EPA · discharge permits by city
Discharge permits in Sweetwater, Arizona
- 5Current permits
Permits
Major dischargers first. Permits are placed by the address on the permit, which is the operation’s own, not the outfall’s.
| Permit holder | NPDES ID | Program | Discharger | Receiving water |
|---|---|---|---|---|
| N35(8)2&4 SWEETWATER PAVING REPAIR: PROJECT 1464 | AZR10I1GZ | Construction stormwater | Minor | Kit Sili Wash |
| N35(8)2&4-SWEETWATER | AZR10I11A | Construction stormwater | Minor | Kit Sili Wash |
| NA-17-U12/XO1 SR SU WEST IX SCATTERED WATERLINE EXTENSIONS | AZR10I0UY | Construction stormwater | Minor | Kit Sili Wash |
| NA-23-G53 ARIZONA SCATTERED | AZR10I1BO | Construction stormwater | Minor | Kit Sili Wash |
| NA-23-G53: UTAH, ARIZONA AND FOUR CORNERS SCATTERED | AZR10I1CS | Construction stormwater | Minor | Kit Sili Wash |