Velarion Records
Free. Unsubscribe any time.

Motor carrier · USDOT 1974107

JOE BRANCH ELECTRIC INC, Chester, CA: USDOT 1974107 safety record, inspections, out-of-service, crashes

What stands out

  • Of 143 Plumas County carriers, 73% file fewer power units than 3 power units, 8.4% file the same and 18% file more.
  • Its fleet of 3 power units is above the middle fleet of Plumas County carriers (1 power unit), 3.0 times it.
  • It registered on December 9, 2009, 14 years before the MCS-150 filed April 10, 2024.
  • It files 1.0 drivers per power unit (3 drivers on 3 power units).

JOE BRANCH ELECTRIC INC among Plumas County carriers

By power units, JOE BRANCH ELECTRIC INC is number 27 of 143 Plumas County carriers, level with 12 that also file 3; the county’s middle fleet is 1 power unit.

JOE BRANCH ELECTRIC INC, USDOT 1974107, MCS-150 filed April 10, 2024: 3 power units (3 trucks), 3 drivers (0 with a CDL), 90,000 miles in 2023; Chester, CA 96020, Plumas County; active on the census; Intrastate Non-Hazmat Carriers; no hazardous materials; not rated by FMCSA; hauls Building Materials, Other, Construction; registered December 9, 2009.

Plumas County carriers nearest JOE BRANCH ELECTRIC INC in fleet size

Roadside inspections

Velarion’s copy of the inspection file holds no inspection for USDOT 1974107.

Crashes

Velarion’s copy of the crash file holds no crash for USDOT 1974107.

Watch USDOT 1974107

One carrier, $49/month: the register files for USDOT 1974107. What the watch covers →

One carrier — $49/month

Billing

Privacy

Source: FMCSA Company Census File (loaded October 15, 2026), FMCSA’s inspection and crash files. How these figures are made →