NPDES AZC102943 · Clean Water Act
FLOREO WATER RECLAMATION FACILITY (WRF) INTERIM PHASE, AZ: NPDES AZC102943 discharge permit, effluent exceedances, inspections, penalties
FLOREO WATER RECLAMATION FACILITY (WRF) INTERIM PHASE, Arizona: General permit coverage AZC102943, held by J.R. Filanc Construction Company, Inc.; Administratively continued; issued March 11, 2024, term to June 30, 2025.
Other permits held by J.R. Filanc Construction Company, Inc.
- TRAINING FACILITY AT TREE FARM: AZC115784, issued 2026-04-14
FLOREO WATER RECLAMATION FACILITY (WRF) INTERIM PHASE among its neighbors
33 discharge permits are in the Wagner Wash subwatershed (HUC 150701030503); AZC102943 is one.
Other permits in the Wagner Wash subwatershed (HUC 150701030503)
- APS WAGNER TO SUN VALLEY 69KV OH LINE, Unknown: AZC100241, minor, term to 2025-06-30
- APS WAGNER TO SUN VALLEY 69KV OH LINE, Unknown: AZC112945, minor, term to 2030-08-28
- FESTIVAL RANCH PARCELS 33, 35,84,88, Unknown: AZC106500, minor, term to 2025-06-30
- FESTIVAL RANCH PARCELS 33, 35,84,88, Unknown: AZC111638, minor, term to 2030-08-28
- FESTIVAL RANCH PLANNING AREA 2, Unknown: AZC111959, minor, term to 2030-08-28
- FESTIVAL RANCH PLANNING AREA 3, Unknown: AZCN91186, minor, term to 2025-06-30
- FESTIVAL RANCH WATER RECLAMATION FACILITY, Buckeye: AZ0025216, major, term to 2026-08-18
- FESTIVAL RANCH WRF PHASE 2A EXPANSION, Unknown: AZC114847, minor, term to 2030-08-28
- FLOREO AT TERAVALIS, Unknown: AZC104307, minor, term to 2025-06-30
- FLOREO AT TERAVALIS, Unknown: AZC110217, minor, term to 2025-08-03
What stands out
- Its term runs 1 year and 111 days, March 11, 2024 to June 30, 2025; the term ended 442 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 7,318 discharge permits on the register in Arizona; the file names no program for it, and it is a minor discharger.
Identity
| Facility | FLOREO WATER RECLAMATION FACILITY (WRF) INTERIM PHASE |
|---|---|
| Permittee | J.R. Filanc Construction Company, Inc. |
| NPDES ID | AZC102943 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | March 11, 2024 |
| Expires | June 30, 2025 |
| Address | AZ 85224 |
| Subwatershed | Wagner Wash (HUC 150701030503) |
NPDES AZC102943: effluent limits and exceedances
FLOREO WATER RECLAMATION FACILITY (WRF) INTERIM PHASE (NPDES AZC102943): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZC102943: no pollutant row on file.
NPDES AZC102943: inspections, violations and enforcement
NPDES AZC102943 (FLOREO WATER RECLAMATION FACILITY (WRF) INTERIM PHASE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZC102943
NPDES AZC102943: one email when its EPA record changes — $99/month.
Permits near NPDES AZC102943
NPDES AZC102943: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.