NPDES ALR10B729 · Clean Water Act
GORGAS - FULTON SPRINGS 115KV TL, Parrish, AL: NPDES ALR10B729 discharge permit, effluent exceedances, inspections, penalties
GORGAS - FULTON SPRINGS 115KV TL, Parrish, Alabama: General permit coverage ALR10B729, held by Alabama Power Company; Construction stormwater; Administratively continued; issued January 28, 2016, term to March 31, 2016; Power and Communication Line and Related Structures Construction.
Alabama holds 7,857 Construction stormwater coverages of this permit type in EPA’s file; 1,234 were issued before ALR10B729. Alabama Power Company holds 149 permits in Alabama.
Other permits held by Alabama Power Company
- BARRY STEAM ELECTRIC PLANT, Bucks: AL0002879, issued 2020-12-09
- GADSDEN STEAM PLANT, Gadsden: AL0002887, issued 2017-01-03
- GORGAS STEAM PLANT, Parrish: AL0002909, issued 2022-06-28
- GREENE COUNTY STEAM ELECTRIC PLANT, Forkland: AL0002917, issued 2019-03-29
- E.C. GASTON STEAM ELECTRIC PLANT, Wilsonville: AL0003140, issued 2020-04-01
- WASHINGTON COUNTY COGENERATION PLANT, Mcintosh: AL0071951, issued 2021-09-17
- THEODORE COGENERATION FACILITY, Theodore: AL0072290, issued 2014-12-23
- ALABAMA POWER COMPANY- CENTRAL ALABAMA GENERATING STATION, Billingsley: AL0073695, issued 2016-07-29
- ALABAMA POWER COMPANY - PATTON CHAPEL CREW HQ, Birmingham: ALG140132, issued 2023-03-02
- CENTRAL UTILITIES PLANT, Birmingham: ALG250054, issued 2017-02-16
Coverages issued nearest ALR10B729
- 2016-01-26: SALVATION ARMY CENTER OF HOPE, Birmingham: ALR10B555, held by Brasfield & Gorrie, LLC
- 2016-01-26: HSC SARALAND, Saraland: ALR10B708, held by HSC Saraland, LLC
- 2016-01-28: JORDAN-HARE STADIUM STORM CULVERT & SANITARY SEWER, Auburn: ALR10B715, held by Russo Corporation
- 2016-01-28: NHF-MR15(900) PS1653, Tuscaloosa: ALR10B717, held by Alabama Department of Transportation
- 2016-01-28: TRAFFORD-ONEONTA-ALTOONA 44KV TL, Highland Lake: ALR10B724, held by Alabama Power Company
- 2016-01-28: PINE RIDGE DS, Birmingham: ALR10B731, held by Alabama Power Company
- 2016-01-29: RETAIL DEVELOPMENT, ALEXANDER CITY, Alexander City: ALR10B684, held by The Broadway Group, LLC
- 2016-01-29: NEW STUDENT CENTER - ST. FRANCIS OF ASSISI UNIVERSITY PARISH, Tuscaloosa: ALR10B716, held by JohnsonKreis Construction
- 2016-01-29: PUMP STATION 30 FORCE MAIN SLIP LINE REPAIR, Montgomery: ALR10B718, held by Faulk Constructors, Inc.
- 2016-01-29: ROCK CREEK/LITTLE CHOCTAWHATCHEE TRUNK LINE, Dothan: ALR10B719, held by John D. Stephens, Inc
GORGAS - FULTON SPRINGS 115KV TL among its neighbors
12 discharge permits are in the Baker Creek-Mulberry Fork subwatershed (HUC 031601090604); ALR10B729 is one.
Other permits in the Baker Creek-Mulberry Fork subwatershed (HUC 031601090604)
- BR-0269(501) PS1634, Parrish: ALR10AZ71, minor, term to 2016-03-31
- GOODSPRINGS CONNECTION, Goodsprings: ALR10BHI0, minor, term to 2021-03-31
- GORGAS 8-10 DEMOLITION, Parrish: ALR10BHAH, minor, term to 2026-03-31
- GORGAS ASH POND CLOSURE, Praco: ALR10BDH3, minor, term to 2026-03-31
- GORGAS BESS, Parrish: ALR10C6P5, minor, term to 2026-03-31
- GORGAS C&D LANDFILL CLOSURE, Parrish: ALR10BHOU, minor, term to 2021-03-31
- GORGAS STEAM PLANT, Parrish: AL0002909, major, term to 2027-06-30
- JAP CREEK MINE, Cordova: AL0072613, minor, term to 2016-08-31
- LOST CREEK COALBED METHANE PROJECT, Birmingham: AL0077763, minor, term to 2011-03-31
- MULBERRY HOLLOW, Cordova: ALR10C7PP, minor, term to 2026-03-31
What stands out
- Its term runs 63 days, January 28, 2016 to March 31, 2016; the term ended 3,849 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 13,475 discharge permits on the register in Alabama; 7,857 of them (58%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | GORGAS - FULTON SPRINGS 115KV TL |
|---|---|
| Permittee | Alabama Power Company |
| NPDES ID | ALR10B729 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 28, 2016 |
| Expires | March 31, 2016 |
| Address | Parrish, AL 35580 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Baker Creek-Mulberry Fork (HUC 031601090604) |
| NAICS | 237130 – Power and Communication Line and Related Structures Construction |
| SIC | 1623 – Water, Sewer, And Utility Lines |
NPDES ALR10B729: effluent limits and exceedances
GORGAS - FULTON SPRINGS 115KV TL (NPDES ALR10B729): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES ALR10B729: no pollutant row on file.
NPDES ALR10B729: inspections, violations and enforcement
NPDES ALR10B729 (GORGAS - FULTON SPRINGS 115KV TL): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES ALR10B729
NPDES ALR10B729: one email when its EPA record changes — $99/month.
Permits near NPDES ALR10B729
NPDES ALR10B729: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.