Clean Water Act discharge permit · NPDES ALR10C7XE
D.R. HORTON - ARBOR RIDGE LOT 8, Lillian, AL: NPDES ALR10C7XE discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 1Inspections on file
- 0Formal enforcement actions
D.R. HORTON - ARBOR RIDGE LOT 8, held by D.R. Horton, Inc., holds NPDES permit ALR10C7XE. EPA’s file records it issued April 21, 2026 and expiring March 31, 2031. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What stands out
- Its term runs 4 years and 344 days, April 21, 2026 to March 31, 2031.
- Its newest dated event on file is an inspection on July 7, 2026, 70 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 13,475 discharge permits on the register in Alabama; 7,857 of them (58%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | D.R. HORTON - ARBOR RIDGE LOT 8 |
|---|---|
| Permittee as filed | D.R. Horton, Inc. |
| NPDES ID | ALR10C7XE |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | April 21, 2026 |
| Expiration date | March 31, 2031 |
| Issuing agency | State |
| Address | Lillian, AL 36549 |
| Subwatershed | Palmetto Creek-Perdido Bay (HUC 031401070104) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES ALR10C7XE.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES ALR10C7XE.
Inspections
| Date | What EPA recorded | Agency |
|---|---|---|
| July 7, 2026 | Evaluation | S |
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES ALR10C7XE.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, ALR10C7XE.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID ALR10C7XE there.
D.R. HORTON - ARBOR RIDGE LOT 8, Lillian, Alabama: Coverage under a general permit ALR10C7XE, held by D.R. Horton, Inc.; Construction stormwater; Effective; issued April 21, 2026, term to March 31, 2031, by State.
- July 7, 2026: Evaluation (S).
Alabama holds 7,857 Construction stormwater coverages of this permit type in EPA’s file; 7,139 were issued before ALR10C7XE. D.R. Horton, Inc. holds 63 permits in Alabama.
Other permits held by D.R. Horton, Inc.
- DR HORTON AT STONE BRIDGE, Spanish Fort: ALR10AT20, issued 2026-04-07
- TANNEHILL PRESERVE, Lake View: ALR10BBHW, issued 2026-05-15
- CHELSEA PARK SECTORS 21 AND 23, Chelsea: ALR10C286, issued 2026-04-30
- LANE'S LANDING, Montgomery: ALR10C2SS, issued 2026-03-23
- DR HORTON - JOHNSON RANCH, Mobile: ALR10C371, issued 2026-03-13
- CHELSEA ACRES, Chelsea: ALR10C390, issued 2026-04-21
- HIGH POINT LOTS, Cullman: ALR10C3EP, issued 2026-05-14
- DALTON COVE AT TAYLOR LAKES, Montgomery: ALR10C3EY, issued 2023-02-06
- HALLS CREEK, Dothan: ALR10C3ML, issued 2026-06-03
- ROSEWOOD, Foley: ALR10C3U0, issued 2023-05-15
Coverages issued nearest ALR10C7XE
- 2026-04-20: RSA RAYTHEON MAGAZINE IMPROVEMENTS (308,309,310), Huntsville: ALR10C7XB, held by Chorba Contracting
- 2026-04-20: WAWA-CLOVERLEAF, Mobile: ALR10C7XC, held by TVC Cloverleaf Co., LLC
- 2026-04-20: 271 THOMPSON RD, Hartselle: ALR10C7XD, held by A&M Contracting Services LLC
- 2026-04-21: CHELSEA ACRES, Chelsea: ALR10C390, held by D.R. Horton, Inc.
- 2026-04-21: RUSSIAN ROAD PRODUCTION WELL, Foley: ALR10C797, held by Orange Beach Water, Sewer, and Fire Protection Authority
- 2026-04-21: FOXCHASE PH IV, Opelika: ALR10C7XF, held by BC Stone Homes, LLC
- 2026-04-21: IM-I065(550) PS 2214, Greenville: ALR10C7XG, held by ALDOT
- 2026-04-21: MCINTYRE FARMS, Smiths Station: ALR10C7XH, held by BC Stone Homes, LLC
- 2026-04-21: BIRMINGHAM VEHICLE HOLDING FACILITY, Birmingham: ALR10C7XJ, held by TWENTY4/SEVEN RECOVERY, INC.
- 2026-04-21: MONTGOMERY COUNTRY CLUB, Montgomery: ALR10C7XK, held by The Montgomery Country Club and Beauvior Club
D.R. HORTON - ARBOR RIDGE LOT 8 among its neighbors
23 discharge permits are in the Palmetto Creek-Perdido Bay subwatershed (HUC 031401070104); ALR10C7XE is one. Its county: 1,240, 6 major; ALR10C7XE is minor permit.
Other permits in the Palmetto Creek-Perdido Bay subwatershed (HUC 031401070104)
- BALDWIN COUNTY CR-99 (HW22126), Lillian: ALR10C5JG, minor, term to 2026-03-31
- BRM RESIDENTIAL HOMES-ARBOR RIDGE, Lillian: ALR10C1DW, minor, term to 2026-03-31
- COUNTY ROAD 99, Lillian: ALR10BHU5, minor, term to 2021-03-31
- CYPRESS BAY WEST SUBDIVISION, Lillian: ALR10BBV1, minor, term to 2021-03-31
- D.R. HORTON - SPANISH COVE, Lillian: ALR10C22Q, minor, term to 2026-03-31
- DCB STORAGE, Pensacola: FLR10VB95, minor, term to 2027-04-07
- DR HORTON - HEARON VILLAGE, Lillian: ALR10C2G3, minor, term to 2026-03-31
- DRIFTWOOD COVE, Elberta: ALR10C6XE, minor, term to 2026-03-31
- EASY LIKE THAT RV PARK, Elberta: ALR10BEST, minor, term to 2021-03-31
- HICKS RESIDENCE PINES OF PERDIDO, Elberta: ALR10C4TM, minor, term to 2026-03-31
Nearby on the register
- Discharge permits in Lillian
- Every permit record in Lillian, A to Z
- Discharge permits in Alabama
- Every permit record in Alabama, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
The D.R. HORTON - ARBOR RIDGE LOT 8 permit is one of 1,004 storm water construction permits in Baldwin County on EPA's NPDES register, and it sits among 20 NPDES permits in the Palmetto Creek-Perdido Bay subwatershed, of which 91.7% of the county's storm water construction permits were issued earlier. Its Baldwin County peers show 0.0% with a violation on file, and this permit records no pollutants under a numeric limit or with an effluent exceedance.