NPDES ALR10B780 · Clean Water Act
BARRY WATER TREATMENT PLANT, Bucks, AL: NPDES ALR10B780 discharge permit, effluent exceedances, inspections, penalties
BARRY WATER TREATMENT PLANT, Bucks, Alabama: General permit coverage ALR10B780, held by Alabama Power Company; Construction stormwater; Administratively continued; issued February 12, 2016, term to March 31, 2016.
Alabama holds 7,857 Construction stormwater coverages of this permit type in EPA’s file; 1,261 were issued before ALR10B780. Alabama Power Company holds 149 permits in Alabama.
Other permits held by Alabama Power Company
- BARRY STEAM ELECTRIC PLANT, Bucks: AL0002879, issued 2020-12-09
- GADSDEN STEAM PLANT, Gadsden: AL0002887, issued 2017-01-03
- GORGAS STEAM PLANT, Parrish: AL0002909, issued 2022-06-28
- GREENE COUNTY STEAM ELECTRIC PLANT, Forkland: AL0002917, issued 2019-03-29
- E.C. GASTON STEAM ELECTRIC PLANT, Wilsonville: AL0003140, issued 2020-04-01
- WASHINGTON COUNTY COGENERATION PLANT, Mcintosh: AL0071951, issued 2021-09-17
- THEODORE COGENERATION FACILITY, Theodore: AL0072290, issued 2014-12-23
- ALABAMA POWER COMPANY- CENTRAL ALABAMA GENERATING STATION, Billingsley: AL0073695, issued 2016-07-29
- ALABAMA POWER COMPANY - PATTON CHAPEL CREW HQ, Birmingham: ALG140132, issued 2023-03-02
- CENTRAL UTILITIES PLANT, Birmingham: ALG250054, issued 2017-02-16
Coverages issued nearest ALR10B780
- 2016-02-10: MOULTON SAFE ROOM SHELTER, Moulton: ALR10B714, held by Boyett Construction
- 2016-02-10: CAMELLIA PLACE ADDITION, Auburn: ALR10B754, held by Dominion Partners, LLC
- 2016-02-11: ACIMF-I059(383) PS1637, Birmingham: ALR10B692, held by Alabama Department of Transportation
- 2016-02-11: 30TH AVENUE E COTTAGE COURTS I, Tuscaloosa: ALR10B751, held by Bond Construction
- 2016-02-12: STPAA-HSIP -0046(506)PS1669, Heflin: ALR10B757, held by Alabama Departmernt of Transportation
- 2016-02-15: AL ARNG DRTS DECATUR, Decatur: ALR10B755, held by Darrin Wells DBA Earth Services
- 2016-02-15: PIKE ROAD MAIN EXTENSION, Pike Road: ALR10B767, held by Alabama Gas Corporation (Alagasco)
- 2016-02-16: HIGHWAY 160 WATER TRANSMISSION MAIN PHASE 2-B, Hayden: ALR10B747, held by Blount County Water Authority
- 2016-02-16: BUILDING 4473 EXPANSION, Huntsville: ALR10B760, held by A West Enterprise
- 2016-02-18: ANNISTON ARMY DEPOT-NEW WASTE AND DOMESTIC WATER LINES, Eastaboga: ALR10B761, held by BIC/SCC JV
BARRY WATER TREATMENT PLANT among its neighbors
18 discharge permits are in the Big Chippewa Lake subwatershed (HUC 031602040106); ALR10B780 is one.
Other permits in the Big Chippewa Lake subwatershed (HUC 031602040106)
- BARRY - LUCEDALE, Bucks: ALR10C04D, minor, term to 2021-03-31
- BARRY COMBINED PROJECT, Bucks: ALR10C05N, minor, term to 2026-03-31
- BARRY DIKE HEIGHTENING PROJECT, Bucks: ALR10C05V, minor, term to 2026-03-31
- BARRY RAILROAD EXPANSION, Bucks: ALR10C5CG, minor, term to 2026-03-31
- BARRY STEAM ELECTRIC PLANT, Bucks: AL0002879, major, term to 2025-11-30
- BMP CHASTANG CONSTRUCTION SITE, Mount Vernon: ALR10C5L4, minor, term to 2026-03-31
- BMP CHASTANG RNG BORROW PIT, Mount Vernon: ALR10C5M0, minor, term to 2026-03-31
- BUCKS PLANT, Bucks: ALG110056, minor, term to 2012-08-31
- CHASTANG SANITARY LANDFILL, Chastang: ALG160149, minor, term to 2022-01-31
- ELLICOTT SS EXPANSION, Bucks: ALR10BFZA, minor, term to 2021-03-31
What stands out
- Its term runs 48 days, February 12, 2016 to March 31, 2016; the term ended 3,820 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 13,475 discharge permits on the register in Alabama; 7,857 of them (58%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BARRY WATER TREATMENT PLANT |
|---|---|
| Permittee | Alabama Power Company |
| NPDES ID | ALR10B780 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 12, 2016 |
| Expires | March 31, 2016 |
| Address | Bucks, AL 36512 |
| Subwatershed | Big Chippewa Lake (HUC 031602040106) |
NPDES ALR10B780: effluent limits and exceedances
BARRY WATER TREATMENT PLANT (NPDES ALR10B780): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES ALR10B780: no pollutant row on file.
NPDES ALR10B780: inspections, violations and enforcement
NPDES ALR10B780 (BARRY WATER TREATMENT PLANT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES ALR10B780
NPDES ALR10B780: one email when its EPA record changes — $99/month.
Permits near NPDES ALR10B780
NPDES ALR10B780: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.