NPDES DCPIU0003 · Clean Water Act

U.S. CAPITOL POWER PLANT (ARCHITECT OF THE CAPTIOL), Washington, DC: NPDES DCPIU0003 discharge permit, effluent exceedances, inspections, penalties

U.S. CAPITOL POWER PLANT (ARCHITECT OF THE CAPTIOL), Washington, District of Columbia: Individual industrial user permit DCPIU0003, held by U.S. Capitol Power Plant; Effective; issued October 1, 2023, term to September 30, 2027, by D.c. Wasa (blue Plains).

Other permits in Washington

What stands out

  • Its term runs 3 years and 364 days, October 1, 2023 to September 30, 2027.
  • No dated event in the 365 days to October 14, 2026.
  • It is one of 309 discharge permits on the register in District of Columbia; the file names no program for it, and it is a minor discharger.

Identity

FacilityU.S. CAPITOL POWER PLANT (ARCHITECT OF THE CAPTIOL)
PermitteeU.S. Capitol Power Plant
NPDES IDDCPIU0003
StatusEffective
TypeIndividual industrial user permit
ClassMinor
Facility typeFederal facility
IssuedOctober 1, 2023
ExpiresSeptember 30, 2027
AgencyD.c. Wasa (blue Plains)
AddressWashington, DC 20003

NPDES DCPIU0003: effluent limits and exceedances

U.S. CAPITOL POWER PLANT (ARCHITECT OF THE CAPTIOL) (NPDES DCPIU0003): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES DCPIU0003: no pollutant row on file.

NPDES DCPIU0003: inspections, violations and enforcement

NPDES DCPIU0003 (U.S. CAPITOL POWER PLANT (ARCHITECT OF THE CAPTIOL)): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES DCPIU0003

NPDES DCPIU0003: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES DCPIU0003

NPDES DCPIU0003: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.