Clean Water Act discharge permit · NPDES ALR10C8HB
WEST ALABAMA HIGHWAY SEGMENT 1, Thomasville, AL: NPDES ALR10C8HB discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
WEST ALABAMA HIGHWAY SEGMENT 1, held by C.S. Beatty Construction, Inc, holds NPDES permit ALR10C8HB. EPA’s file records it issued September 1, 2026 and expiring March 31, 2031. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for WEST ALABAMA HIGHWAY SEGMENT 1: its NPDES ID, its permit type and status, its dates, its address in Thomasville, Alabama. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES ALR10C8HB.
What stands out
- Its term runs 4 years and 211 days, September 1, 2026 to March 31, 2031.
- No dated event in the 365 days to October 14, 2026.
- It is one of 13,475 discharge permits on the register in Alabama; 7,857 of them (58%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | WEST ALABAMA HIGHWAY SEGMENT 1 |
|---|---|
| Permittee as filed | C.S. Beatty Construction, Inc |
| NPDES ID | ALR10C8HB |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | September 1, 2026 |
| Expiration date | March 31, 2031 |
| Issuing agency | State |
| Address | Thomasville, AL 36784 |
| NAICS | 238910 – Site Preparation Contractors |
| SIC | 1629 – Heavy Construction |
Cited to the EPA ICIS-NPDES permit file (ECHO download) and EPA’s NAICS/SIC and component files, the same download.
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES ALR10C8HB.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES ALR10C8HB.
Inspections
EPA’s inspection file holds no inspection for NPDES ALR10C8HB.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES ALR10C8HB.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, ALR10C8HB.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID ALR10C8HB there.
WEST ALABAMA HIGHWAY SEGMENT 1, Thomasville, Alabama: Coverage under a general permit ALR10C8HB, held by C.S. Beatty Construction, Inc; Construction stormwater; Effective; issued September 1, 2026, term to March 31, 2031, by State; Site Preparation Contractors.
Alabama holds 7,857 Construction stormwater coverages of this permit type in EPA’s file; 7,829 were issued before ALR10C8HB.
Coverages issued nearest ALR10C8HB
- 2026-09-01: WATERMELON ROAD OFFICE WAREHOUSE, Northport: ALR10C8H5, held by South Shore Tuscaloosa LLC
- 2026-09-01: AUBURN TECHNOLOGY PARK 115KV TRANSMISSION LINE, Auburn: ALR10C8H6, held by PowerSouth Energy Cooperative
- 2026-09-01: STEVEN MAY PIT, Gallion: ALR10C8H7, held by W.S. Newell & Sons, Inc.
- 2026-09-01: EDGED - MOBILE, Prichard: ALR10C8H8, held by EDC Venture, LLC
- 2026-09-01: HAMILTON INDUSTRIAL PARK, Hamilton: ALR10C8HA, held by City of Hamilton
- 2026-09-02: GADSDEN HIGHWAY 11, Trussville: ALR10C8HC, held by Eastern Valley LLC
- 2026-09-02: COOSA RIVER BORE, Riverside: ALR10C8HD, held by Alabama Power Company
- 2026-09-02: DUTCH BROS. - 610 SCHILLINGER RD, MOBILE AL, Mobile: ALR10C8HE, held by Palmetto Mobile-Schillinger Road, LLC
- 2026-09-02: MAGNOLIA ACRES PHASE 2, Summerdale: ALR10C8HF, held by Bill Patterson Construction, Inc.
- 2026-09-02: CREOLA-PITTS BUILDING, Axis: ALR10C8HG, held by Pitts Properties LLC
WEST ALABAMA HIGHWAY SEGMENT 1 among its neighbors
Its county: 101, 2 major; ALR10C8HB is minor permit.
Other permits in the county
- 99-408-134-013-807 PS1959, Thomasville: ALR10BEYU, minor, term to 2021-03-31
- 99-908-134-000-601 PS650, Whatley: ALR16B333, minor, term to 2011-09-20
- BASSETT CREEK-LOWMAN 115KV, Grove Hill: ALR10BF27, minor, term to 2021-03-31
- BLUE MOOSE, Jackson: ALR10C34C, minor, term to 2026-03-31
- BRADLEY PIT, Jackson: ALG890524, minor, term to 2018-01-31
- BRIGGS PIT, Grove Hill: ALG890767, minor, term to 2023-01-31
- BROWDER & SONS VENEER CO., INC., Thomasville: ALG060099, minor, term to 2022-06-30
- BUMPERS OIL COMPANY LLC, Jackson: ALG340089, minor, term to 2022-01-31
- CATHERINE-BASSETT CREEK, Grove Hill: ALR10C6LL, minor, term to 2031-03-31
- CITY OF JACKSON, Jackson: ALG870025, minor, term to 2021-10-30
Nearby on the register
- Discharge permits in Thomasville
- Every permit record in Thomasville, A to Z
- Discharge permits in Alabama
- Every permit record in Alabama, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
WEST ALABAMA HIGHWAY SEGMENT 1, a Storm Water Construction permit in Thomasville, Clarke County, Alabama, is one of 20 storm water construction permits on EPA's NPDES register in Clarke County, this one included. Of all 20 such permits in the county, 95.0% carry an earlier issue date than this permit's September 1, 2026 issuance. Among those 20 permits, 0.0% have a violation on file, and this permit itself records 0 pollutants with an effluent exceedance.