Utilities (NAICS 2211): violations in Alaska, 2018

A high-priority violation is the most serious class of Clean Air Act non-compliance an agency records against a source; a federally reportable violation is the next step down in severity. Each row is one violation recorded during 2018 at a Alaska source whose primary industry code is NAICS 2211. A facility filing more than one industry code is counted under the first one on its record.

Utilities (NAICS 2211) in Alaska, other years

Other industries in Alaska, 2018

High-priority air violations recorded in Alaska, 2018

DateFacilityWhereKindAgency
2018-12-28NAKNEK ELECTRIC ASSOCIATION, INC. / NAKNEK POWER PLANTKING SALMON, Bristol Bay, AKEarliest FRV determinationState
2018-10-12AURORA ENERGY LLC / CHENA POWER PLANT — high-priority violation on fileFAIRBANKS, Fairbanks North Star, AKEarliest FRV determinationState
2018-10-08NORTH SLOPE BOROUGH / WAINWRIGHT POWER PLANTNORTH SLOPE BOROUGH, North Slope, AKEarliest FRV determinationState
2018-10-08CITY OF GALENA / GALENA ELECTRIC UTILITYGALENA, Yukon-Koyukuk (CA), AKEarliest FRV determinationState
2018-10-04NORTH SLOPE BOROUGH / POINT HOPE POWER PLANTNORTH SLOPE BOROUGH, North Slope, AKEarliest FRV determinationState
2018-10-02NORTH SLOPE BOROUGH / KAKTOVIK POWER PLANTNORTH SLOPE BOROUGH, North Slope, AKEarliest FRV determinationState
2018-08-05AURORA ENERGY LLC / CHENA POWER PLANT — high-priority violation on fileFAIRBANKS, Fairbanks North Star, AKHPV day-zero determinationState
2018-07-30DOYON UTILITIES, LLC / DU-JBER-ELECTRIC, GAS, DRINKING WATER AANCHORAGE, Anchorage Municipality, AKEarliest FRV determinationState
2018-07-17DOYON UTILITIES, LLC / DU-JBER-ELECTRIC, GAS, DRINKING WATER AANCHORAGE, Anchorage Municipality, AKEarliest FRV determinationState
2018-07-17DOYON UTILITIES, LLC / DU-JBER-ELECTRIC, GAS, DRINKING WATER AANCHORAGE, Anchorage Municipality, AKEarliest FRV determinationState
2018-03-26GOLDEN VALLEY ELECTRIC ASSOCIATION / HEALY POWER PLANT — high-priority violation on fileHEALY, Denali, AKHPV day-zero determinationState
2018-02-27ALASKA ELECTRIC LIGHT & POWER / INDUSTRIAL POWER PLANT (JUNEAU)JUNEAU, Juneau City and Borough, AKEarliest FRV determinationState
2018-02-07ALASKA VILLAGE ELECTRIC COOPERATIVE / EMMONAK POWER PLANTALASKA, Undetermined, AKEarliest FRV determinationState
2018-01-09COPPER VALLEY ELECTRIC ASSOCIATION / VALDEZ DIESEL POWER PLANTVALDEZ, Valdez-Cordova (CA), AKEarliest FRV determinationState

Primary NAICS code as filed on the facility record; dates as filed by the agency that recorded the violation. Figures from EPA’s ICIS-AIR download.