WINDOW ROCK WWTF, Fort Defiance, AZ: NPDES NN0021555 discharge permit, effluent exceedances, inspections, penalties

WINDOW ROCK WWTF, Fort Defiance, Arizona: Individual permit NN0021555, held by NAVAJO TRIBAL UTILITY AUTHORITY; Publicly owned treatment works; Administratively continued; issued January 21, 2016, term to January 31, 2021; discharges to BLACK CREEK.

  • BOD, 5-day, 20 deg. C: 10 limits, 263 violations of any kind, 207 effluent exceedances, latest April 30, 2020, largest 2,020% over the limit.
  • E. coli, colony forming units [CFU]: 4 limits, 94 violations of any kind, 86 effluent exceedances, latest May 31, 2026, largest 99,999% over the limit.
  • BOD, 5-day, percent removal: 2 limits, 88 violations of any kind, 51 effluent exceedances, latest April 30, 2020, largest 509% over the limit.
  • Solids, total suspended: 10 limits, 87 violations of any kind, 28 effluent exceedances, latest March 31, 2021, largest 610% over the limit.
  • Chlorine, total residual: 2 limits, 62 violations of any kind, 26 effluent exceedances, latest November 30, 2013, largest 9,066% over the limit.
  • Solids, suspended percent removal: 2 limits, 58 violations of any kind, 25 effluent exceedances, latest December 31, 2022, largest 554% over the limit.
  • Coliform, fecal general: 0 limits, 95 violations of any kind, 14 effluent exceedances, latest October 31, 2003, largest 5,900% over the limit.
  • pH: 4 limits, 76 violations of any kind, 6 effluent exceedances, latest March 31, 2022.
  • Nitrogen, ammonia total [as N]: 6 limits, 13 violations of any kind, 4 effluent exceedances, latest June 30, 2016, largest 2,148% over the limit.
  • Flow, in conduit or thru treatment plant: 8 limits, 82 violations of any kind.
  • Pass/Fail Static Renewal 7Day Chronic Pimephales promelas: 8 limits, 54 violations of any kind.
  • Solids, total dissolved: 6 limits, 25 violations of any kind.
  • Chronic Mthd Sublethal Endpt, %Effect, Median TSTcHo R/nR Pass/Fail, StatR7d P promelas: 0 limits, 20 violations of any kind.
  • Ammonia, unionized: 0 limits, 8 violations of any kind.
  • Temperature, water deg. centigrade: 4 limits, 6 violations of any kind.
  • Temperature, water deg. fahrenheit: 0 limits, 6 violations of any kind.
  • Arsenic, total recoverable: 1 limit, 5 violations of any kind.
  • Thallium, total recoverable: 1 limit, 5 violations of any kind.
  • Copper, total recoverable: 1 limit, 5 violations of any kind.
  • Heptachlor: 1 limit, 5 violations of any kind.
  • Mercury, total recoverable: 1 limit, 5 violations of any kind.
  • Hardness, total [as CaCO3]: 0 limits, 3 violations of any kind.
  • Cyanide, total [as CN]: 1 limit, 2 violations of any kind.
  • Asbestos: 1 limit, 2 violations of any kind.
  • Selenium, total recoverable: 1 limit, 2 violations of any kind.
  • Beryllium, total recoverable [as Be]: 1 limit, 2 violations of any kind.
  • Chromium, hexavalent [as Cr]: 1 limit, 2 violations of any kind.
  • Chromium, trivalent [as Cr]: 1 limit, 2 violations of any kind.
  • Nickel, total recoverable: 1 limit, 2 violations of any kind.
  • Silver total recoverable: 1 limit, 2 violations of any kind.
  • Zinc, total recoverable: 1 limit, 2 violations of any kind.
  • Cadmium, total recoverable: 1 limit, 2 violations of any kind.
  • Lead, total recoverable: 1 limit, 2 violations of any kind.
  • Antimony, total recoverable: 1 limit, 2 violations of any kind.
  • 2-Methyl-4,6-dinitrophenol: 1 limit, 2 violations of any kind.
  • Dichlorobromomethane: 1 limit, 2 violations of any kind.
  • Carbon tetrachloride: 1 limit, 2 violations of any kind.
  • 1,2-Dichloroethane: 1 limit, 2 violations of any kind.
  • Bromoform: 1 limit, 2 violations of any kind.
  • Dibromochloromethane: 1 limit, 2 violations of any kind.
  • Chloroform: 1 limit, 2 violations of any kind.
  • Toluene: 1 limit, 2 violations of any kind.
  • Benzene: 1 limit, 2 violations of any kind.
