NPDES AKR10H0EB · Clean Water Act

TRAIL RIVER BRIDGE 25.7 AND FALLS CREEK BRIDGE 25.4 REPLACEMENT - ARRC, Near Crown Point, AK: NPDES AKR10H0EB discharge permit, effluent exceedances, inspections, penalties

TRAIL RIVER BRIDGE 25.7 AND FALLS CREEK BRIDGE 25.4 REPLACEMENT - ARRC, Near Crown Point, Alaska: General permit coverage AKR10H0EB, held by David Kabella; Construction stormwater; Effective; issued September 20, 2023, term to January 31, 2026, by Alaska Department of Environmental Conservation; Other Heavy and Civil Engineering Construction.

Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 480 were issued before AKR10H0EB. David Kabella holds 2 permits in Alaska.

Other permits held by David Kabella

Coverages issued nearest AKR10H0EB

TRAIL RIVER BRIDGE 25.7 AND FALLS CREEK BRIDGE 25.4 REPLACEMENT - ARRC among its neighbors

3 discharge permits are in the Trail Lake-Trail River subwatershed (HUC 190203021007); AKR10H0EB is one. Its county: 243, 9 major; AKR10H0EB is minor permit.

Other permits in the Trail Lake-Trail River subwatershed (HUC 190203021007)

What stands out

  • Its term runs 2 years and 133 days, September 20, 2023 to January 31, 2026; the term ended 256 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
  • No dated event in the 365 days to October 14, 2026.
  • It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityTRAIL RIVER BRIDGE 25.7 AND FALLS CREEK BRIDGE 25.4 REPLACEMENT - ARRC
PermitteeDavid Kabella
NPDES IDAKR10H0EB
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedSeptember 20, 2023
ExpiresJanuary 31, 2026
AgencyAlaska Department of Environmental Conservation
AddressNear Crown Point, AK 99631
SubwatershedTrail Lake-Trail River (HUC 190203021007)
NAICS237990 – Other Heavy and Civil Engineering Construction
SIC1542 – Nonresidential Construction

NPDES AKR10H0EB: effluent limits and exceedances

TRAIL RIVER BRIDGE 25.7 AND FALLS CREEK BRIDGE 25.4 REPLACEMENT - ARRC (NPDES AKR10H0EB): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES AKR10H0EB: no pollutant row on file.

NPDES AKR10H0EB: inspections, violations and enforcement

NPDES AKR10H0EB (TRAIL RIVER BRIDGE 25.7 AND FALLS CREEK BRIDGE 25.4 REPLACEMENT - ARRC): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES AKR10H0EB

NPDES AKR10H0EB: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES AKR10H0EB

NPDES AKR10H0EB: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.