NPDES AZR10I18L · Clean Water Act
NA-19-V04 KLAGETOH-NAVAJO STATION CISTERNS, Klagetoh, AZ: NPDES AZR10I18L discharge permit, effluent exceedances, inspections, penalties
NA-19-V04 KLAGETOH-NAVAJO STATION CISTERNS, Klagetoh, Arizona: General permit coverage AZR10I18L, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Effective; issued November 12, 2024, term to February 16, 2027, by U.S. EPA.
Arizona holds 676 Construction stormwater coverages of this permit type in EPA’s file; 305 were issued before AZR10I18L. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 145 permits in Arizona.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- N2007 (1-1) 1,2,4: 1389 NAVAJO, AZ BRIDGE AND ROAD CONSTRUCTION, Navajo: AZR10I01C, issued 2017-04-26
- NA-13-T30/XB9/XC1 GRAY MOUNTAIN EXTENSION PHASE I AND PHASE II, Cameron: AZR10I0A0, issued 2018-07-02
- NA-17-W09 SIHASIN OAK SPRINGS EAST CISTERNS, Oak Springs: AZR10I0H6, issued 2019-09-20
- NA-17-W08 SHIASIN OAK SPRINGS SOUTH CISTERNS, Oak Springs: AZR10I0H7, issued 2019-09-20
- NA-18-F70 FORT DEFIANCE MEDICAL REFERRALS 2018, Ganado: AZR10I0H9, issued 2019-09-20
- NA-17-F50 FORT DEFIANCE WEST HOUSING 2017, Burnside: AZR10I0HB, issued 2019-09-20
- NA-15-T56 TEESTO SAND DUNES EXTENSION, Teesto: AZR10I0HF, issued 2019-09-20
- NA-17-U02/ NA-21-W01/ NA-21-W71 LEUPP TO DILKON WATER TRANSMISSION LINE, Dilkon: AZR10I0HH, issued 2019-09-20
- NA-17-Q84/XO2/W28 HOUCK BURNTWATER WASH-HOUCK COMMUNITY WATER SYSTEM, Houck: AZR10I0I9, issued 2019-11-13
- NDOT RFP 18-10-1940LE: NECA 1402 WHEATFIELDS TO TSAILE WIDEN ROAD CONSTRUCTION, Wheatfields: AZR10I0ID, issued 2019-11-18
Coverages issued nearest AZR10I18L
- 2024-10-25: BORROW PIT FOR TONALEA DAY SCHOOL REPLACEMENT AND QUARTERS, Kaibito: AZR10I18C, held by Sealaska Constructors
- 2024-10-31: NA-18-T76/XS4 DENNEHOTSO-WHITE MESA VALLEY EXTENSION, Kayenta: AZR10I18E, held by Navajo Area Indian Health Service
- 2024-11-04: LEHI VETERANS MEMORIAL AND CEMETERY EXPANSION, Mesa: AZR10I18G, held by Dallas Construction LLC
- 2024-11-06: LOWER PERIDOT BUSH COMMUNITY, Peridot: AZR10I18H, held by Basil Kenton
- 2024-11-12: NA-20-LD7 FORT DEFIANCE DISTRICT DL4 FAILED SEWER SYSTEMS, Kinlichee: AZR10I18K, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-11-12: NA-18-U44/XR7 COPPERMINE NORTHWEST 89 EXTENSION, Coppermine: AZR10I18N, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-11-12: FORT DEFIANCE FAILED SEWER SYSTEMS DL4: NA-22-LL1, Fort Defiance: AZR10I18O, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-11-12: NA-16-T66/XJ4: NAVAJO MOUNTAIN AZ SCATTERED PHASE 1, Navajo Mountain: AZR10I18R, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-11-12: TSAILE-BLACK ROCK CISTERNS: NA-22-LQ3, Tsaile: AZR10I18V, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2024-11-12: NA-22-LU7 GREASEWOOD SPRINGS ANTELOPE TRAIL CISTERNS, Greasewood: AZR10I18X, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
NA-19-V04 KLAGETOH-NAVAJO STATION CISTERNS among its neighbors
2 discharge permits are in the Big Dam Wash subwatershed (HUC 150200110305); AZR10I18L is one.
Other permits in the Big Dam Wash subwatershed (HUC 150200110305)
- KLAGETOH-NAVAJO STATION CISTERNS (V04), Klagetoh: AZR10I0NZ, minor, term to 2022-02-15
What stands out
- Its term runs 2 years and 96 days, November 12, 2024 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 7,318 discharge permits on the register in Arizona; 676 of them (9.2%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NA-19-V04 KLAGETOH-NAVAJO STATION CISTERNS |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I18L |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 12, 2024 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Klagetoh, AZ 86502 |
| Subwatershed | Big Dam Wash (HUC 150200110305) |
NPDES AZR10I18L: effluent limits and exceedances
NA-19-V04 KLAGETOH-NAVAJO STATION CISTERNS (NPDES AZR10I18L): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I18L: no pollutant row on file.
NPDES AZR10I18L: inspections, violations and enforcement
NPDES AZR10I18L (NA-19-V04 KLAGETOH-NAVAJO STATION CISTERNS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I18L
NPDES AZR10I18L: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I18L
NPDES AZR10I18L: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.