NPDES ALR10C52C · Clean Water Act
BEAR RUN PHASE 2A, Saraland, AL: NPDES ALR10C52C discharge permit, effluent exceedances, inspections, penalties
BEAR RUN PHASE 2A, Saraland, Alabama: General permit coverage ALR10C52C, held by LOG Construction, LLC; Construction stormwater; Administratively continued; issued March 19, 2024, term to March 31, 2026, by State.
- July 23, 2026: Evaluation (S).
Alabama holds 7,857 Construction stormwater coverages of this permit type in EPA’s file; 4,778 were issued before ALR10C52C. LOG Construction, LLC holds 4 permits in Alabama.
Other permits held by LOG Construction, LLC
- BEAR RUN PHASE 2B BY LOG CONSTRUCTION, LLC, Saraland: ALR10C7XY, issued 2026-04-22
- COLONIAL TRADITIONS PHASE 3A, Gulf Shores: ALR10C8AN, issued 2026-07-14
- BLACKWATER RIDGE PHASE 3, Robertsdale: ALR10C8BP, issued 2026-07-22
Coverages issued nearest ALR10C52C
- 2024-03-18: AUTOZONE #5169, Atmore: ALR10C521, held by AutoZone Development, LLC
- 2024-03-18: AUTOZONE #1878, Fort Mitchell: ALR10C523, held by AutoZone Development, LLC
- 2024-03-18: APDF-1602(542) PS 2122, Pinson: ALR10C526, held by ALDOT
- 2024-03-19: THISTLE LANE STORAGE, Auburn: ALR10C529, held by Thistle Lane Storage, LLC
- 2024-03-19: THE EDGES AT BLUE CREEK, Dadeville: ALR10C52B, held by Wayne Gentry Builders, Inc.
- 2024-03-20: MEAHER STATE PARK IMPROVEMENTS, Spanish Fort: ALR10C52K, held by White-Spunner Construction, LLC
- 2024-03-20: NH-HSIP-0021(576) PS 2217, Weaver: ALR10C52L, held by ALDOT
- 2024-03-20: DICKSON FARMS SUBDIVISION PHASE 2, Opelika: ALR10C52M, held by TPG Homes, LLC
- 2024-03-21: RIVER BIRCH TRAIL - PHASE 3, Dadville: ALR10C52N, held by McIntyre Home Builders, LLC.
- 2024-03-21: HAMILTON TRACK FACILITY, Hamilton: ALR10C52P, held by Avery Landscaping and Assoc, LLC
BEAR RUN PHASE 2A among its neighbors
49 discharge permits are in the Bayou Sara subwatershed (HUC 031602040402); ALR10C52C is one. Its county: 1,120, 18 major; ALR10C52C is minor permit.
Other permits in the Bayou Sara subwatershed (HUC 031602040402)
- 527 SARALAND DEVELOPMENT, Saraland: ALR10C3CK, minor, term to 2026-03-31
- 637 BAKER RD, Satsuma: ALR10C2PC, minor, term to 2026-03-31
- AARON OIL COMPANY LLC, Saraland: ALNE00255, minor, term to 2029-03-03
- AGAPE MINISTRIES, Saraland: ALR109229, minor, term to 2016-03-31
- ALLEN - ROLLING HILLS ESTATES, Saraland: ALR10C7DW, minor, term to 2026-03-31
- BEAR RUN NORTH, Saraland: ALR10C74B, minor, term to 2026-03-31
- BEAR RUN PHASE 2B BY LOG CONSTRUCTION, LLC, Saraland: ALR10C7XY, minor, term to 2031-03-31
- BEAR RUN SUBDIVISION, Saraland: ALR10C71K, minor, term to 2026-03-31
- BOUTWELL - ELYSIAN FIELDS PHASE 3, Saraland: ALR10C5UP, minor, term to 2026-03-31
- CHERRY HILL & SPANISH TRACE SUBDIVISION, Saraland: ALR10C05J, minor, term to 2021-03-31
What stands out
- Its term runs 2 years and 12 days, March 19, 2024 to March 31, 2026; the term ended 168 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is an inspection on July 23, 2026, 54 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 13,475 discharge permits on the register in Alabama; 7,857 of them (58%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BEAR RUN PHASE 2A |
|---|---|
| Permittee | LOG Construction, LLC |
| NPDES ID | ALR10C52C |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 19, 2024 |
| Expires | March 31, 2026 |
| Agency | State |
| Address | Saraland, AL 36571 |
| Subwatershed | Bayou Sara (HUC 031602040402) |
NPDES ALR10C52C: effluent limits and exceedances
BEAR RUN PHASE 2A (NPDES ALR10C52C): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES ALR10C52C: no pollutant row on file.
NPDES ALR10C52C: inspections, violations and enforcement
NPDES ALR10C52C: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| July 23, 2026 | Evaluation | S |
NPDES ALR10C52C (BEAR RUN PHASE 2A): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES ALR10C52C
NPDES ALR10C52C: one email when its EPA record changes — $99/month.
Permits near NPDES ALR10C52C
NPDES ALR10C52C: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded September 15, 2026.