Clean Water Act discharge permit · NPDES AZR10I18A
NA-22-LV4 DILKON - TAYLOR CISTERNS, Indian Wells, AZ: NPDES AZR10I18A discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
NA-22-LV4 DILKON - TAYLOR CISTERNS, held by Navajo Area Indian Health Service, holds NPDES permit AZR10I18A. EPA’s file records it issued October 21, 2024 and expiring February 16, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for NA-22-LV4 DILKON - TAYLOR CISTERNS: its NPDES ID, its permit type and status, its dates, its address in Indian Wells, Arizona. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES AZR10I18A.
What stands out
- Its term runs 2 years and 118 days, October 21, 2024 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 7,318 discharge permits on the register in Arizona; 676 of them (9.2%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | NA-22-LV4 DILKON - TAYLOR CISTERNS |
|---|---|
| Permittee as filed | Navajo Area Indian Health Service |
| NPDES ID | AZR10I18A |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | October 21, 2024 |
| Expiration date | February 16, 2027 |
| Issuing agency | U.S. EPA |
| Address | Indian Wells, AZ 86047 |
| Subwatershed | Gleshbito Wash (HUC 150200110509) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES AZR10I18A.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES AZR10I18A.
Inspections
EPA’s inspection file holds no inspection for NPDES AZR10I18A.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES AZR10I18A.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, AZR10I18A.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID AZR10I18A there.
NA-22-LV4 DILKON - TAYLOR CISTERNS, Indian Wells, Arizona: Coverage under a general permit AZR10I18A, held by Navajo Area Indian Health Service; Construction stormwater; Effective; issued October 21, 2024, term to February 16, 2027, by U.S. EPA.
Arizona holds 676 Construction stormwater coverages of this permit type in EPA’s file; 299 were issued before AZR10I18A. Navajo Area Indian Health Service holds 133 permits in Arizona.
Other permits held by Navajo Area Indian Health Service
- GRAY MOUNTAIN WATERLINE EXTENSION - PHASE 1(XB9,XC1,T30), Cameron: AZR10I09P, issued 2018-06-22
- JEDDITO MEMBER EXT. P4 (T42,XE1), Jeddito: AZR10I0AW, issued 2018-08-20
- GANADO AREA SCATTERED(U10), Ganado: AZR10I0EK, issued 2019-03-26
- INSCRIPTION HOUSE ISOLATED CISTERNS (W13), Inscription House: AZR10I0F2
- TEESTO SAND DUNES EXT (T56), Dilkon: AZR10I0FH, issued 2019-06-24
- HOUCK SOUTH PH-2 (T95), Houck: AZR10I0H0, issued 2019-09-18
- HOUCK BURNTWATER WASH (Q84 / XO2 / W28), Houck: AZR10I0I1, issued 2019-10-24
- LUPTON SCATTERED (T53/XG8), Lupton: AZR10I0JM, issued 2020-03-04
- ST. MICHAELS SCATTERED (U11/XN9), Window Rock: AZR10I0KS, issued 2020-06-01
- MANY FARMS SCATTERED HOUSING 2018 (NA-18-F72), Many Farms: AZR10I0L2, issued 2020-07-28
Coverages issued nearest AZR10I18A
- 2024-10-03: NA-22-LU7-GREASEWOOD ANTELOPE SPRINGS CISTERNS, Ganado: AZR10I183, held by Navajo Area Indian Health Service
- 2024-10-10: NA-22-LV8-DILKON TAHA CISTERNS, Dilkon: AZR10I184, held by Navajo Area Indian Health Service
- 2024-10-10: NA-22-LV7 - DILKON - RED CHEEKS BUTTE WEST PH1. CISTERNS, Dilkon: AZR10I185, held by Navajo Area Indian Health Service
- 2024-10-11: NA-22-LV6 DILKON RABBIT CISTERNS, Dilkon: AZR10I186, held by Navajo Area Indian Health Service
- 2024-10-21: NA-22-LV3 DILKON SCATTERED CISTERNS, Dilkon: AZR10I189, held by Navajo Area Indian Health Service
- 2024-10-25: BORROW PIT FOR TONALEA DAY SCHOOL REPLACEMENT AND QUARTERS, Kaibito: AZR10I18C, held by Sealaska Constructors
- 2024-10-31: NA-18-T76/XS4 DENNEHOTSO-WHITE MESA VALLEY EXTENSION, Kayenta: AZR10I18E, held by Navajo Area Indian Health Service
- 2024-11-04: LEHI VETERANS MEMORIAL AND CEMETERY EXPANSION, Mesa: AZR10I18G, held by Dallas Construction LLC
- 2024-11-06: LOWER PERIDOT BUSH COMMUNITY, Peridot: AZR10I18H, held by Basil Kenton
- 2024-11-12: NA-20-LD7 FORT DEFIANCE DISTRICT DL4 FAILED SEWER SYSTEMS, Kinlichee: AZR10I18K, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
NA-22-LV4 DILKON - TAYLOR CISTERNS among its neighbors
3 discharge permits are in the Gleshbito Wash subwatershed (HUC 150200110509); AZR10I18A is one.
Other permits in the Gleshbito Wash subwatershed (HUC 150200110509)
- DILKON PASS PIPELINE AND PUMP STATION PROJECT, Dilkon: AZR10I0V4, minor, term to 2027-02-16
- NTUA DILKON PASS WATER SYSTEM IMPROVEMENTS & BOOSTER PUMP STATION PROJECT 1440, Dilkon: AZR10I0VC, minor, term to 2027-02-16
Nearby on the register
- Discharge permits in Indian Wells
- Every permit record in Indian Wells, A to Z
- Discharge permits in Arizona
- Every permit record in Arizona, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
The NA-22-LV4 DILKON - TAYLOR CISTERNS storm water construction permit is one of 3 NPDES permits in the Gleshbito Wash subwatershed, this one included. Among the 9 storm water construction permits in Indian Wells, this one included, 66.7% carry an earlier issue date than this permit. The permit has no pollutants under a numeric limit and no effluent exceedances on file, and 0.0% of the 10 storm water construction permits in Indian Wells, this one included, have a violation on file.