NEWVILLE JCT.- NEWVILLE 115KV LINE, Bertha, AL: NPDES ALR10B392 discharge permit, effluent exceedances, inspections, penalties
NEWVILLE JCT.- NEWVILLE 115KV LINE, Bertha, Alabama: General permit coverage ALR10B392, held by PowerSouth Energy Cooperative; Construction stormwater; Administratively continued; issued September 18, 2015, term to March 31, 2016.
Alabama holds 7,857 Construction stormwater coverages of this permit type in EPA’s file; 997 were issued before ALR10B392. PowerSouth Energy Cooperative holds 18 permits in Alabama.
Other permits held by PowerSouth Energy Cooperative
- LOWMAN ENERGY CENTER, Leroy: AL0003671, issued 2022-02-28
- PRESTWICK BORROW PIT, Leroy: ALG850279, issued 2025-01-16
- BROOKLYN ROAD SUBSTATION PROJECT, Evergreen: ALR10AR21, issued 2014-09-19
- MCWILLIAMS - DOZIER 115KV LINE, Gantt: ALR10AY99, issued 2015-06-22
- DOZIER SUBSTATION, Dozier: ALR10B034, issued 2015-07-09
- CASTLEBERRY-BREWTON 115 KV LINE, Castleberry: ALR10B109, issued 2015-07-28
- NEWVILLE 115-12.5KV SUBSTATION, Newville: ALR10B194, issued 2015-07-31
- MCWILLIAMS - WIGGINS JCT 115KV LINE, Andalusia: ALR10B441, issued 2015-10-27
- DOZIER - BRANTLEY 115KV LINE, Dozier: ALR10B614, issued 2015-12-09
- BRANTLEY 115-12.5KV SUBSTATION, Brantley: ALR10B615, issued 2015-12-08
Coverages issued nearest ALR10B392
- 2015-09-15: THE HIGHLANDS AT POINT CLEAR, Point Clear: ALR10B300, held by The Highlands at Point Clear, LLC
- 2015-09-16: STOCKTON PLACE PHASE 8 (THE KNOLL), Trussville: ALR10B181, held by SB Development
- 2015-09-16: MOUNTAIN LAUREL PLAT NO. 3 AT RIVER OAKS SD LOT 18, Jacksons Gap: ALR10B307, held by James F. Littman
- 2015-09-18: TUSKEGEE NEW RETAIL STORE, Tuskegee: ALR10B301, held by The Broadway Group, LLC
- 2015-09-18: BR-0021(548) PS1629, Munford: ALR10B317, held by Alabama Department of Transportation
- 2015-09-21: UA RETAIL CENTER AT BRYANT DRIVE, Tuscaloosa: ALR10B319, held by Harrison Construction Company, Inc
- 2015-09-21: COTTONWOOD VILLAGE, Muscle Shoals: ALR10B320, held by Walker-Waddell Investments, Inc.
- 2015-09-21: CHALKVILLE ELEMENTARY SCHOOL, Birmingham: ALR10B321, held by Carmon Construction, Inc
- 2015-09-22: CHICK-FIL-A - #3593, Birmingham: ALR10AZ89, held by Chick-fil-A
- 2015-09-22: GARRISON STEEL FABRICATORS, INC., Pell City: ALR10B166, held by Garrison Steel Fabricators, Inc.
NEWVILLE JCT.- NEWVILLE 115KV LINE among its neighbors
1 discharge permits are in the Riley Creek subwatershed (HUC 031402010204); ALR10B392 is one.
What stands out
- Its term runs 195 days, September 18, 2015 to March 31, 2016; the term ended 3,820 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 13,475 discharge permits on the register in Alabama; 7,857 of them (58%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NEWVILLE JCT.- NEWVILLE 115KV LINE |
|---|---|
| Permittee | PowerSouth Energy Cooperative |
| NPDES ID | ALR10B392 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 18, 2015 |
| Expires | March 31, 2016 |
| Address | Bertha, AL 36353 |
| Subwatershed | Riley Creek (HUC 031402010204) |
NPDES ALR10B392: effluent limits and exceedances
NEWVILLE JCT.- NEWVILLE 115KV LINE (NPDES ALR10B392): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES ALR10B392: no pollutant row on file.
NPDES ALR10B392: inspections, violations and enforcement
NPDES ALR10B392 (NEWVILLE JCT.- NEWVILLE 115KV LINE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES ALR10B392
NPDES ALR10B392: one email when its EPA record changes — $99/month.
Permits near NPDES ALR10B392
NPDES ALR10B392: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.