Velarion Records
Free: one email when NPDES AZWV97318 changes. Unsubscribe any time.

NPDES AZWV97318 · Clean Water Act

MAVERIK #726-BULLHEAD, AZ, Bullhead City, AZ: NPDES AZWV97318 discharge permit, effluent exceedances, inspections, penalties

MAVERIK #726-BULLHEAD, AZ, Bullhead City, Arizona: General permit coverage AZWV97318, held by Utah Cameron Construction, Inc. (Fn); Administratively continued; issued January 6, 2023, term to August 12, 2023, by ADEQ; discharges to unnamed to Bullhead City | HEADWATERS - COLORA.

Other permits held by Utah Cameron Construction, Inc. (Fn)

MAVERIK #726-BULLHEAD, AZ among its neighbors

6 discharge permits are in the Montana Wash-Colorado River subwatershed (HUC 150301010305); AZWV97318 is one.

Other permits in the Montana Wash-Colorado River subwatershed (HUC 150301010305)

What stands out

  • Its term runs 218 days, January 6, 2023 to August 12, 2023; the term ended 1,159 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
  • No dated event in the 365 days to October 14, 2026.
  • It is one of 7,318 discharge permits on the register in Arizona; the file names no program for it, and it is a minor discharger.

Identity

FacilityMAVERIK #726-BULLHEAD, AZ
PermitteeUtah Cameron Construction, Inc. (Fn)
NPDES IDAZWV97318
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
IssuedJanuary 6, 2023
ExpiresAugust 12, 2023
AgencyADEQ
AddressBullhead City, AZ 86442
Receiving waterunnamed to Bullhead City | HEADWATERS - COLORA
SubwatershedMontana Wash-Colorado River (HUC 150301010305)

NPDES AZWV97318: effluent limits and exceedances

MAVERIK #726-BULLHEAD, AZ (NPDES AZWV97318): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES AZWV97318: no pollutant row on file.

NPDES AZWV97318: inspections, violations and enforcement

NPDES AZWV97318 (MAVERIK #726-BULLHEAD, AZ): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES AZWV97318

NPDES AZWV97318: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES AZWV97318

NPDES AZWV97318: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.