NPDES AZR10I13M · Clean Water Act
NA-19-V01 INDIAN WELLS GORILLA HEAD CISTERNS PHASE TWO, Indian Wells, AZ: NPDES AZR10I13M discharge permit, effluent exceedances, inspections, penalties
NA-19-V01 INDIAN WELLS GORILLA HEAD CISTERNS PHASE TWO, Indian Wells, Arizona: General permit coverage AZR10I13M, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Effective; issued January 17, 2024, term to February 16, 2027, by U.S. EPA.
Arizona holds 676 Construction stormwater coverages of this permit type in EPA’s file; 226 were issued before AZR10I13M. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 145 permits in Arizona.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- N2007 (1-1) 1,2,4: 1389 NAVAJO, AZ BRIDGE AND ROAD CONSTRUCTION, Navajo: AZR10I01C, issued 2017-04-26
- NA-13-T30/XB9/XC1 GRAY MOUNTAIN EXTENSION PHASE I AND PHASE II, Cameron: AZR10I0A0, issued 2018-07-02
- NA-17-W09 SIHASIN OAK SPRINGS EAST CISTERNS, Oak Springs: AZR10I0H6, issued 2019-09-20
- NA-17-W08 SHIASIN OAK SPRINGS SOUTH CISTERNS, Oak Springs: AZR10I0H7, issued 2019-09-20
- NA-18-F70 FORT DEFIANCE MEDICAL REFERRALS 2018, Ganado: AZR10I0H9, issued 2019-09-20
- NA-17-F50 FORT DEFIANCE WEST HOUSING 2017, Burnside: AZR10I0HB, issued 2019-09-20
- NA-15-T56 TEESTO SAND DUNES EXTENSION, Teesto: AZR10I0HF, issued 2019-09-20
- NA-17-U02/ NA-21-W01/ NA-21-W71 LEUPP TO DILKON WATER TRANSMISSION LINE, Dilkon: AZR10I0HH, issued 2019-09-20
- NA-17-Q84/XO2/W28 HOUCK BURNTWATER WASH-HOUCK COMMUNITY WATER SYSTEM, Houck: AZR10I0I9, issued 2019-11-13
- NDOT RFP 18-10-1940LE: NECA 1402 WHEATFIELDS TO TSAILE WIDEN ROAD CONSTRUCTION, Wheatfields: AZR10I0ID, issued 2019-11-18
Coverages issued nearest AZR10I13M
- 2023-12-27: CAMERON MOUNTAINTOP CISTERNS PHASE 3, Cameron: AZR10I13C, held by Navajo Area Indian Health Services
- 2023-12-27: NA-18-F69, ST. MICHAELS SUMMIT WATER EXTENSION (F69), St. Michaels: AZR10I13D, held by Navajo Area Indian Health Service
- 2024-01-02: NA-19-V01 - INDIAN WELLS GORILLA HAD PH. 1 CISTERNS, Indian Wells: AZR10I13F, held by Navajo Area Indian Health Service
- 2024-01-11: NA-20-G11 TEECNOSPOS SCATTERED, Teec Nos Pos: AZR10I13I, held by Navajo Area Indian Health Service
- 2024-01-17: NA-22-LS7 CAMERON MOUNTAINTOP CISTERNS PH3, Cameron: AZR10I13L, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-01-17: NA-20-G11 TEEC NOS POS SCATTERED, Teec Nos Pos: AZR10I13O, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-01-17: NA-20-LC2 HOUCK HIGHLANDS - CISTERNS, Houck: AZR10I13Q, held by Navajo Area Indian Health Service
- 2024-01-17: NA-20-LE1 LUPTON SOUTH MESA P51 PH2 CISTERNS, Lupton: AZR10I13R, held by Navajo Area Indian Health Service
- 2024-01-22: T'IIS NAZBAS COMMUNITY SCHOOL, Teec Nos Pos: AZR10I13T, held by Tepa EC LLC
- 2024-01-22: NA-22-LT7 LEUPP - GRAND FALLS SCATT. CISTERNS, Leupp: AZR10I13U, held by Navajo Area Indian Health Service
NA-19-V01 INDIAN WELLS GORILLA HEAD CISTERNS PHASE TWO among its neighbors
53 discharge permits are in the Middle Coyote Wash subwatershed (HUC 150200140305); AZR10I13M is one.
Other permits in the Middle Coyote Wash subwatershed (HUC 150200140305)
- 2021 WINSLOW DL4 ST/DF REPLACEMENT: NA-21-XU7, Dilkon: AZR10I15G, minor, term to 2027-02-16
- 2022 DILKON - RED CHEEKS BUTTE WEST CISTERNS PHASE 1: NA-22-LV7, Dilkon: AZR10I18Z, minor, term to 2027-02-16
- 2022 DILKON RABBIT CISTERNS : NA-22-LV6, Dilkon: AZR10I193, minor, term to 2027-02-16
- 2022 DILKON TAYLOR CISTERNS: NA-22-LV4, Dilkon: AZR10I191, minor, term to 2027-02-16
- DILKON HEALTH CENTER GAS LINE, Dilkon: AZR10I0M2
- DILKON NORTH HOUSING GAS REPAIRS, Dilkon: AZR10I0ZS
- DK: HEALTH CENTER NORTH HOUSING GAS EXT, Dilkon: AZR10I0VJ
- INDIAN WELLS ROUND BUTTE CISTERNS: NA-22-LW1, Indian Wells: AZR10I1FB, minor, term to 2027-02-16
- LEUPP PADRE CANYON CISTERNS DISTRICT 5 : NA-22-LT5, Leupp: AZR10I145, minor, term to 2027-02-16
- LEUPP TO DILKON TRANSMISSION MAIN (U02), Dilkon: AZR10I0FG, minor, term to 2022-02-15
What stands out
- Its term runs 3 years and 30 days, January 17, 2024 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 7,318 discharge permits on the register in Arizona; 676 of them (9.2%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NA-19-V01 INDIAN WELLS GORILLA HEAD CISTERNS PHASE TWO |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I13M |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 17, 2024 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Indian Wells, AZ 86031 |
| Subwatershed | Middle Coyote Wash (HUC 150200140305) |
NPDES AZR10I13M: effluent limits and exceedances
NA-19-V01 INDIAN WELLS GORILLA HEAD CISTERNS PHASE TWO (NPDES AZR10I13M): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I13M: no pollutant row on file.
NPDES AZR10I13M: inspections, violations and enforcement
NPDES AZR10I13M (NA-19-V01 INDIAN WELLS GORILLA HEAD CISTERNS PHASE TWO): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I13M
NPDES AZR10I13M: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I13M
NPDES AZR10I13M: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.