NPDES AKR10GL73 · Clean Water Act
GLENN HIGHWAY AT MIRROR LAKE MILE POST 23-25, Chugiak, AK: NPDES AKR10GL73 discharge permit, effluent exceedances, inspections, penalties
GLENN HIGHWAY AT MIRROR LAKE MILE POST 23-25, Chugiak, Alaska: General permit coverage AKR10GL73, held by AK DOT&PF; Construction stormwater; Effective; issued May 17, 2021, term to January 31, 2026, by ADEC; discharges to Various Waterbodies.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 88 were issued before AKR10GL73. AK DOT&PF holds 7 permits in Alaska.
Other permits held by AK DOT&PF
- SEWARD HWY PASSING LANES MP 37-52 PAVEMENT PRESERV, Cooper Landing: AKR10GF58, issued 2021-04-27
- DILLINGHAM DOWNTOWN STREETS REHABILITATION_3, Dillingham: AKR10GF59, issued 2021-04-21
- 2012 SOUTHCENTRAL FLOOD REPAIRS 12-66-M_2, Sutton: AKR10GL97, issued 2021-05-21
- HSIP GLENN HWY MEDIAN BARRIER MP 30-GLENN HWY MP, Palmer: AKR10GM87, issued 2021-06-28
- KENAI AREA REPAIRS - NOV 2018 EQ PR_2, Anchor Point: AKR10GP50, issued 2022-03-22
- ANC TERMINAL LOOP ROAD IMPROVEMENTS_2, Anchorage: AKR10GP69, issued 2022-03-30
Coverages issued nearest AKR10GL73
- 2021-05-17: THE RANCH SD PH. 5A, Wasilla: AKR10EN23, held by Rex Turner - Arctic Devco, Inc.
- 2021-05-17: DOVE TREE II, Eagle River: AKR10ES03, held by Andre Spinelli - Spinell Homes Inc
- 2021-05-17: EAGLES NEST CONDOS, Eagle River: AKR10FS53, held by Andre Spinelli - Spinell Homes Inc
- 2021-05-17: OWLS NEST SUBDIVISION, Eagle River: AKR10GG09, held by Andre Spinelli - Spinell Homes Inc
- 2021-05-17: THE GARAGES PH. 2, Anchorage: AKR10GH17, held by Andre Spinelli - Spinell Homes Inc
- 2021-05-17: FTG233 COMMUNICATIONS CENTER, Fort Greely: AKR10GL78, held by Jed Shandy - Davis Constructors Engineers
- 2021-05-17: ANCHORAGE REGIONAL LANDFILL MAINTENANCE AND ADMIN, Eagle River: AKR10GL91, held by Joseph Jolley - Cornerstone General Contractors
- 2021-05-21: 2012 SOUTHCENTRAL FLOOD REPAIRS 12-66-M_2, Sutton: AKR10GL97, held by AK DOT&PF
- 2021-05-25: KALSKAG CEMETERY ROAD, Kalskag: AKR10GM07, held by Julia Doris - Native Village of Kalskag
- 2021-05-26: ANCHORAGE REGIONAL LANDFILL MAINTENANCE AND ADMIN_2, Eagle River: AKR10GM09, held by Cornerstone General Contractors
GLENN HIGHWAY AT MIRROR LAKE MILE POST 23-25 among its neighbors
135 discharge permits are in the Knik Arm-Frontal Cook Inlet subwatershed (HUC 190204010808); AKR10GL73 is one. Its county: 555, 4 major; AKR10GL73 is minor permit.
Other permits in the Knik Arm-Frontal Cook Inlet subwatershed (HUC 190204010808)
- 36TH AVENUE RESURFACING PHASE I, Anchorage: AKR10GN68, minor, term to 2026-01-31
- 36TH AVENUE RESURFACING PHASE I_2, Anchorage: AKR10GO10, minor, term to 2026-01-31
- 36TH AVENUE RESURFACING, PHASE II, Anchorage: AKR10H0MX, minor, term to 2026-01-31
- 601 W 5TH AVE REPAIR AND RENOVATION, Anchorage: AKR10GH32, minor, term to 2026-01-31
- 601 W 5TH AVE REPAIR AND RENOVATION, Anchorage: AKR10GI61, minor, term to 2026-01-31
- ADOT AIA LAKE HOOD PESTICIDE ELODEA, Anchorage: AKG870023, minor, term to 2022-03-31
- ALASKA DOT AND PUBLIC FACILITIES, Anchorage: AKR10C980
- ALASKA MARINE TRUCKING Y1 YARD, Anchorage: AKR06AF24, minor, term to 2025-03-31
- AMATS DOWNTOWN TRAIL CONNECTION, Anchorage: AKG002432, minor, term to 2030-08-31
- ANC 7L/25R DUCT DRAINAGE, Anchorage: AKR10H0NM, minor, term to 2026-01-31
What stands out
- Its term runs 4 years and 259 days, May 17, 2021 to January 31, 2026; the term ended 227 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | GLENN HIGHWAY AT MIRROR LAKE MILE POST 23-25 |
|---|---|
| Permittee | AK DOT&PF |
| NPDES ID | AKR10GL73 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 17, 2021 |
| Expires | January 31, 2026 |
| Agency | ADEC |
| Address | Chugiak, AK 99567 |
| Receiving water | Various Waterbodies |
| Subwatershed | Knik Arm-Frontal Cook Inlet (HUC 190204010808) |
NPDES AKR10GL73: effluent limits and exceedances
GLENN HIGHWAY AT MIRROR LAKE MILE POST 23-25 (NPDES AKR10GL73): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10GL73: no pollutant row on file.
NPDES AKR10GL73: inspections, violations and enforcement
NPDES AKR10GL73 (GLENN HIGHWAY AT MIRROR LAKE MILE POST 23-25): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10GL73
NPDES AKR10GL73: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10GL73
NPDES AKR10GL73: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.