NPDES AKR10H034 · Clean Water Act
TAKOTNA HEALTH CLINIC AND HOSUING, Takotna, AK: NPDES AKR10H034 discharge permit, effluent exceedances, inspections, penalties
TAKOTNA HEALTH CLINIC AND HOSUING, Takotna, Alaska: General permit coverage AKR10H034, held by Jimmy Watson, UIC Construction; Construction stormwater; Effective; issued August 15, 2022, term to January 31, 2026, by Alaska Department of Environmental Conservation.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 256 were issued before AKR10H034.
Coverages issued nearest AKR10H034
- 2022-08-02: TANANA RIVER RECREATION ACCESS IMPROVEMENT, Fairbanks: AKR10H02C, held by Scott Smithline, FHWA Western Federal Lands Highway Division
- 2022-08-03: DONNELLY TRAINING AREA AIR TRAINING IMPROVEMENTS, Ft Greely: AKR10H02D, held by Cal Morton, Paving Products, Inc.
- 2022-08-08: MTA MRBL FIBER-TO-THE-HOME, Wasilla: AKR10H02L, held by Clifford Burris, Matanuska Telecom Association, Inc.
- 2022-08-09: U-HAUL DIMOND, Anchorage: AKR10H02R, held by Cayla Keene, Criterion General, Inc.
- 2022-08-12: 601 W 5TH AVE REPAIR AND RENOVATION, Anchorage: AKR10GI61, held by Derrick Chang - 601 Fifth Ave LLC
- 2022-08-17: 36TH AVENUE RESURFACING PHASE I, Anchorage: AKR10GN68, held by DAVID LASTER - Granite Construction Company
- 2022-08-17: CONSTRUCTING PERIMETER FENCE ROAD FROM TAYLOR ST TO N REEVE BLVD, Jber: AKR10H036, held by Christopher Lapinski, 773 CES/CEOHP
- 2022-08-17: PAVEMENT MANAGEMENT PHASE II - WHALEN AVENUE PROJECT NUMBER: 20-310-1200, Valdez: AKR10H037, held by William Harris, Harris Sand & Gravel, Inc.
- 2022-08-17: CHENA PUMP TRANSFER SITE, Fairbanks: AKR10H038, held by James Young, Great Northwest Inc.
- 2022-08-19: SUNSET DRIVE IMPROVEMENTS_3, Wasilla: AKR10GL86, held by Terry Dolan - Matanuska Susitna Borough
TAKOTNA HEALTH CLINIC AND HOSUING among its neighbors
Its county: 111, 0 major; AKR10H034 is minor permit.
Other permits in the county
- ALAN R. NEWBY SR / LITTLE BOULDER CREEK, Unknown: AKG370430, minor, term to 2010-10-07
- ARMSTRONG NOLAN CREEK MINE SITE, Bettles: AKG370D89, minor, term to 2026-02-28
- BARRY L. CLAY / SWIFT CREEK (SETTLING POND), Unknown: AKG370384, minor, term to 2010-10-07
- BARRY LAMBETH / JENNI CREEK, Unknown: AKG370574, minor, term to 2005-10-03
- BEATON PATH NUGGET CREEK MINE SITE, Circle: AKG370A31, minor, term to 2014-10-31
- BENNETT LONG CREEK DRAINAGE MINE SITE, Ruby: AKG370C88, minor, term to 2020-07-31
- BLACKWELL K-12 RENOVATION PHASE 1, Anvik: AKR10H0QZ, minor, term to 2026-01-31
- BOREAL RESOURCES INC / JIM PUP CREEK, Unknown: AKG370404, minor, term to 2014-10-31
- BRADY GOLD DUST CREEK MINE SITE, Central: AKG370C44, minor, term to 2020-07-31
- CHALKYITSIK AIRPORT IMPROVEMENTS, Chalkyitsik: AKR10H0HK, minor, term to 2026-01-31
What stands out
- Its term runs 3 years and 169 days, August 15, 2022 to January 31, 2026; the term ended 227 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | TAKOTNA HEALTH CLINIC AND HOSUING |
|---|---|
| Permittee | Jimmy Watson, UIC Construction |
| NPDES ID | AKR10H034 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 15, 2022 |
| Expires | January 31, 2026 |
| Agency | Alaska Department of Environmental Conservation |
| Address | Takotna, AK 99675 |
NPDES AKR10H034: effluent limits and exceedances
TAKOTNA HEALTH CLINIC AND HOSUING (NPDES AKR10H034): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10H034: no pollutant row on file.
NPDES AKR10H034: inspections, violations and enforcement
NPDES AKR10H034 (TAKOTNA HEALTH CLINIC AND HOSUING): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10H034
NPDES AKR10H034: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10H034
NPDES AKR10H034: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.