NPDES AKR10H09D · Clean Water Act
SNOWSHOE WOODS PHZ III ROAD CONSTRUCTION, Talkeetna, AK: NPDES AKR10H09D discharge permit, effluent exceedances, inspections, penalties
SNOWSHOE WOODS PHZ III ROAD CONSTRUCTION, Talkeetna, Alaska: General permit coverage AKR10H09D, held by Sam McCullough; Construction stormwater; Effective; issued June 1, 2023, term to January 31, 2026, by Alaska Department of Environmental Conservation.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 391 were issued before AKR10H09D. Sam McCullough holds 2 permits in Alaska.
Other permits held by Sam McCullough
- MCCULLOUGH ESTATES PH II - YELDARB RD CONSTRUCTION, Talkeetna: AKR10H0BD, issued 2024-11-05
Coverages issued nearest AKR10H09D
- 2023-05-26: KOTZEBUE TO CAPE BLOSSOM ROAD STAGE 1, Kotzebue: AKR10GN29, held by MARCUS TRIVETTE - Brice Incorporated
- 2023-05-26: MARSHALL MATERIAL SITE, Marshall: AKR10H094, held by Marcus Trivette
- 2023-05-26: ST MARY'S MATERIAL SITE, St Mary'S: AKR10H095, held by Marcus Trivette
- 2023-05-31: LOT 52A FILL, Bethel: AKR10H09A, held by Kris Manke
- 2023-06-01: EMMONAK, Emmonak: AKR10H09C, held by Andrew Roe
- 2023-06-02: CONNECTING ANCHORAGE TRAILS IMPROVEMENTS PROJECT, Anchorage: AKR10H057, held by Shawn Casey, Bristol Prime Contractors, LLC
- 2023-06-02: WADE CREEK MP85, Chicken: AKR10H09G, held by Matthew Varner
- 2023-06-02: JALAPENOS MEXICAN RESTAURANT AND CANTINA, Eagle River: AKR10H09H, held by Mark Nystuen
- 2023-06-05: MANH CHOH TWIN ROAD AND MANH CHOH MINE ACCESS ROAD (PART A), Tok: AKR10H01U, held by Kodi Long, Qayak Construction, LLC.
- 2023-06-06: BASIL GINGER, Wasilla: AKR10H09M, held by Jordan Rousa
SNOWSHOE WOODS PHZ III ROAD CONSTRUCTION among its neighbors
6 discharge permits are in the Twister Creek-Susitna River subwatershed (HUC 190205050305); AKR10H09D is one. Its county: 248, 0 major; AKR10H09D is minor permit.
Other permits in the Twister Creek-Susitna River subwatershed (HUC 190205050305)
- JAMES P. CONWAY / POORMAN CREEK, Unknown: AKG370432, minor, term to 2010-10-07
- SCULPIN SUBDIVISION PHASE 1, Talkeetna: AKR10H0JS, minor, term to 2026-01-31
- SCULPIN SUBDIVISION, PHASE 2, REDTAIL AND SHITAKE ROADS, Talkeetna: AKR10H0UE, minor, term to 2026-01-31
- TALKEETNA SPUR TRANSPORT FIBER, Talkeetna: AKR10H04W, minor, term to 2026-01-31
- TRACT 1A WOLFGLEN ROAD CONSTRUCTION, Talkeetna: AKR10H0CE, minor, term to 2026-01-31
What stands out
- Its term runs 2 years and 244 days, June 1, 2023 to January 31, 2026; the term ended 227 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SNOWSHOE WOODS PHZ III ROAD CONSTRUCTION |
|---|---|
| Permittee | Sam McCullough |
| NPDES ID | AKR10H09D |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 1, 2023 |
| Expires | January 31, 2026 |
| Agency | Alaska Department of Environmental Conservation |
| Address | Talkeetna, AK 99676 |
| Subwatershed | Twister Creek-Susitna River (HUC 190205050305) |
NPDES AKR10H09D: effluent limits and exceedances
SNOWSHOE WOODS PHZ III ROAD CONSTRUCTION (NPDES AKR10H09D): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10H09D: no pollutant row on file.
NPDES AKR10H09D: inspections, violations and enforcement
NPDES AKR10H09D (SNOWSHOE WOODS PHZ III ROAD CONSTRUCTION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10H09D
NPDES AKR10H09D: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10H09D
NPDES AKR10H09D: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.