  • .delta.-BHC: 1 limit, 2 violations of any kind.
  • Acenaphthylene: 1 limit, 2 violations of any kind.
  • Acenaphthene: 1 limit, 2 violations of any kind.
  • Acrolein: 1 limit, 2 violations of any kind.
  • Acrylonitrile: 1 limit, 2 violations of any kind.
  • Anthracene: 1 limit, 2 violations of any kind.
  • Benzo[b]fluoranthene: 1 limit, 2 violations of any kind.
  • Benzo[k]fluoranthene: 1 limit, 2 violations of any kind.
  • Benzo[a]pyrene: 1 limit, 2 violations of any kind.
  • Bis[2-chloroethyl] ether: 1 limit, 2 violations of any kind.
  • Bis[2-chloroethoxy]methane: 1 limit, 2 violations of any kind.
  • Bis[2-chloroisopropyl] ether: 1 limit, 2 violations of any kind.
  • Butyl benzyl phthalate: 1 limit, 2 violations of any kind.
  • Chlorobenzene: 1 limit, 2 violations of any kind.
  • Chrysene: 1 limit, 2 violations of any kind.
  • Diethyl phthalate: 1 limit, 2 violations of any kind.
  • Dimethyl phthalate: 1 limit, 2 violations of any kind.
  • October 19, 2026: Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environment (EP6).
  • August 31, 2026: Dry-weather unanticipated prohibited bypass discharge to waters of the U.S. - endangerment (EP6).
  • August 19, 2026: Wet-weather SSO, no discharge to waters of the U.S., that may endanger health or the environment (EP6).
  • August 17, 2026: PR: Failure to submit noncompliance report - CSO, SSO, or Bypass [40 CFR 122.41(l)(6) & (m)(3)(ii)] (EP6).
  • August 11, 2026: Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environment (EP6).
  • August 10, 2026: Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environment (EP6).
  • July 23, 2026: Wet-weather unanticipated prohibited bypass discharge to waters of the U.S. - endangerment (EP6).
  • May 28, 2026: PR: Failure to submit noncompliance report - CSO, SSO, or Bypass [40 CFR 122.41(l)(6) & (m)(3)(ii)] (EP6).
  • May 22, 2026: Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environment (EP6).
  • April 21, 2026: Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environment (EP6).
  • March 6, 2026: Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environment (EP6).
  • September 28, 2025: Wet-weather SSO, no discharge to waters of the U.S., that may endanger health or the environment (EP6).
  • August 26, 2025: Wet-weather unanticipated prohibited bypass discharge to waters of the U.S. - endangerment (EP6).
  • August 25, 2025: Wet-weather unanticipated prohibited bypass discharge to waters of the U.S. - endangerment (EP6).
  • June 9, 2025: Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environment (EP6).
  • February 16, 2025: Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environment (EP6).
  • January 19, 2025: Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environment (EP6).
  • January 3, 2025: Failure to submit report to the permitting authority of any anticipated bypass [122.41(m)(3)(i)] (EP6).
  • January 1, 2025: Wet-weather unanticipated prohibited bypass discharge to waters of the U.S. - endangerment (EP6).
  • August 11, 2024: Wet-weather unanticipated prohibited bypass discharge to waters of the U.S. - endangerment (EP6).
  • August 8, 2024: Wet-weather unanticipated prohibited bypass discharge to waters of the U.S. - endangerment (EP6).
  • August 4, 2024: PR: Failure to submit noncompliance report - CSO, SSO, or Bypass [40 CFR 122.41(l)(6) & (m)(3)(ii)] (EP6).
  • July 30, 2024: Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environment (EP6).
  • July 29, 2024: Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environment (EP6).
  • June 14, 2024: Failure to submit report to the permitting authority of any anticipated bypass [122.41(m)(3)(i)] (EP6).
  • May 14, 2024: Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environment (EP6).
  • May 7, 2024: Dry-weather SSO, no discharge to waters of the U.S., not permit compliant, no endangerment (EP6).

