NPDES AZR10I11D · Clean Water Act
N35(8)2&4 SWEETWATER PROJECT 1464, Totacon, AZ: NPDES AZR10I11D discharge permit, effluent exceedances, inspections, penalties
N35(8)2&4 SWEETWATER PROJECT 1464, Totacon, Arizona: General permit coverage AZR10I11D, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Effective; issued September 15, 2023, term to February 16, 2027, by U.S. EPA.
Arizona holds 676 Construction stormwater coverages of this permit type in EPA’s file; 197 were issued before AZR10I11D. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 145 permits in Arizona.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- N2007 (1-1) 1,2,4: 1389 NAVAJO, AZ BRIDGE AND ROAD CONSTRUCTION, Navajo: AZR10I01C, issued 2017-04-26
- NA-13-T30/XB9/XC1 GRAY MOUNTAIN EXTENSION PHASE I AND PHASE II, Cameron: AZR10I0A0, issued 2018-07-02
- NA-17-W09 SIHASIN OAK SPRINGS EAST CISTERNS, Oak Springs: AZR10I0H6, issued 2019-09-20
- NA-17-W08 SHIASIN OAK SPRINGS SOUTH CISTERNS, Oak Springs: AZR10I0H7, issued 2019-09-20
- NA-18-F70 FORT DEFIANCE MEDICAL REFERRALS 2018, Ganado: AZR10I0H9, issued 2019-09-20
- NA-17-F50 FORT DEFIANCE WEST HOUSING 2017, Burnside: AZR10I0HB, issued 2019-09-20
- NA-15-T56 TEESTO SAND DUNES EXTENSION, Teesto: AZR10I0HF, issued 2019-09-20
- NA-17-U02/ NA-21-W01/ NA-21-W71 LEUPP TO DILKON WATER TRANSMISSION LINE, Dilkon: AZR10I0HH, issued 2019-09-20
- NA-17-Q84/XO2/W28 HOUCK BURNTWATER WASH-HOUCK COMMUNITY WATER SYSTEM, Houck: AZR10I0I9, issued 2019-11-13
- NDOT RFP 18-10-1940LE: NECA 1402 WHEATFIELDS TO TSAILE WIDEN ROAD CONSTRUCTION, Wheatfields: AZR10I0ID, issued 2019-11-18
Coverages issued nearest AZR10I11D
- 2023-09-07: NA-20-LD4, PINON-WEPO WASH CISTERNS, Pinon: AZR10I117, held by Navajo Area Indian Health Service
- 2023-09-07: NA-21-LJ8, BLACK MESA CISTERNS, Pinon: AZR10I118, held by Navajo Area Indian Health Service
- 2023-09-07: NA-20-G06 CHINLE SERVICE UNIT MEDICAL REFERRALS, Chinle: AZR10I119, held by Navajo Area Indian Health Service
- 2023-09-08: N35(8)2&4-SWEETWATER, Sweetwater: AZR10I11A, held by Navajo Division of Transportation
- 2023-09-14: NA-22-LT8-LEUPP SCATTERED CISTERN (1 HOME), Winslow: AZR10I11C, held by Navajo Area Indian Health Service
- 2023-09-15: NA-21-G21 KAYENTA SU SCATTERED HOUSING 2021, Kayenta: AZR10I11G, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2023-09-21: NA-22-LT4 LEUPP SAN FRANCISCO WASH CIST.DIST5, Winslow: AZR10I11L, held by Navajo Area Indian Health Service
- 2023-09-25: NA-20-G10 TUBA CITY SERVICE UNIT SCATTERED HOUSING, Tuba City: AZR10I11M, held by Navajo Area Indian Health Service
- 2023-09-25: NA-16-T71/XK2 TONALEA WILDCAT PEAK EXTENSION, Tonalea: AZR10I11N, held by Navajo Area Indian Health Service
- 2023-10-02: DAY SCHOOL AND OLD REPOSITORY RENOVATIONS, Scottsdale: AZR10I11T, held by Dallas Construction, LLC
N35(8)2&4 SWEETWATER PROJECT 1464 among its neighbors
6 discharge permits are in the Kit Sili Wash subwatershed (HUC 140802041604); AZR10I11D is one.
Other permits in the Kit Sili Wash subwatershed (HUC 140802041604)
- N35(8)2&4 SWEETWATER PAVING REPAIR: PROJECT 1464, Sweetwater: AZR10I1GZ, minor, term to 2027-02-16
- N35(8)2&4-SWEETWATER, Sweetwater: AZR10I11A, minor, term to 2027-02-16
- NA-17-U12/XO1 SR SU WEST IX SCATTERED WATERLINE EXTENSIONS, Sweetwater: AZR10I0UY, minor, term to 2027-02-16
- NA-23-G53 ARIZONA SCATTERED, Sweetwater: AZR10I1BO, minor, term to 2027-02-16
- NA-23-G53: UTAH, ARIZONA AND FOUR CORNERS SCATTERED, Sweetwater: AZR10I1CS, minor, term to 2027-02-16
What stands out
- Its term runs 3 years and 154 days, September 15, 2023 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 7,318 discharge permits on the register in Arizona; 676 of them (9.2%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | N35(8)2&4 SWEETWATER PROJECT 1464 |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I11D |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 15, 2023 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Totacon, AZ 86514 |
| Subwatershed | Kit Sili Wash (HUC 140802041604) |
NPDES AZR10I11D: effluent limits and exceedances
N35(8)2&4 SWEETWATER PROJECT 1464 (NPDES AZR10I11D): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I11D: no pollutant row on file.
NPDES AZR10I11D: inspections, violations and enforcement
NPDES AZR10I11D (N35(8)2&4 SWEETWATER PROJECT 1464): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I11D
NPDES AZR10I11D: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I11D
NPDES AZR10I11D: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.