NPDES AKR10GF17 · Clean Water Act
MARBLE WAY FISH PASSAGE PROJECT, Wasilla, AK: NPDES AKR10GF17 discharge permit, effluent exceedances, inspections, penalties
MARBLE WAY FISH PASSAGE PROJECT, Wasilla, Alaska: General permit coverage AKR10GF17, held by TUTKA LLC; Construction stormwater; Administratively continued; issued April 14, 2020, term to January 31, 2021, by ADEC; discharges to COTTONWOOD CREEK.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 13 were issued before AKR10GF17.
Coverages issued nearest AKR10GF17
- 2019-06-10: BEAVER LOOP ROAD IMPROVEMENTS PEDESTRIAN PATHWAY, Kenai: AKR10GB38, held by QAP
- 2019-06-14: BEAVER LOOP ROAD IMPROVEMENTS PEDESTRIAN PATHWAY, Kenai: AKR10GB39, held by AK DOT & PF
- 2019-07-31: MINNESOTA SEWARD TO TUDOR AND INTL TO RASPBERRY, Anchorage: AKR10GC64, held by QAP
- 2019-08-20: TCC PARKING LOT EXCAVATION, Fairbanks: AKR10GD13, held by GHEMM Company
- 2020-03-03: SEWARD HIGHWAY MP 100 TO 105 IMPROVEMENTS, Girdwood: AKR10GE56, held by Mass Excavation, Inc.
- 2020-04-20: UNIVERSITY AVE SEGMENT 2A DNR TO REWAK DR, Fairbanks: AKR10GF25, held by AK DOT& PF
- 2020-04-23: MARBLE WAY FISH PASSAGE PROJECT, Wasilla: AKR10GF22, held by Matanuska Susitna Borough
- 2020-06-23: TRUNK ROAD REINFORCEMENT SOUTH, Palmer: AKR10GG98, held by Enstar Natural Gas Company
- 2020-06-24: 2020 EAGLE RIVER UNDERGROUNDING 121679, Eagle River: AKR10GH20, held by Lineworks, LLC
- 2020-06-25: 2020 EAGLE RIVER UNDERGROUNDING 121679, Eagle River: AKR10GH21, held by Matanuska Electric Association, Inc
MARBLE WAY FISH PASSAGE PROJECT among its neighbors
Its county: 248, 0 major; AKR10GF17 is minor permit.
Other permits in the county
- 12 ACRE BIG LAKE, Wasilla: AKR10H07T, minor, term to 2026-01-31
- 2012 SOUTHCENTRAL FLOOD REPAIRS 12-66-M_2, Sutton: AKR10GL97, minor, term to 2026-01-31
- 2012 SOUTHCENTRAL FLOODING REPAIRS 12-66-M, Sutton: AKR10GK87, minor, term to 2026-01-31
- ACADEMY CHARTER SCHOOL, Palmer: AKR10H117, minor, term to 2031-01-31
- AKARNG ALCANTARA, Wasiia: AKR10H0L0, minor, term to 2026-01-31
- ALL SEASONS CLOTHING COMPANY, Wasilla: AKR10H0F1, minor, term to 2026-01-31
- AMERICAN CHARTER ACADEMY - WASILLA, Wasilla: AKR10H0XF, minor, term to 2031-01-31
- ANTIMONY MILLS FACILITY SITE, Point Mckenzie: AKR10H16K, minor, term to 2031-01-31
- AOGCC ORPHAN WELL PLUGGING AND REMEDIATION PROGRAM CHICKALOON #1 SITE PREPARATIO, Chickaloon: AKR10H10K, minor, term to 2031-01-31
- AOGCC ORPHAN WELL PLUGGING AND REMEDIATION PROGRAM CHICKALOON #1 SITE PREPARATIO, Chickaloon: AKR10H10M, minor, term to 2031-01-31
What stands out
- Its term runs 292 days, April 14, 2020 to January 31, 2021; the term ended 2,053 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | MARBLE WAY FISH PASSAGE PROJECT |
|---|---|
| Permittee | TUTKA LLC |
| NPDES ID | AKR10GF17 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 14, 2020 |
| Expires | January 31, 2021 |
| Agency | ADEC |
| Address | Wasilla, AK 99654 |
| Receiving water | COTTONWOOD CREEK |
NPDES AKR10GF17: effluent limits and exceedances
MARBLE WAY FISH PASSAGE PROJECT (NPDES AKR10GF17): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10GF17: no pollutant row on file.
NPDES AKR10GF17: inspections, violations and enforcement
NPDES AKR10GF17 (MARBLE WAY FISH PASSAGE PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10GF17
NPDES AKR10GF17: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10GF17
NPDES AKR10GF17: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.