EPA Air · stack tests by state, industry and year
Utilities (NAICS 2211): stack tests in New Hampshire, 2020
- 25Stack tests
A stack test measures what a source actually emits, at the stack, against the limit in its permit. Each row is one stack test recorded during 2020 at a New Hampshire source whose primary industry code is NAICS 2211. A facility filing more than one industry code is counted under the first one on its record.
Utilities (NAICS 2211) in New Hampshire, other years
Other industries in New Hampshire, 2020
- Waste management and remediation (NAICS 5622) 15
- Utilities (NAICS 2213) 5
- Wood product manufacturing (NAICS 3211) 4
- Mining and quarrying (NAICS 2123) 4
- Paper manufacturing (NAICS 3221) 3
Air-emissions stack tests recorded in New Hampshire, 2020
| Date | Facility | Where | Kind | Agency |
|---|---|---|---|---|
| 2020-12-10 | MERRIMACK STATION | BOW, Merrimack, NH | Pass | State |
| 2020-09-03 | NEWINGTON ENERGY | NEWINGTON, Rockingham, NH | Pass | State |
| 2020-09-03 | NEWINGTON ENERGY | NEWINGTON, Rockingham, NH | Pass | State |
| 2020-08-20 | BRIDGEWATER POWER COMPANY, L.P. | BRIDGEWATER, Grafton, NH | Pass | State |
| 2020-08-20 | BRIDGEWATER POWER COMPANY, L.P. | BRIDGEWATER, Grafton, NH | Pass | State |
| 2020-08-05 | GRANITE RIDGE ENERGY, LLC | LONDONDERRY, Rockingham, NH | Pass | State |
| 2020-08-05 | GRANITE RIDGE ENERGY, LLC | LONDONDERRY, Rockingham, NH | Pass | State |
| 2020-07-31 | NE RENEWABLE POWER BETHLEHEM | BETHLEHEM, Grafton, NH | Pass | State |
| 2020-07-31 | NE RENEWABLE POWER BETHLEHEM | BETHLEHEM, Grafton, NH | Pass | State |
| 2020-07-29 | NE RENEWABLE POWER TAMWORTH — high-priority violation on file | TAMWORTH, Carroll, NH | Fail | State |
| 2020-07-29 | NE RENEWABLE POWER TAMWORTH — high-priority violation on file | TAMWORTH, Carroll, NH | Pass | State |
| 2020-07-09 | GSP NEWINGTON LLC | NEWINGTON, Rockingham, NH | Pass | State |
| 2020-06-10 | BURGESS BIOPOWER | BERLIN, Coos, NH | Pass | State |
| 2020-05-26 | MERRIMACK STATION | BOW, Merrimack, NH | Pass | State |
| 2020-05-22 | SCHILLER STATION COMBUSTION TURBINE | PORTSMOUTH, Rockingham, NH | Pass | State |
| 2020-05-22 | SCHILLER STATION COMBUSTION TURBINE | PORTSMOUTH, Rockingham, NH | Pass | State |
| 2020-05-06 | MERRIMACK STATION | BOW, Merrimack, NH | Pass | State |
| 2020-03-20 | LOST NATION GENERATING STATION | NORTHUMBERLAND, Coos, NH | Pass | State |
| 2020-03-19 | WHITE LAKE STATION | TAMWORTH, Carroll, NH | Pass | State |
| 2020-02-06 | MERRIMACK STATION | BOW, Merrimack, NH | Pass | State |
| 2020-02-06 | MERRIMACK STATION | BOW, Merrimack, NH | Pass | State |
| 2020-02-06 | MERRIMACK STATION | BOW, Merrimack, NH | Pass | State |
| 2020-02-05 | MERRIMACK STATION | BOW, Merrimack, NH | Pass | State |
| 2020-01-28 | SCHILLER STATION COMBUSTION TURBINE | PORTSMOUTH, Rockingham, NH | Pass | State |
| 2020-01-21 | MERRIMACK STATION | BOW, Merrimack, NH | Pass | State |
Primary NAICS code as filed on the facility record; dates as filed by the agency that recorded the stack test. Figures from EPA’s ICIS-AIR download.