Velarion Records
Free. Unsubscribe any time.

Motor carrier · USDOT 3186223

PHASE 1 CONSTRUCTION INC, Atwater, CA: USDOT 3186223 safety record, inspections, out-of-service, crashes

What stands out

  • Of 3,067 Merced County carriers, 90% file fewer power units than 4 power units, 2.5% file the same and 7.5% file more.
  • Its fleet of 4 power units is above the middle fleet of Merced County carriers (1 power unit), 4.0 times it.
  • It registered on September 11, 2018, 7 years before the MCS-150 filed January 16, 2026.
  • It files 0.5 drivers per power unit (2 drivers on 4 power units).

PHASE 1 CONSTRUCTION INC among Merced County carriers

By power units, PHASE 1 CONSTRUCTION INC is number 231 of 3,067 Merced County carriers, level with 77 that also file 4; the county’s middle fleet is 1 power unit.

PHASE 1 CONSTRUCTION INC, USDOT 3186223, MCS-150 filed January 16, 2026: 4 power units (4 trucks), 2 drivers (2 with a CDL), 120,000 miles in 2024; Atwater, CA 95301, Merced County; active on the census; Interstate Carriers; no hazardous materials; not rated by FMCSA; hauls Building Materials, Construction, General Freight; registered September 11, 2018.

Merced County carriers nearest PHASE 1 CONSTRUCTION INC in fleet size

Roadside inspections

Velarion’s copy of the inspection file holds no inspection for USDOT 3186223.

Crashes

Velarion’s copy of the crash file holds no crash for USDOT 3186223.

Watch USDOT 3186223

One carrier, $49/month: the register files for USDOT 3186223. What the watch covers →

One carrier — $49/month

Billing

Privacy

Source: FMCSA Company Census File (loaded October 15, 2026), FMCSA’s inspection and crash files. How these figures are made →