Arizona holds 91 Publicly owned treatment works coverages of this permit type in EPA’s file; 17 were issued before NN0021555. NAVAJO TRIBAL UTILITY AUTHORITY holds 8 permits in Arizona.

Other permits held by NAVAJO TRIBAL UTILITY AUTHORITY

Coverages issued nearest NN0021555

WINDOW ROCK WWTF among its neighbors

1 discharge permits are in the White Water Wash-Chinle Wash subwatershed (HUC 140802041104); NN0021555 is one. Its county: 20, 1 major; NN0021555 is major permit.

What stands out

  • Its term runs 5 years and 10 days, January 21, 2016 to January 31, 2021; the term ended 2,053 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is a single-event violation on October 19, 2026.
  • In the 365 days to September 15, 2026, it was dated 11 single-event violations.
  • EPA's file dates 27 events for it, from 2024 to 2026; the busiest year is 2026 with 11.
  • 9 of its 144 pollutants on file have an effluent exceedance (6.3%); 139 are under a numeric limit.
  • It is one of 7,318 discharge permits on the register in Arizona; 91 of them (1.2%) are in its program, Publicly owned treatment works, and it is a major discharger.

Identity

FacilityWINDOW ROCK WWTF
PermitteeNAVAJO TRIBAL UTILITY AUTHORITY
NPDES IDNN0021555
StatusAdministratively continued
TypeIndividual permit
ClassMajor
Facility typePublicly owned treatment works
ProgramPublicly owned treatment works
IssuedJanuary 21, 2016
ExpiresJanuary 31, 2021
AddressFort Defiance, AZ 86515
Receiving waterBLACK CREEK
SubwatershedWhite Water Wash-Chinle Wash (HUC 140802041104)

NPDES NN0021555: effluent limits and exceedances

WINDOW ROCK WWTF (NPDES NN0021555): 144 pollutants on file, 139 limited; 144 with a violation of any kind, 9 with an exceedance.

The 60 with the most exceedances of the 144 on file for NPDES NN0021555. How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
BOD, 5-day, 20 deg. C10263207April 30, 20202,020% over the limit
E. coli, colony forming units [CFU]49486May 31, 202699,999% over the limit
BOD, 5-day, percent removal28851April 30, 2020509% over the limit
Solids, total suspended108728March 31, 2021610% over the limit
Chlorine, total residual26226November 30, 20139,066% over the limit
Solids, suspended percent removal25825December 31, 2022554% over the limit
Coliform, fecal general09514October 31, 20035,900% over the limit
pH4766March 31, 2022
Nitrogen, ammonia total [as N]6134June 30, 20162,148% over the limit
Flow, in conduit or thru treatment plant8820
Pass/Fail Static Renewal 7Day Chronic Pimephales promelas8540
Solids, total dissolved6250
Chronic Mthd Sublethal Endpt, %Effect, Median TSTcHo R/nR Pass/Fail, StatR7d P promelas0200
Ammonia, unionized080
Temperature, water deg. centigrade460
Temperature, water deg. fahrenheit060
Arsenic, total recoverable150
Thallium, total recoverable150
Copper, total recoverable150
Heptachlor150
Mercury, total recoverable150
Hardness, total [as CaCO3]030
Cyanide, total [as CN]120
Asbestos120
Selenium, total recoverable120
Beryllium, total recoverable [as Be]120
Chromium, hexavalent [as Cr]120
Chromium, trivalent [as Cr]120
Nickel, total recoverable120
Silver total recoverable120
Zinc, total recoverable120
Cadmium, total recoverable120
Lead, total recoverable120
Antimony, total recoverable120
2-Methyl-4,6-dinitrophenol120
Dichlorobromomethane120
Carbon tetrachloride120
1,2-Dichloroethane120
Bromoform120
Dibromochloromethane120
Chloroform120
Toluene120
Benzene120
.delta.-BHC120
Acenaphthylene120
Acenaphthene120
Acrolein120
Acrylonitrile120
Anthracene120
Benzo[b]fluoranthene120
Benzo[k]fluoranthene120
Benzo[a]pyrene120
Bis[2-chloroethyl] ether120
Bis[2-chloroethoxy]methane120
Bis[2-chloroisopropyl] ether120
Butyl benzyl phthalate120
Chlorobenzene120
Chrysene120
Diethyl phthalate120
Dimethyl phthalate120

