Velarion Records
Free. Unsubscribe any time.

Motor carrier · USDOT 2936081

ALL PHASE REMODELING, Jackson, CA: USDOT 2936081 safety record, inspections, out-of-service, crashes

What stands out

  • Of 267 Amador County carriers, 0.4% file fewer power units than 1 power unit, 75% file the same and 25% file more.
  • Its fleet of 1 power unit equals the middle fleet of Amador County carriers.
  • It registered on October 7, 2016, under a year before the MCS-150 filed October 7, 2016.
  • It files 4.0 drivers per power unit (4 drivers on 1 power unit).

ALL PHASE REMODELING among Amador County carriers

By power units, ALL PHASE REMODELING is number 67 of 267 Amador County carriers, level with 200 that also file 1; the county’s middle fleet is 1 power unit.

ALL PHASE REMODELING (doing business as BRYAN HOPKINS DOING BUSINESS AS ALL PHASE REMODELING), USDOT 2936081, MCS-150 filed October 7, 2016: 1 power unit (1 truck), 4 drivers (0 with a CDL); Jackson, CA 95642, Amador County; active on the census; Intrastate Non-Hazmat Carriers; no hazardous materials; not rated by FMCSA; hauls Building Materials, Garbage, Refuse, Trash, Logs, Poles, Beams, Lumber, Construction; registered October 7, 2016.

Amador County carriers nearest ALL PHASE REMODELING in fleet size

Roadside inspections

Velarion’s copy of the inspection file holds no inspection for USDOT 2936081.

Crashes

Velarion’s copy of the crash file holds no crash for USDOT 2936081.

Watch USDOT 2936081

One carrier, $49/month: the register files for USDOT 2936081. What the watch covers →

One carrier — $49/month

Billing

Privacy

Source: FMCSA Company Census File (loaded October 15, 2026), FMCSA’s inspection and crash files. How these figures are made →