NPDES ALR10C61N · Clean Water Act
HAVEN AT GAINESWOOD, Fairhope, AL: NPDES ALR10C61N discharge permit, effluent exceedances, inspections, penalties
HAVEN AT GAINESWOOD, Fairhope, Alabama: General permit coverage ALR10C61N, held by Cunningham DeLaney Construction, LLC; Construction stormwater; Administratively continued; issued November 26, 2024, term to March 31, 2026, by State.
- August 12, 2026: Evaluation (S).
Alabama holds 7,857 Construction stormwater coverages of this permit type in EPA’s file; 5,395 were issued before ALR10C61N. Cunningham DeLaney Construction, LLC holds 3 permits in Alabama.
Other permits held by Cunningham DeLaney Construction, LLC
- DIAMANTE, Daphne: ALR10BEXB, issued 2019-05-21
- FOLEY POINTE PHASE 2, Foley: ALR10C8E2, issued 2026-08-10
Coverages issued nearest ALR10C61N
- 2024-11-26: BBJL-LLC-FOSTERS, Fosters: ALR10C61D, held by BBJL Development, LLC
- 2024-11-26: TAYLOR CONSTRUCTION EQUIPMENT, Saraland: ALR10C61G, held by Mike Rozier Construction Co., Inc.
- 2024-11-26: BALDWIN EXPRESS PIPELINE - NATURAL GAS PIPELINE TO NOVELIS, Stockton: ALR10C61H, held by Boan Contracting Co., Inc.
- 2024-11-26: YARBROUGH FARMS SECTION J, Auburn: ALR10C61K, held by MD Real Estate Holdings, LLC
- 2024-11-26: PINE LEVEL BALL FIELDS, Prattville: ALR10C61M, held by David Bulger, Inc.
- 2024-11-26: WALKER SPRINGS I SOLAR, Gainestown: ALR10C61P, held by Wanzek Construction, Inc.
- 2024-11-26: PARKWAY GARDENS, Tuscaloosa: ALR10C61Q, held by D.R. Horton, Inc. - Brimingham
- 2024-11-27: NORTONS LANE ESFELLER, Mobile: ALR10C61R, held by Esfeller Construction Co., Inc
- 2024-11-27: TORQUE MOTOR SUITES, Birmingham: ALR10C61T, held by Torque Grand River, LLC
- 2024-11-27: BR-0023(501) PS 97, Springville: ALR10C61U, held by ALDOT
HAVEN AT GAINESWOOD among its neighbors
90 discharge permits are in the Lower Fish River subwatershed (HUC 031602050204); ALR10C61N is one. Its county: 1,240, 6 major; ALR10C61N is minor permit.
Other permits in the Lower Fish River subwatershed (HUC 031602050204)
- 397.055 CHICK-FIL-A FAIRHOPE FSR #05944, Fairhope: ALR10C6P6, minor, term to 2026-03-31
- 5-DANNE-1 DIRT PIT, Fairhope: AL0067385, minor, term to 2022-11-30
- ADVANCED DENTAL COMFORT, Fairhope: ALR10AY70, minor, term to 2016-03-31
- ALDI FAIRHOPE, Fairhope: ALR10C1N0, minor, term to 2026-03-31
- AMERICAN CONCRETE SUPPLY INC. - FAIRHOPE, Fairhope: ALG110227, minor, term to 2022-08-31
- AMERICAN SELF STORAGE V - PHASE 5-7, Fairhope: ALR10C53E, minor, term to 2026-03-31
- ANNIE COOPER DIRT PIT, Summerdale: AL0072508, minor, term to 2009-12-31
- BAYWOOD OF POINT CLEAR, Fairhope: ALR10C7S9, minor, term to 2026-03-31
- BELLA FORESTA RV SITE, Fairhope: ALR10C3H5, minor, term to 2026-03-31
- BRIGHTS CREEK DIRT PIT 1, Summerdale: ALG891021, minor, term to 2028-01-31
What stands out
- Its term runs 1 year and 125 days, November 26, 2024 to March 31, 2026; the term ended 168 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is an inspection on August 12, 2026, 34 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 13,475 discharge permits on the register in Alabama; 7,857 of them (58%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HAVEN AT GAINESWOOD |
|---|---|
| Permittee | Cunningham DeLaney Construction, LLC |
| NPDES ID | ALR10C61N |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 26, 2024 |
| Expires | March 31, 2026 |
| Agency | State |
| Address | Fairhope, AL 36532 |
| Subwatershed | Lower Fish River (HUC 031602050204) |
NPDES ALR10C61N: effluent limits and exceedances
HAVEN AT GAINESWOOD (NPDES ALR10C61N): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES ALR10C61N: no pollutant row on file.
NPDES ALR10C61N: inspections, violations and enforcement
NPDES ALR10C61N: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| August 12, 2026 | Evaluation | S |
NPDES ALR10C61N (HAVEN AT GAINESWOOD): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES ALR10C61N
NPDES ALR10C61N: one email when its EPA record changes — $99/month.
Permits near NPDES ALR10C61N
NPDES ALR10C61N: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded September 15, 2026.