NPDES NN0021555: inspections, violations and enforcement

NPDES NN0021555: 27 single-event violations

DateWhat EPA recordedAgency
October 19, 2026Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environmentEP6
August 31, 2026Dry-weather unanticipated prohibited bypass discharge to waters of the U.S. - endangermentEP6
August 19, 2026Wet-weather SSO, no discharge to waters of the U.S., that may endanger health or the environmentEP6
August 17, 2026PR: Failure to submit noncompliance report - CSO, SSO, or Bypass [40 CFR 122.41(l)(6) & (m)(3)(ii)]EP6
August 11, 2026Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environmentEP6
August 10, 2026Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environmentEP6
July 23, 2026Wet-weather unanticipated prohibited bypass discharge to waters of the U.S. - endangermentEP6
May 28, 2026PR: Failure to submit noncompliance report - CSO, SSO, or Bypass [40 CFR 122.41(l)(6) & (m)(3)(ii)]EP6
May 22, 2026Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environmentEP6
April 21, 2026Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environmentEP6
March 6, 2026Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environmentEP6
September 28, 2025Wet-weather SSO, no discharge to waters of the U.S., that may endanger health or the environmentEP6
August 26, 2025Wet-weather unanticipated prohibited bypass discharge to waters of the U.S. - endangermentEP6
August 25, 2025Wet-weather unanticipated prohibited bypass discharge to waters of the U.S. - endangermentEP6
June 9, 2025Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environmentEP6
February 16, 2025Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environmentEP6
January 19, 2025Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environmentEP6
January 3, 2025Failure to submit report to the permitting authority of any anticipated bypass [122.41(m)(3)(i)]EP6
January 1, 2025Wet-weather unanticipated prohibited bypass discharge to waters of the U.S. - endangermentEP6
August 11, 2024Wet-weather unanticipated prohibited bypass discharge to waters of the U.S. - endangermentEP6
August 8, 2024Wet-weather unanticipated prohibited bypass discharge to waters of the U.S. - endangermentEP6
August 4, 2024PR: Failure to submit noncompliance report - CSO, SSO, or Bypass [40 CFR 122.41(l)(6) & (m)(3)(ii)]EP6
July 30, 2024Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environmentEP6
July 29, 2024Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environmentEP6
June 14, 2024Failure to submit report to the permitting authority of any anticipated bypass [122.41(m)(3)(i)]EP6
May 14, 2024Dry-weather SSO, no discharge to waters of the U.S., that may endanger health or the environmentEP6
May 7, 2024Dry-weather SSO, no discharge to waters of the U.S., not permit compliant, no endangermentEP6

NPDES NN0021555 (WINDOW ROCK WWTF): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES NN0021555

NPDES NN0021555: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES NN0021555

NPDES NN0021555: 144 pollutant rows, 27 dated events; ICIS-NPDES download, loaded September 15, 2026.