LINDSAY HILL GENERATING STATION, Billingsley, Alabama: Individual permit AL0072788, held by Tenaska Alabama Partners, LP; Effective; issued November 1, 2021, term to October 31, 2026, by State.
2 of the 13 pollutants listed for NPDES AL0072788 have no violation or effluent exceedance.
- Solids, total suspended: 3 limits, 10 violations of any kind, 2 effluent exceedances, latest May 31, 2008, largest 353% over the limit.
- Chlorine, total residual: 1 limit, 7 violations of any kind, 2 effluent exceedances, latest April 30, 2026, largest 1,882% over the limit.
- Oil and grease: 0 limits, 9 violations of any kind, 1 effluent exceedance, latest March 31, 2009, largest 133% over the limit.
- Temperature, water deg. fahrenheit: 1 limit, 6 violations of any kind, 1 effluent exceedance, latest August 31, 2007, largest 1% over the limit.
- Oil & Grease: 3 limits, 1 violation of any kind, 1 effluent exceedance, latest December 31, 2016, largest 187% over the limit.
- pH: 6 limits, 20 violations of any kind.
- Flow, in conduit or thru treatment plant: 3 limits, 10 violations of any kind.
- Phosphorus, total [as P]: 1 limit, 7 violations of any kind.
- Priority Pollutants: 1 limit, 5 violations of any kind.
- Solids, total dissolved: 0 limits, 5 violations of any kind.
- Chlorination duration: 0 limits, 5 violations of any kind.
- Chromium, total [as Cr]: 2 limits.
- Zinc, total [as Zn]: 2 limits.
- March 11, 2026: Evaluation (S).
LINDSAY HILL GENERATING STATION among its neighbors
9 discharge permits are in the Upper Little Mulberry Creek subwatershed (HUC 031502010902); AL0072788 is one. Its county: 151, 2 major; AL0072788 is minor permit.
Other permits in the Upper Little Mulberry Creek subwatershed (HUC 031502010902)
- 7781 CO RD 16 CLANTON SITE, Clanton: ALR10C4FR, minor, term to 2026-03-31
- ALABAMA POWER COMPANY- CENTRAL ALABAMA GENERATING STATION, Billingsley: AL0073695, minor, term to 2021-07-31
- BUCKSHOT SPEEDWAY, Clanton: ALR10C334, minor, term to 2026-03-31
- GREEN PIT, Maplesville: ALG850307, minor, term to 2027-05-31
- HILLABEE EXPANSION PROJECT, CHILTON COUNTY (021), Billingsley: ALG670278, minor, term to 2022-09-30
- TOWN OF BILLINGSLEY WATER SYSTEM WELL #1, Billingsley: ALG640070, minor, term to 2023-06-30
- TRANSCONTINENTAL GAS PIPELINE, Billingsley: AL0021890, minor, term to 2010-09-30
- WILCO PLANT PIT, Clanton: ALG850247, minor, term to 2027-05-31
What stands out
- Its term runs 4 years and 364 days, November 1, 2021 to October 31, 2026.
- Its newest dated event on file is an inspection on March 11, 2026, 188 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- 5 of its 13 pollutants on file have an effluent exceedance (38%); 10 are under a numeric limit; the largest exceedance is Chlorine, total residual at 1,882% over its limit.
- It is one of 13,475 discharge permits on the register in Alabama; the file names no program for it, and it is a minor discharger.
Identity
| Facility | LINDSAY HILL GENERATING STATION |
|---|---|
| Permittee | Tenaska Alabama Partners, LP |
| NPDES ID | AL0072788 |
| Status | Effective |
| Type | Individual permit |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | November 1, 2021 |
| Expires | October 31, 2026 |
| Agency | State |
| Address | Billingsley, AL 36006 |
| Subwatershed | Upper Little Mulberry Creek (HUC 031502010902) |
| Other EPA IDs (FRS) | RCRA handler ALR000025072 |
NPDES AL0072788: effluent limits and exceedances
LINDSAY HILL GENERATING STATION (NPDES AL0072788): 13 pollutants on file, 10 limited; 11 with a violation of any kind, 5 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Solids, total suspended | 3 | 10 | 2 | May 31, 2008 | 353% over the limit |
| Chlorine, total residual | 1 | 7 | 2 | April 30, 2026 | 1,882% over the limit |
| Oil and grease | 0 | 9 | 1 | March 31, 2009 | 133% over the limit |
| Temperature, water deg. fahrenheit | 1 | 6 | 1 | August 31, 2007 | 1% over the limit |
| Oil & Grease | 3 | 1 | 1 | December 31, 2016 | 187% over the limit |
| pH | 6 | 20 | 0 | ||
| Flow, in conduit or thru treatment plant | 3 | 10 | 0 | ||
| Phosphorus, total [as P] | 1 | 7 | 0 | ||
| Priority Pollutants | 1 | 5 | 0 | ||
| Solids, total dissolved | 0 | 5 | 0 | ||
| Chlorination duration | 0 | 5 | 0 | ||
| Chromium, total [as Cr] | 2 | 0 | 0 | ||
| Zinc, total [as Zn] | 2 | 0 | 0 |
NPDES AL0072788: inspections, violations and enforcement
NPDES AL0072788: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| March 11, 2026 | Evaluation | S |
NPDES AL0072788 (LINDSAY HILL GENERATING STATION): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES AL0072788
NPDES AL0072788: one email when its EPA record changes — $99/month.
Permits near NPDES AL0072788
NPDES AL0072788: 13 pollutant rows, 1 dated events; ICIS-NPDES download, loaded September 15, 2026.