NPDES AL0074179 · Clean Water Act
E.B. HARRIS COMBINED CYCLE PLANT, Prattville, AL: NPDES AL0074179 discharge permit, effluent exceedances, inspections, penalties
E.B. HARRIS COMBINED CYCLE PLANT, Prattville, Alabama: Individual permit AL0074179, held by Southern Power Company; Administratively continued; issued July 30, 2018, term to July 31, 2023; Fossil Fuel Electric Power Generation.
4 of the 14 pollutants listed for NPDES AL0074179 have no violation or effluent exceedance.
- pH: 8 limits, 49 violations of any kind, 1 effluent exceedance, latest June 30, 2016.
- Solids, total suspended: 8 limits, 55 violations of any kind.
- Flow, in conduit or thru treatment plant: 6 limits, 50 violations of any kind.
- Oil and grease: 0 limits, 47 violations of any kind.
- Copper, total [as Cu]: 4 limits, 22 violations of any kind.
- Chlorination duration: 2 limits, 13 violations of any kind.
- Temperature, water deg. fahrenheit: 2 limits, 11 violations of any kind.
- Chlorine, total residual: 0 limits, 11 violations of any kind.
- Iron, total [as Fe]: 4 limits, 8 violations of any kind.
- Chlorine, free available: 2 limits, 8 violations of any kind.
- Oil & Grease: 8 limits.
- Chromium, total [as Cr]: 2 limits.
- Zinc, total [as Zn]: 2 limits.
- Priority Pollutants: 1 limit.
- March 13, 2026: Evaluation (S).
Other permits held by Southern Power Company
- H. ALLEN FRANKLIN COMBINED-CYCLE PLANT, Smiths: AL0073555, issued 2017-09-29
E.B. HARRIS COMBINED CYCLE PLANT among its neighbors
3 discharge permits are in the Haney Branch-Bear Creek subwatershed (HUC 031502010504); AL0074179 is one. Its county: 151, 2 major; AL0074179 is minor permit.
Other permits in the Haney Branch-Bear Creek subwatershed (HUC 031502010504)
- AUTAUGAVILLE-EAST PELHAM (SOUTH), Prattville: ALR10C5T3, minor, term to 2026-03-31
- GOLSON RD SLIDE REPAIR, Prattville: ALR10AT69, minor, term to 2016-03-31
What stands out
- Its term runs 5 years and 1 day, July 30, 2018 to July 31, 2023; the term ended 1,171 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is an inspection on March 13, 2026, 215 days before EPA's file was loaded.
- In the 365 days to October 14, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- 1 of its 14 pollutants on file has an effluent exceedance (7.1%); 12 are under a numeric limit.
- It is one of 13,475 discharge permits on the register in Alabama; the file names no program for it, and it is a minor discharger.
Identity
| Facility | E.B. HARRIS COMBINED CYCLE PLANT |
|---|---|
| Permittee | Southern Power Company |
| NPDES ID | AL0074179 |
| Status | Administratively continued |
| Type | Individual permit |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | July 30, 2018 |
| Expires | July 31, 2023 |
| Address | Prattville, AL 36067 |
| Subwatershed | Haney Branch-Bear Creek (HUC 031502010504) |
| NAICS | 221112 – Fossil Fuel Electric Power Generation |
| SIC | 4911 – Electric Services |
| Other EPA IDs (FRS) | RCRA handler ALR000043778; ICIS-AIR source AL0000000100100010 |
NPDES AL0074179: effluent limits and exceedances
E.B. HARRIS COMBINED CYCLE PLANT (NPDES AL0074179): 14 pollutants on file, 12 limited; 10 with a violation of any kind, 1 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| pH | 8 | 49 | 1 | June 30, 2016 | |
| Solids, total suspended | 8 | 55 | 0 | ||
| Flow, in conduit or thru treatment plant | 6 | 50 | 0 | ||
| Oil and grease | 0 | 47 | 0 | ||
| Copper, total [as Cu] | 4 | 22 | 0 | ||
| Chlorination duration | 2 | 13 | 0 | ||
| Temperature, water deg. fahrenheit | 2 | 11 | 0 | ||
| Chlorine, total residual | 0 | 11 | 0 | ||
| Iron, total [as Fe] | 4 | 8 | 0 | ||
| Chlorine, free available | 2 | 8 | 0 | ||
| Oil & Grease | 8 | 0 | 0 | ||
| Chromium, total [as Cr] | 2 | 0 | 0 | ||
| Zinc, total [as Zn] | 2 | 0 | 0 | ||
| Priority Pollutants | 1 | 0 | 0 |
NPDES AL0074179: inspections, violations and enforcement
NPDES AL0074179: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| March 13, 2026 | Evaluation | S |
NPDES AL0074179 (E.B. HARRIS COMBINED CYCLE PLANT): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES AL0074179
NPDES AL0074179: one email when its EPA record changes — $99/month.
Permits near NPDES AL0074179
NPDES AL0074179: 14 pollutant rows, 1 dated events; ICIS-NPDES download, loaded October 14, 2026.