NPDES AKR10H03P · Clean Water Act
VIEW POINTE AT THE RANCH, Wasilla, AK: NPDES AKR10H03P discharge permit, effluent exceedances, inspections, penalties
VIEW POINTE AT THE RANCH, Wasilla, Alaska: General permit coverage AKR10H03P, held by Rex Turner; Construction stormwater; Administratively continued; issued December 1, 2025, term to January 31, 2026, by Alaska Department of Environmental Conservation; New Single-Family Housing Construction [except For-Sale Builders].
- March 24, 2025: Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)] (ST6).
- January 7, 2025: Failure to properly install, initiate, or fully implement construction stormwater controls (ST6).
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 960 were issued before AKR10H03P. Rex Turner holds 2 permits in Alaska.
Other permits held by Rex Turner
- THE RANCH PHASE I, Wasilla: AKR10H0G6, issued 2025-01-06
Coverages issued nearest AKR10H03P
- 2025-11-21: MTA FTTX OKNY WO 376-35862, Wasilla: AKR10H0XP, held by Robbie Nash
- 2025-11-21: MTA FO TRANSPORT RELO CHRD 376-36068, Wasilla: AKR10H0Z4, held by Robbie Nash
- 2025-11-22: LAWSON CREEK, Juneau: AKR10H0TN, held by David Coogan
- 2025-11-24: MAKUSHIN GEOTHERMAL PROJECT, UNALASKA, ALASKA, Unalaska: AKR10GL44, held by Bernie Karl - Ounalashka/Chena Power
- 2025-11-26: POINT MACKENZIE-TYONEK FIBER PROJECT, Tyonek: AKR10H0Q9, held by Vernon Schachle
- 2025-12-03: KENAI STEEL MAINS REPLACEMENT 2025, Kenai: AKR10H0SB, held by Vincent Robinson
- 2025-12-03: 2024 MERRILL FIELD AIRPORT IMPROVEMENTS, REHABILITATE R/W 07/25, Anchorage: AKR10H0TH, held by TODD PORTER
- 2025-12-03: CRAWFORD ST & TERRY ST DRAINAGE IMPROVEMENTS, Anchorage: AKR10H0XC, held by Shay Throop
- 2025-12-04: PETERSBURG MEDICAL CENTER, Petersburg: AKR10H0F2, held by Brian Murphy
- 2025-12-04: SEWARD MERIDIAN TRANSMISSION PIPE EXTENSION, Wasilla: AKR10H0JL, held by Skylar Furlong
VIEW POINTE AT THE RANCH among its neighbors
6 discharge permits are in the Rabbit Slough-Palmer Slough subwatershed (HUC 190204010801); AKR10H03P is one. Its county: 248, 0 major; AKR10H03P is minor permit.
Other permits in the Rabbit Slough-Palmer Slough subwatershed (HUC 190204010801)
- GLENN HWY PARKS TO S. INNER SPRINGER LOOP (PHASE II), Palmer: AKR10H0DC, minor, term to 2031-01-31
- GLENN HWY PARKS TO S. INNER SPRINGER LOOP (PHASE II), Palmer: AKR10H0DN, minor, term to 2031-01-31
- GLENN PARKS INTERCHANGE REPAIRS NOV 2018 EQ, Palmer: AKR10GO50, minor, term to 2026-01-31
- GLENN PARKS INTERCHANGE REPAIRS NOV 2018 EQ PR, Palmer: AKR10GO51, minor, term to 2026-01-31
- PALMER LATERAL VALVE REPLACEMENT, Palmer: AKR10H15F, minor, term to 2031-01-31
What stands out
- Its term runs 61 days, December 1, 2025 to January 31, 2026; the term ended 256 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a single-event violation on March 24, 2025, 569 days before EPA's file was loaded.
- No dated event in the 365 days to October 14, 2026.
- EPA's file dates 2 events for it, all in 2025.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | VIEW POINTE AT THE RANCH |
|---|---|
| Permittee | Rex Turner |
| NPDES ID | AKR10H03P |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 1, 2025 |
| Expires | January 31, 2026 |
| Agency | Alaska Department of Environmental Conservation |
| Address | Wasilla, AK 99654 |
| Subwatershed | Rabbit Slough-Palmer Slough (HUC 190204010801) |
| NAICS | 236115 – New Single-Family Housing Construction [except For-Sale Builders] |
| SIC | 1522 – Residential Construction |
NPDES AKR10H03P: effluent limits and exceedances
VIEW POINTE AT THE RANCH (NPDES AKR10H03P): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10H03P: no pollutant row on file.
NPDES AKR10H03P: inspections, violations and enforcement
NPDES AKR10H03P: 2 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| March 24, 2025 | Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)] | ST6 |
| January 7, 2025 | Failure to properly install, initiate, or fully implement construction stormwater controls | ST6 |
NPDES AKR10H03P (VIEW POINTE AT THE RANCH): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10H03P
NPDES AKR10H03P: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10H03P
NPDES AKR10H03P: 0 pollutant rows, 2 dated events; ICIS-NPDES download, loaded October 14, 2026.