EPA Air · stack tests by state, industry and year
Transportation equipment manufacturing (NAICS 3361): stack tests in Michigan, 2024
- 10Stack tests
A stack test measures what a source actually emits, at the stack, against the limit in its permit. Each row is one stack test recorded during 2024 at a Michigan source whose primary industry code is NAICS 3361. A facility filing more than one industry code is counted under the first one on its record.
Transportation equipment manufacturing (NAICS 3361) in Michigan, other years
Other industries in Michigan, 2024
- Utilities (NAICS 2211) 25
- Waste management and remediation (NAICS 5622) 16
- Petroleum and coal products manufacturing (NAICS 3241) 15
- Utilities (NAICS 2212) 13
- Pipeline transportation (NAICS 4862) 8
- Primary metal manufacturing (NAICS 3311) 8
- Utilities (NAICS 2213) 7
- Chemical manufacturing (NAICS 3251) 5
- Educational services (NAICS 6113) 5
- Wood product manufacturing (NAICS 3211) 4
- Paper manufacturing (NAICS 3221) 4
- Transportation equipment manufacturing (NAICS 3363) 4
- Fabricated metal product manufacturing (NAICS 3328) 4
- Primary metal manufacturing (NAICS 3315) 4
- Plastics and rubber products manufacturing (NAICS 3261) 4
- Nonmetallic mineral product manufacturing (NAICS 3279) 4
Air-emissions stack tests recorded in Michigan, 2024
| Date | Facility | Where | Kind | Agency |
|---|---|---|---|---|
| 2024-12-19 | GENERAL MOTORS LLC - ORION ASSEMBLY | LAKE ORION, Oakland, MI | Pass | State |
| 2024-10-25 | GENERAL MOTORS LLC DETROIT-HAMTRAMCK ASSEMBLY | DETROIT, Wayne, MI | Pass | State |
| 2024-09-09 | GENERAL MOTORS LLC DETROIT-HAMTRAMCK ASSEMBLY | DETROIT, Wayne, MI | Pass | State |
| 2024-09-03 | FORD MOTOR COMPANY - FLAT ROCK ASSEMBLY | FLAT ROCK, Wayne, MI | Pass | State |
| 2024-08-15 | FCA US LLC STERLING HEIGHTS ASSEMBLY PLANT | STERLING HEIGHTS, Macomb, MI | Pass | State |
| 2024-07-29 | GENERAL MOTORS LLC DETROIT-HAMTRAMCK ASSEMBLY | DETROIT, Wayne, MI | Pass | State |
| 2024-07-16 | FORD MOTOR COMPANY WAYNE COMPLEX | WAYNE, Wayne, MI | Pass | State |
| 2024-06-03 | FCA US LLC STERLING HEIGHTS ASSEMBLY PLANT | STERLING HEIGHTS, Macomb, MI | Pass | State |
| 2024-05-30 | FORD MOTOR COMPANY - FLAT ROCK ASSEMBLY | FLAT ROCK, Wayne, MI | Pass | State |
| 2024-03-26 | GENERAL MOTORS LLC-LANSING DELTA TOWNSHIP | LANSING, Eaton, MI | Pass | State |
Primary NAICS code as filed on the facility record; dates as filed by the agency that recorded the stack test. Figures from EPA’s ICIS-AIR download.