AMBLER GRAVEL QUARRY, ROAD AND FUEL TANK FARM PROJECTS, Ambler, Alaska: General permit coverage AKR10GM80, held by David Cramer - Summit Consulting Services, Inc.; Construction stormwater; Administratively continued; issued December 17, 2025, term to January 31, 2026, by Alaska Department of Environmental Conservation; Other Heavy and Civil Engineering Construction.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 979 were issued before AKR10GM80.
Coverages issued nearest AKR10GM80
- 2025-12-05: DOWLING ROAD SURFACE REHABILITATION, LAKE OTIS TO ELMORE, Anchorage: AKR10H0WP, held by Todd Porter
- 2025-12-08: ANCHOR POINT RD MP 0-1.3 PAVEMENT PRESERVATION, Anchor Point: AKR10H106, held by Buck Jones
- 2025-12-10: EDGERTON PARKS ROAD AND MOUNTAIN TRAILS DRIVE UPGRADE, Palmer: AKR10H0PX, held by Chuck York
- 2025-12-10: DOWLING ROAD SURFACE REHABILITATION, LAKE OTIS TO ELMORE, Anchorage: AKR10H0XB, held by Melinda Kohlhaas
- 2025-12-16: AOGCC ORPHAN WELL PLUGGING AND REMEDIATION PROGRAM ROSETTA AND CORE HOLE SITES P, Houston: AKR10H0QD, held by Christine Resler
- 2025-12-22: LAKEVIEW APARTMENTS, Eagle River: AKR10FL26, held by Richard Young - HaliQuest LLC
- 2026-01-06: BGQ VORTAC ROAD REHAB, Big Lake: AKR10H0Z7, held by Judy Schonbeck
- 2026-01-08: MSB PALMER LANDFILL SITE IMPROVEMENTS PHASE 1, Palmer: AKR10H0R8, held by Christopher Brunner
- 2026-01-09: EAGLE BLUFF ESTATES PHASE 2, Eagle River: AKR10H108, held by Cody Hultquist
- 2026-01-10: MUKLUK RECONNECT 2 - NOME TO TELLER, Nome: AKR10H103, held by Austin Murphy
AMBLER GRAVEL QUARRY, ROAD AND FUEL TANK FARM PROJECTS among its neighbors
Its county: 54, 1 major; AKR10GM80 is minor permit.
Other permits in the county
- ALASKA AIRLINES KOTZEBUE STATION, Kotzebue: AKR06AC05, minor, term to 2025-03-31
- ANARRAAQ AND AKTIGIRUQ EXPLORATION ACCESS ROAD, Kivalina: AKR06AF84, minor, term to 2025-03-31
- ASRC SKW ESKIMOS INC WWTF, Kivalina: AKG572096, minor, term to 2022-09-30
- BI NIMIUK POINT MATERIAL SITE, Kotzebue: AKR10H15Y, minor, term to 2031-01-31
- BUCKLAND AIRPORT IMPROVEMENTS, Buckland: AKR10H161, minor, term to 2031-01-31
- BUCKLAND AIRPORT IMPROVEMENTS, Buckland: AKR10H165, minor, term to 2031-01-31
- BUCKLAND LAGOON, Buckland: AKG573028, minor, term to 2023-08-31
- COMMUNITY WIDE DRAINAGE PROJECT, Kiana: AKR10H0VF, minor, term to 2026-01-31
- DEERING AIRPORT IMPROVEMENTS, Deering: AKR10H10P, minor, term to 2031-01-31
- DEERING AIRPORT IMPROVEMENTS PROJECT NFAPT00249, Deering: AKR10H10L, minor, term to 2031-01-31
What stands out
- Its term runs 45 days, December 17, 2025 to January 31, 2026; the term ended 256 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | AMBLER GRAVEL QUARRY, ROAD AND FUEL TANK FARM PROJECTS |
|---|---|
| Permittee | David Cramer - Summit Consulting Services, Inc. |
| NPDES ID | AKR10GM80 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 17, 2025 |
| Expires | January 31, 2026 |
| Agency | Alaska Department of Environmental Conservation |
| Address | Ambler, AK 99786 |
| NAICS | 237990 – Other Heavy and Civil Engineering Construction |
| SIC | 1623 – Water, Sewer, And Utility Lines |
NPDES AKR10GM80: effluent limits and exceedances
AMBLER GRAVEL QUARRY, ROAD AND FUEL TANK FARM PROJECTS (NPDES AKR10GM80): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10GM80: no pollutant row on file.
NPDES AKR10GM80: inspections, violations and enforcement
NPDES AKR10GM80 (AMBLER GRAVEL QUARRY, ROAD AND FUEL TANK FARM PROJECTS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10GM80
NPDES AKR10GM80: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10GM80
NPDES AKR10GM80: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.