NPDES AKR10H0RG · Clean Water Act
POINT MACKENZIE ROAD RECONSTRUCTION, PHASE 1 MP 0-7, Wasilla, AK: NPDES AKR10H0RG discharge permit, effluent exceedances, inspections, penalties
POINT MACKENZIE ROAD RECONSTRUCTION, PHASE 1 MP 0-7, Wasilla, Alaska: General permit coverage AKR10H0RG, held by Tom Adams; Construction stormwater; Administratively continued; issued December 5, 2025, term to January 31, 2026, by Alaska Department of Environmental Conservation.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 971 were issued before AKR10H0RG. Tom Adams holds 8 permits in Alaska.
Other permits held by Tom Adams
- GOVERNMENT PEAK OVERFLOW PARKING LOT, Palmer: AKR10H07C, issued 2023-04-18
- SMITH ROAD EXTENSION AND PATHWAY, Palmer: AKR10H0LF, issued 2024-06-26
- MIDWAY STREET IMPROVEMENTS, Wasilla: AKR10H0WC, issued 2025-10-30
- SNOWCREST DR. AND TRAPLINE DR., Wasilla: AKR10H0YW, issued 2026-03-31
- EAST LAKEVIEW ROAD PAVEMENT PRESERVATION, North Lakes: AKR10H0ZD, issued 2026-03-26
- BIRCH CREEK AT MASTODON FISH PASSAGE IMPROVEMENTS, Talkeetna: AKR10H0ZV, issued 2026-05-22
- FERN STREET UPGRADE AND PATHWAY - PHASE 1, Wasilla: AKR10H141, issued 2026-05-22
Coverages issued nearest AKR10H0RG
- 2025-12-04: O'MALLEY AND ELMORE REINFORCEMENT, Anchorage: AKR10H0SW, held by Skylar Furlong
- 2025-12-04: KGB DISTRIBUTION INTERCONNECT, Wasilla: AKR10H0SX, held by Skylar Furlong
- 2025-12-04: KTN AIRPORT TERMINAL EXPANSION AND MODERNIZATION, Ketchikan: AKR10H0VP, held by Brian Murphy
- 2025-12-04: PTARMIGAN STREET CULVERT CROSSING, Bethel: AKR10H0XM, held by Troy Gray
- 2025-12-05: THREE BEARS COOPER LANDING, Cooper Landing: AKR10H0DX, held by Randy Hunter
- 2025-12-05: 2024 MERRILL FIELD AIRPORT IMPROVEMENTS, REHABILITATE R/W 07/25, Anchorage: AKR10H0U4, held by Earl Malpass
- 2025-12-05: DOWLING ROAD SURFACE REHABILITATION, LAKE OTIS TO ELMORE, Anchorage: AKR10H0WP, held by Todd Porter
- 2025-12-08: ANCHOR POINT RD MP 0-1.3 PAVEMENT PRESERVATION, Anchor Point: AKR10H106, held by Buck Jones
- 2025-12-10: EDGERTON PARKS ROAD AND MOUNTAIN TRAILS DRIVE UPGRADE, Palmer: AKR10H0PX, held by Chuck York
- 2025-12-10: DOWLING ROAD SURFACE REHABILITATION, LAKE OTIS TO ELMORE, Anchorage: AKR10H0XB, held by Melinda Kohlhaas
POINT MACKENZIE ROAD RECONSTRUCTION, PHASE 1 MP 0-7 among its neighbors
135 discharge permits are in the Knik Arm-Frontal Cook Inlet subwatershed (HUC 190204010808); AKR10H0RG is one. Its county: 248, 0 major; AKR10H0RG is minor permit.
Other permits in the Knik Arm-Frontal Cook Inlet subwatershed (HUC 190204010808)
- 36TH AVENUE RESURFACING PHASE I, Anchorage: AKR10GN68, minor, term to 2026-01-31
- 36TH AVENUE RESURFACING PHASE I_2, Anchorage: AKR10GO10, minor, term to 2026-01-31
- 36TH AVENUE RESURFACING, PHASE II, Anchorage: AKR10H0MX, minor, term to 2026-01-31
- 601 W 5TH AVE REPAIR AND RENOVATION, Anchorage: AKR10GH32, minor, term to 2026-01-31
- 601 W 5TH AVE REPAIR AND RENOVATION, Anchorage: AKR10GI61, minor, term to 2026-01-31
- ADOT AIA LAKE HOOD PESTICIDE ELODEA, Anchorage: AKG870023, minor, term to 2022-03-31
- ALASKA DOT AND PUBLIC FACILITIES, Anchorage: AKR10C980
- ALASKA MARINE TRUCKING Y1 YARD, Anchorage: AKR06AF24, minor, term to 2025-03-31
- AMATS DOWNTOWN TRAIL CONNECTION, Anchorage: AKG002432, minor, term to 2030-08-31
- ANC 7L/25R DUCT DRAINAGE, Anchorage: AKR10H0NM, minor, term to 2026-01-31
What stands out
- Its term runs 57 days, December 5, 2025 to January 31, 2026; the term ended 227 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | POINT MACKENZIE ROAD RECONSTRUCTION, PHASE 1 MP 0-7 |
|---|---|
| Permittee | Tom Adams |
| NPDES ID | AKR10H0RG |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 5, 2025 |
| Expires | January 31, 2026 |
| Agency | Alaska Department of Environmental Conservation |
| Address | Wasilla, AK 99654 |
| Subwatershed | Knik Arm-Frontal Cook Inlet (HUC 190204010808) |
NPDES AKR10H0RG: effluent limits and exceedances
POINT MACKENZIE ROAD RECONSTRUCTION, PHASE 1 MP 0-7 (NPDES AKR10H0RG): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10H0RG: no pollutant row on file.
NPDES AKR10H0RG: inspections, violations and enforcement
NPDES AKR10H0RG (POINT MACKENZIE ROAD RECONSTRUCTION, PHASE 1 MP 0-7): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10H0RG
NPDES AKR10H0RG: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10H0RG
NPDES AKR10H0RG: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.