NPDES AZR10I138 · Clean Water Act
NA-20-LD1 INDIAN WELLS GORILLA HEAD PHASE 2 CISTERNS, Indian Wells, AZ: NPDES AZR10I138 discharge permit, effluent exceedances, inspections, penalties
NA-20-LD1 INDIAN WELLS GORILLA HEAD PHASE 2 CISTERNS, Indian Wells, Arizona: General permit coverage AZR10I138, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Effective; issued December 12, 2023, term to February 16, 2027, by U.S. EPA.
Arizona holds 676 Construction stormwater coverages of this permit type in EPA’s file; 221 were issued before AZR10I138. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 145 permits in Arizona.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- N2007 (1-1) 1,2,4: 1389 NAVAJO, AZ BRIDGE AND ROAD CONSTRUCTION, Navajo: AZR10I01C, issued 2017-04-26
- NA-13-T30/XB9/XC1 GRAY MOUNTAIN EXTENSION PHASE I AND PHASE II, Cameron: AZR10I0A0, issued 2018-07-02
- NA-17-W09 SIHASIN OAK SPRINGS EAST CISTERNS, Oak Springs: AZR10I0H6, issued 2019-09-20
- NA-17-W08 SHIASIN OAK SPRINGS SOUTH CISTERNS, Oak Springs: AZR10I0H7, issued 2019-09-20
- NA-18-F70 FORT DEFIANCE MEDICAL REFERRALS 2018, Ganado: AZR10I0H9, issued 2019-09-20
- NA-17-F50 FORT DEFIANCE WEST HOUSING 2017, Burnside: AZR10I0HB, issued 2019-09-20
- NA-15-T56 TEESTO SAND DUNES EXTENSION, Teesto: AZR10I0HF, issued 2019-09-20
- NA-17-U02/ NA-21-W01/ NA-21-W71 LEUPP TO DILKON WATER TRANSMISSION LINE, Dilkon: AZR10I0HH, issued 2019-09-20
- NA-17-Q84/XO2/W28 HOUCK BURNTWATER WASH-HOUCK COMMUNITY WATER SYSTEM, Houck: AZR10I0I9, issued 2019-11-13
- NDOT RFP 18-10-1940LE: NECA 1402 WHEATFIELDS TO TSAILE WIDEN ROAD CONSTRUCTION, Wheatfields: AZR10I0ID, issued 2019-11-18
Coverages issued nearest AZR10I138
- 2023-11-14: NA-20-LC6 SPIDER ROCK PHASE IV CISTERNS, Chinle: AZR10I12S, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2023-11-14: NA-07-D35/Q68/Y30 ST. MICHAELS SUMMIT PHASE II, St. Michaels: AZR10I12U, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2023-11-15: NA-22-XW1: CHINLE AGENCY FDF DL-2, Many Farms: AZR10I12V, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2023-11-24: NA-20-LD1 INDIAN WELLS GORILLA HEAD PH2 CISTERNS, Indian Wells: AZR10I132, held by Navajo Area Indian Health Service
- 2023-12-05: HON DAH CONVENIENCE STORE AND FUELING, Pinetop: AZR10I135, held by D G Fenn Construction Inc
- 2023-12-27: CAMERON MOUNTAINTOP CISTERNS PHASE 3, Cameron: AZR10I13C, held by Navajo Area Indian Health Services
- 2023-12-27: NA-18-F69, ST. MICHAELS SUMMIT WATER EXTENSION (F69), St. Michaels: AZR10I13D, held by Navajo Area Indian Health Service
- 2024-01-02: NA-19-V01 - INDIAN WELLS GORILLA HAD PH. 1 CISTERNS, Indian Wells: AZR10I13F, held by Navajo Area Indian Health Service
- 2024-01-11: NA-20-G11 TEECNOSPOS SCATTERED, Teec Nos Pos: AZR10I13I, held by Navajo Area Indian Health Service
- 2024-01-17: NA-22-LS7 CAMERON MOUNTAINTOP CISTERNS PH3, Cameron: AZR10I13L, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
NA-20-LD1 INDIAN WELLS GORILLA HEAD PHASE 2 CISTERNS among its neighbors
53 discharge permits are in the Middle Coyote Wash subwatershed (HUC 150200140305); AZR10I138 is one.
Other permits in the Middle Coyote Wash subwatershed (HUC 150200140305)
- 2021 WINSLOW DL4 ST/DF REPLACEMENT: NA-21-XU7, Dilkon: AZR10I15G, minor, term to 2027-02-16
- 2022 DILKON - RED CHEEKS BUTTE WEST CISTERNS PHASE 1: NA-22-LV7, Dilkon: AZR10I18Z, minor, term to 2027-02-16
- 2022 DILKON RABBIT CISTERNS : NA-22-LV6, Dilkon: AZR10I193, minor, term to 2027-02-16
- 2022 DILKON TAYLOR CISTERNS: NA-22-LV4, Dilkon: AZR10I191, minor, term to 2027-02-16
- DILKON HEALTH CENTER GAS LINE, Dilkon: AZR10I0M2
- DILKON NORTH HOUSING GAS REPAIRS, Dilkon: AZR10I0ZS
- DK: HEALTH CENTER NORTH HOUSING GAS EXT, Dilkon: AZR10I0VJ
- INDIAN WELLS ROUND BUTTE CISTERNS: NA-22-LW1, Indian Wells: AZR10I1FB, minor, term to 2027-02-16
- LEUPP PADRE CANYON CISTERNS DISTRICT 5 : NA-22-LT5, Leupp: AZR10I145, minor, term to 2027-02-16
- LEUPP TO DILKON TRANSMISSION MAIN (U02), Dilkon: AZR10I0FG, minor, term to 2022-02-15
What stands out
- Its term runs 3 years and 66 days, December 12, 2023 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 7,318 discharge permits on the register in Arizona; 676 of them (9.2%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NA-20-LD1 INDIAN WELLS GORILLA HEAD PHASE 2 CISTERNS |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I138 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 12, 2023 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Indian Wells, AZ 86031 |
| Subwatershed | Middle Coyote Wash (HUC 150200140305) |
NPDES AZR10I138: effluent limits and exceedances
NA-20-LD1 INDIAN WELLS GORILLA HEAD PHASE 2 CISTERNS (NPDES AZR10I138): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I138: no pollutant row on file.
NPDES AZR10I138: inspections, violations and enforcement
NPDES AZR10I138 (NA-20-LD1 INDIAN WELLS GORILLA HEAD PHASE 2 CISTERNS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I138
NPDES AZR10I138: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I138
NPDES AZR10I138: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.