NPDES AKR10H0QP · Clean Water Act
SEWARD CRUISE SHIP TERMINAL, Seward, AK: NPDES AKR10H0QP discharge permit, effluent exceedances, inspections, penalties
SEWARD CRUISE SHIP TERMINAL, Seward, Alaska: General permit coverage AKR10H0QP, held by Chris Nielsen; Construction stormwater; Administratively continued; issued January 20, 2025, term to January 31, 2026, by Alaska Department of Environmental Conservation.
- May 27, 2026: Notice of Violation (State).
- May 13, 2026: Failure to properly install, initiate, or fully implement construction stormwater controls (ST6).
- May 13, 2026: Other noncompliance related to construction stormwater discharges (ST6).
- May 13, 2026: Evaluation (S).
- May 2, 2026: Failure to submit required application or NOI regarding construction stormwater discharges (ST6).
- January 20, 2025: Failure to develop, maintain, or get approval of an adequate SWPPP (construction stormwater) (ST6).
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 704 were issued before AKR10H0QP. Chris Nielsen holds 3 permits in Alaska.
Other permits held by Chris Nielsen
- WHITTIER CRUISE SHIP TERMINAL, Whittier: AKR10H0P9, issued 2025-05-20
- SEWARD CRUISE SHIP TERMINAL, Seward: AKR10H0XZ, issued 2025-08-04
Coverages issued nearest AKR10H0QP
- 2024-12-03: DENALI HIGHWAY CULVERT REPLACEMENT, Cantwell: AKR10H0NV, held by Katherine Keith
- 2025-01-06: THE RANCH PHASE I, Wasilla: AKR10H0G6, held by Rex Turner
- 2025-01-06: BRYANT ARMY AIRFIELD (BAAF) WDS UPGRADES TASK 1, Anchorage: AKR10H0J8, held by Kathleen Hook
- 2025-01-10: CORNERROCK SNOW DUMP, Anchorage: AKR10H0QF, held by Jacob Mathiesen
- 2025-01-15: OLI002 OLIKTOK ROAD, Oliktok: AKR10H0QM, held by Jim Jeffords
- 2025-01-23: CONSTRUCT OPC/FRC HOMEPORT BASE PH. 2 KODIAK USCG BASE, Kodiak: AKR10H0QQ, held by Jason Davis
- 2025-01-24: FT. WAINWRIGHT (DOYON UTILITIES), Fort Wainwright: AKR10H0LA, held by Kathleen Hook
- 2025-01-28: KINCAID-JODHPUR PARK SLOPE IMPROVEMENTS, Anchorage: AKR10H0QS, held by Cheyenne Goulette
- 2025-01-29: B1171 FUEL CELL REPAIR, Eielson Afb: AKR10H0QT, held by May Nguyen
- 2025-02-04: JBER EXTEND RUNWAY 16/34, Jber: AKR10H04L, held by Darrin Hansen, Kiewit Infrastructure West Co
SEWARD CRUISE SHIP TERMINAL among its neighbors
18 discharge permits are in the Spruce Creek-Frontal Resurrection Bay subwatershed (HUC 190202020511); AKR10H0QP is one. Its county: 243, 9 major; AKR10H0QP is minor permit.
Other permits in the Spruce Creek-Frontal Resurrection Bay subwatershed (HUC 190202020511)
- AURORA ENERGY SERVICES, Seward: AK0053732, minor, term to 2021-04-01
- CHUGACHMIUT REGIONAL HEALTH CENTER, Seward: AKR10H09N, minor, term to 2026-01-31
- EXIT MARINE LLC, Seward: AKNOE0339, minor, term to 2029-06-24
- HARBOR 360 HOTEL EXPANSION, Seward: AKR10H0UC, minor, term to 2026-01-31
- JAG ALASKA SOCKEYE POINT, Seward: AKR06H01Y, minor, term to 2025-03-31
- MT. MARATHON SWPPP, Seward: AKR10H14K, minor, term to 2031-01-31
- PACIFIC SEAFOOD - SEWARD, LLC SEWARD PLANT, Seward: AKG521048, minor, term to 2027-05-31
- RESURRECTION BAY SEAFOODS, SEWARD, Seward: AKNOE0295, minor, term to 2027-04-10
- SEWARD CRUISE SHIP TERMINAL, Seward: AKR10H0XZ, minor, term to 2026-01-31
- SEWARD MARINE INDUSTRIAL CENTER, Seward: AKR06AA17, minor, term to 2025-03-31
What stands out
- Its term runs 1 year and 11 days, January 20, 2025 to January 31, 2026; the term ended 227 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is an informal enforcement action on May 27, 2026, 111 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 3 single-event violations, 1 inspection, 1 informal enforcement action.
- EPA's file dates 6 events for it, from 2025 to 2026; the busiest year is 2026 with 5.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SEWARD CRUISE SHIP TERMINAL |
|---|---|
| Permittee | Chris Nielsen |
| NPDES ID | AKR10H0QP |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 20, 2025 |
| Expires | January 31, 2026 |
| Agency | Alaska Department of Environmental Conservation |
| Address | Seward, AK 99664 |
| Subwatershed | Spruce Creek-Frontal Resurrection Bay (HUC 190202020511) |
NPDES AKR10H0QP: effluent limits and exceedances
SEWARD CRUISE SHIP TERMINAL (NPDES AKR10H0QP): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10H0QP: no pollutant row on file.
NPDES AKR10H0QP: inspections, violations and enforcement
NPDES AKR10H0QP: 4 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| May 13, 2026 | Failure to properly install, initiate, or fully implement construction stormwater controls | ST6 |
| May 13, 2026 | Other noncompliance related to construction stormwater discharges | ST6 |
| May 2, 2026 | Failure to submit required application or NOI regarding construction stormwater discharges | ST6 |
| January 20, 2025 | Failure to develop, maintain, or get approval of an adequate SWPPP (construction stormwater) | ST6 |
NPDES AKR10H0QP: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| May 13, 2026 | Evaluation | S |
NPDES AKR10H0QP: 1 informal enforcement action
| Date | What EPA recorded | Agency |
|---|---|---|
| May 27, 2026 | Notice of Violation | State |
NPDES AKR10H0QP (SEWARD CRUISE SHIP TERMINAL): no formal enforcement action on file.
Watch NPDES AKR10H0QP
NPDES AKR10H0QP: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10H0QP
NPDES AKR10H0QP: 0 pollutant rows, 6 dated events; ICIS-NPDES download, loaded September 15, 2026.