Clean Water Act discharge permit · NPDES COR10I017
CEDAR POINT SUBDIVSION, Ignacio, CO: NPDES COR10I017 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
CEDAR POINT SUBDIVSION, held by Bonfire Engineering & Construction, holds NPDES permit COR10I017. EPA’s file records it issued July 24, 2024 and expiring February 16, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for CEDAR POINT SUBDIVSION: its NPDES ID, its permit type and status, its dates, its address in Ignacio, Colorado. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES COR10I017.
What stands out
- Its term runs 2 years and 207 days, July 24, 2024 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 8,712 discharge permits on the register in Colorado; 299 of them (3.4%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | CEDAR POINT SUBDIVSION |
|---|---|
| Permittee as filed | Bonfire Engineering & Construction |
| NPDES ID | COR10I017 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | July 24, 2024 |
| Expiration date | February 16, 2027 |
| Issuing agency | U.S. EPA |
| Address | Ignacio, CO 81137 |
| Subwatershed | Rock Creek-Los Pinos River (HUC 140801011502) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES COR10I017.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES COR10I017.
Inspections
EPA’s inspection file holds no inspection for NPDES COR10I017.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES COR10I017.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, COR10I017.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID COR10I017 there.
CEDAR POINT SUBDIVSION, Ignacio, Colorado: Coverage under a general permit COR10I017, held by Bonfire Engineering & Construction; Construction stormwater; Effective; issued July 24, 2024, term to February 16, 2027, by U.S. EPA.
Colorado holds 252 Construction stormwater coverages of this permit type in EPA’s file; 93 were issued before COR10I017. Bonfire Engineering & Construction holds 11 permits in Colorado.
Other permits held by Bonfire Engineering & Construction
- TOWN OF IGNACIO, Ignacio: COR10I012, issued 2024-01-03
- BONUS AREA NORTH IGNACIO (CASINO), Ignacio: COR10I013, issued 2024-01-30
- FLORIDA MESA, Durango: COR10I014, issued 2024-03-20
- NW IGNACIO BLOCK, Ignacio: COR10I019, issued 2024-09-13
- HWY 151 TO ARBOLES, Arboles: COR10I01A, issued 2024-09-13
- BACKBONE REROUTE, Ignacio: COR10I01D, issued 2025-02-19
- TOWN OF ARBOLES, Arboles: COR10I01E, issued 2025-02-19
- SE IGNACIO, Ignacio: COR10I01F, issued 2025-02-25
- FARMINGTON HILL, Ignacio: COR10I01G, issued 2025-02-25
- STATE HIGHWAY 151-160 TO PAGOSA, Arboles: COR10I01H, issued 2025-03-05
Coverages issued nearest COR10I017
- 2024-05-16: KINDER MORGAN RED CEDAR CO2 PIPELINE PROJECT, Red Mesa: COR10I015, held by Cortez Pipeline Company, A Texas General Partnership
- 2024-06-07: XCEL COYOTE SUBSTATION, Aurora: COR10F0AX, held by Public Service Company of Colorado
- 2024-06-24: USAFA VISITORS CENTER - LOT 1 AND TRACT A, TRUENORTH COMMONS FILING 2, Colorado Springs: COR10F0AZ, held by TrueNorth Commons BID
- 2024-06-26: BUCKLEY SFB B841 IMPROVEMENTS - CO-PERMIT WITH COR10F0AM, Buckley Space Force Base: COR10F0B0, held by 140 CES
- 2024-07-04: CRWU 23-1011 MILL AND OVERLAY BASEWIDE II BUCKLEY SPACE FORCE BASE, Aurora: COR10F0B3, held by Joshua Alexander Dolias
- 2024-07-26: NAT'L EAGLE & WILDLIFE REPOSITORY PARKING LOT IMPROVEMENTS, Commerce City: COR10F0B8, held by Fish and Wildlife Service
- 2024-08-02: DPW23-008 SEC GRAVEL PARKING LOT B1829, Ft. Carson: COR10F0B9, held by TOM KJOSEN
- 2024-08-09: DURANGO AIRPORT TERMINAL EXPANSION PHASE 1B, Durango: COR10I018, held by Nunn Construction
- 2024-09-03: LARGE VEHICLE SEARCH FACILITY & OVERWATCH, Colorado Springs: COR10F0BC, held by NATIVE AMERICAN SERVICES CORP (NASCO)
- 2024-09-09: USAFA CEMETERY EXPANSION, Colorado Springs: COR10F0BE, held by Iron Mike Construction, LLC
CEDAR POINT SUBDIVSION among its neighbors
12 discharge permits are in the Rock Creek-Los Pinos River subwatershed (HUC 140801011502); COR10I017 is one.
Other permits in the Rock Creek-Los Pinos River subwatershed (HUC 140801011502)
- BADGER DAYLIGHTING DISPOSAL FACILITY, Ignacio: COR05A002
- BONUS AREA NORTH IGNACIO (CASINO), Ignacio: COR10I013, minor, term to 2027-02-16
- BUCKSKIN CHARLIE HOUSING PROJECT, Ignacio: COR10I01B, minor, term to 2027-02-16
- BUCKSKIN CHARLIE HOUSING PROJECT, Ignacio: COR10I01C, minor, term to 2027-02-16
- CEDAR POINT HOME REPLACEMENT PROJECT PHASE 1, Ignacio: COR10I01K, minor, term to 2027-02-16
- NW IGNACIO BLOCK, Ignacio: COR10I019, minor, term to 2027-02-16
- SKY UTE FAIRGROUNDS BOAT STORAGE YARD & IMPROVEMENTS, Ignacio: COR10I00W, minor, term to 2027-02-16
- SOUTHERN UTE TRIBAL BROADBAND PHASE I, Ignacio: COR10I00P, minor, term to 2022-02-15
- SOUTHERN UTE TRIBAL BROADBAND PHASE I, Ignacio: COR10I00R, minor, term to 2027-02-16
- SUIT WWTP, Ignacio: CO0022853, minor, term to 2022-09-30
Nearby on the register
- Discharge permits in Ignacio
- Every permit record in Ignacio, A to Z
- Discharge permits in Colorado
- Every permit record in Colorado, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
The CEDAR POINT SUBDIVSION permit, held by Bonfire Engineering & Construction, is one of 13 storm water construction permits in Ignacio, Colorado, and it sits among 12 NPDES permits in the Rock Creek-Los Pinos River subwatershed. Of those 13 Ignacio storm water construction permits, 38.5% were issued before this one, and 0.0% of them have a violation on file, a figure that includes this permit, which shows no pollutants under a numeric limit and no effluent exceedances.