NPDES ALR10AW00 · Clean Water Act
PELICAN LANDING, Mobile, AL: NPDES ALR10AW00 discharge permit, effluent exceedances, inspections, penalties
PELICAN LANDING, Mobile, Alabama: General permit coverage ALR10AW00, held by Reed Construction Company; Construction stormwater; Administratively continued; issued March 17, 2015, term to March 31, 2016.
Alabama holds 7,857 Construction stormwater coverages of this permit type in EPA’s file; 738 were issued before ALR10AW00. Reed Construction Company holds 3 permits in Alabama.
Other permits held by Reed Construction Company
- CYPRESS TRACE, Bay Minette: ALR10AU96, issued 2015-02-12
- WOLF BAY VILLAGE, Orange Beach: ALR10AW56, issued 2015-05-11
Coverages issued nearest ALR10AW00
- 2015-03-11: STPAA-STPBH-7376(600) PS1581, Birmingham: ALR10AU20, held by Alabama Department of Transportation
- 2015-03-12: DR HORTON AT CRIMSON RIDGE, Gulf Shores: ALR10AV32, held by DR Horton, Inc
- 2015-03-13: HIGHWAY 11 APARTMENT SITE, Coaling: ALR10AV86, held by Alan Whitsett
- 2015-03-13: POLARIS MASS GRADING, Huntsville: ALR10AV88, held by T.W. Frierson Contractor Inc
- 2015-03-16: DR HORTON AT HARVEST MEADOWS, Loxley: ALR10AV73, held by DR Horton, Inc
- 2015-03-19: ACA G600 EVONIK CORPORATION, MOBILE PLANT, Theodore: ALR10AW04, held by Evonik Corporation
- 2015-03-20: WYNBROOK- CONNECTOR ROAD AND SERVICE ROAD, Montgomery: ALR10AW10, held by Montgomery East Inc.
- 2015-03-23: MAGNOLIA GROVE PHASE I, Hoover: ALR10AT83, held by SB Development Corporation
- 2015-03-24: HARTSFIELD STATION, Mobile: ALR10AV38, held by The Mitchell Company, LLC
- 2015-03-24: MEADOWS AT POINT CLEAR, Fairhope: ALR10AV46, held by Geoff Lane Construction, Inc
PELICAN LANDING among its neighbors
93 discharge permits are in the Miller Creek subwatershed (HUC 031700080602); ALR10AW00 is one.
Other permits in the Miller Creek subwatershed (HUC 031700080602)
- 9000 COTTAGE HILL RD, Mobile: ALR10C6UF, minor, term to 2026-03-31
- AIR TERMINAL DRIVE SUBDIVISION, Mobile: ALR10C54X, minor, term to 2026-03-31
- AIRPORT/SNOW RETAIL CENTER, Mobile: ALR10C49U, minor, term to 2026-03-31
- ALDEN PARK BY ADAMS HOMES, Mobile: ALR10C63B, minor, term to 2026-03-31
- AMELIA LAKES, Mobile: ALR10AT36, minor, term to 2016-03-31
- BAIRD-COXWELL ROAD PIT, Grand Bay: ALG890223, minor, term to 2023-01-31
- BELLEWOOD PLACE, Mobile: ALR10BEZY, minor, term to 2021-03-31
- BRIARGROVE BY DMIH, LLC, Mobile: ALR109565, minor, term to 2021-03-31
- CHAPEL CREEK, Mobile: ALR10BDYJ, minor, term to 2021-03-31
- CHAPEL CREEK BY DR HORTON INC., Mobile: ALR10BFW8, minor, term to 2026-03-31
What stands out
- Its term runs 1 year and 14 days, March 17, 2015 to March 31, 2016; the term ended 3,820 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 13,475 discharge permits on the register in Alabama; 7,857 of them (58%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PELICAN LANDING |
|---|---|
| Permittee | Reed Construction Company |
| NPDES ID | ALR10AW00 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 17, 2015 |
| Expires | March 31, 2016 |
| Address | Mobile, AL 36608 |
| Subwatershed | Miller Creek (HUC 031700080602) |
NPDES ALR10AW00: effluent limits and exceedances
PELICAN LANDING (NPDES ALR10AW00): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES ALR10AW00: no pollutant row on file.
NPDES ALR10AW00: inspections, violations and enforcement
NPDES ALR10AW00 (PELICAN LANDING): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES ALR10AW00
NPDES ALR10AW00: one email when its EPA record changes — $99/month.
Permits near NPDES ALR10AW00
NPDES ALR10AW00: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.