NPDES AZR10I165 · Clean Water Act
NA21 - LK2 HARDROCK SCATTERED CISTERN PHASE 1, Kykotsmovi, AZ: NPDES AZR10I165 discharge permit, effluent exceedances, inspections, penalties
NA21 - LK2 HARDROCK SCATTERED CISTERN PHASE 1, Kykotsmovi, Arizona: General permit coverage AZR10I165, held by Kelly Mortensen; Construction stormwater; Effective; issued July 2, 2024, term to February 16, 2027, by U.S. EPA.
Arizona holds 676 Construction stormwater coverages of this permit type in EPA’s file; 268 were issued before AZR10I165.
Coverages issued nearest AZR10I165
- 2024-05-17: CHINLE SU FDF DL-3, NA-22-LL3, Chinle: AZR10I15M, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-05-17: LEUPP CANYON DIABLO CIST DIST. 5 : NA-22-LT6, Leupp: AZR10I15N, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-05-17: NA-22-G41 KAYENTA SU SCATTERED HOUSING 2022, Kayenta: AZR10I15O, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-05-21: NAVAJO DOT, ROUTE 8031 PINON TO HARDROCK CULTURAL TESTING, Pinon: AZR10I15Q, held by Logan Simpson Design Inc.
- 2024-05-28: U38 GANADO SCATTERED, Ganado: AZR10I15S, held by NAVAJO AREA INDIAN HEALTH SERVICES
- 2024-07-02: COALMINE CANYON, Tuba City: AZR10I166, held by Navajo Area Indian Health Services
- 2024-07-11: H873901C PRESCOTT LAKES PARKWAY TO HEATHER HEIGHTS, Prescott: AZR10I16B, held by Arizona Department of Transportation
- 2024-07-16: NA-21-LK2: HARDROCK SCATTERED CISTERN PHASE I, Hardrock: AZR10I16F, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-07-16: NA-22-LT1/LT2/LT3: COALMINE CANYON, APPALOOSA RIDGE, LITTLE COLORADO CISTERNS, Coalmine: AZR10I16G, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-07-22: SCAHC - LONG TERM CARE/SKILLED NURSING FACILITY, Peridot: AZR10I16N, held by Willmeng Construction, Inc
NA21 - LK2 HARDROCK SCATTERED CISTERN PHASE 1 among its neighbors
3 discharge permits are in the Town of Hard Rocks-Oraibi Wash subwatershed (HUC 150200120204); AZR10I165 is one.
Other permits in the Town of Hard Rocks-Oraibi Wash subwatershed (HUC 150200120204)
- NA-21-LK2: HARDROCK SCATTERED CISTERN PHASE I, Hardrock: AZR10I16F, minor, term to 2027-02-16
- NAVAJO DOT, ROUTE 8031 PINON TO HARDROCK CULTURAL TESTING, Pinon: AZR10I15Q, minor, term to 2027-02-16
What stands out
- Its term runs 2 years and 229 days, July 2, 2024 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 7,318 discharge permits on the register in Arizona; 676 of them (9.2%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NA21 - LK2 HARDROCK SCATTERED CISTERN PHASE 1 |
|---|---|
| Permittee | Kelly Mortensen |
| NPDES ID | AZR10I165 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 2, 2024 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Kykotsmovi, AZ 86039 |
| Subwatershed | Town of Hard Rocks-Oraibi Wash (HUC 150200120204) |
NPDES AZR10I165: effluent limits and exceedances
NA21 - LK2 HARDROCK SCATTERED CISTERN PHASE 1 (NPDES AZR10I165): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I165: no pollutant row on file.
NPDES AZR10I165: inspections, violations and enforcement
NPDES AZR10I165 (NA21 - LK2 HARDROCK SCATTERED CISTERN PHASE 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I165
NPDES AZR10I165: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I165
NPDES AZR10I165: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.