sources; State Implementation Plan for National Primary and Secondary Ambient Air Quality Standards
September 14, 2022Earliest FRV determinationState40 CFR Part 63 Area Sources

Enforcement and penalties

1 of the formal enforcement actions carry a penalty filed above zero. How a penalty is shown.

DateWhat EPA recordedAgencyPenalty, as filed
April 14, 2025Administrative OrderState$9,900

Informal enforcement

DateWhat EPA recordedAgency
November 18, 2024Notice of ViolationState
March 25, 2024Notice of ViolationState

Stack tests

EPA’s stack test file holds no test at ICIS-AIR SC00006400083 since January 1, 2017.

Watch FIRST CUT DESIGN & FABRICATION INC

One source — $99/month

Billing

Privacy

Free from EPA: Detailed Facility Report, ECHO Notify (registry ID 110070943075).

Other air sources in South Carolina beside FIRST CUT DESIGN & FABRICATION INC

EPA ICIS-AIR download, loaded September 14, 2026.