Clean Water Act discharge permit · NPDES DCR1000CV
SKYLAND PHASE C, Washington, DC: NPDES DCR1000CV discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
SKYLAND PHASE C, held by Skyland Holding's, LLC and Skyland Phase C-2, LLC, holds NPDES permit DCR1000CV. EPA’s file records it issued February 28, 2024 and expiring February 16, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for SKYLAND PHASE C: its NPDES ID, its permit type and status, its dates, its address in Washington, District of Columbia. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES DCR1000CV.
What stands out
- Its term runs 2 years and 353 days, February 28, 2024 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 309 discharge permits on the register in District of Columbia; 229 of them (74%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | SKYLAND PHASE C |
|---|---|
| Permittee as filed | Skyland Holding's, LLC and Skyland Phase C-2, LLC |
| NPDES ID | DCR1000CV |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | February 28, 2024 |
| Expiration date | February 16, 2027 |
| Issuing agency | U.S. EPA |
| Address | Washington, DC 20020 |
| Subwatershed | Lower Anacostia River (HUC 020700100204) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES DCR1000CV.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES DCR1000CV.
Inspections
EPA’s inspection file holds no inspection for NPDES DCR1000CV.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES DCR1000CV.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, DCR1000CV.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID DCR1000CV there.
SKYLAND PHASE C, Washington, District of Columbia: Coverage under a general permit DCR1000CV, held by Skyland Holding's, LLC and Skyland Phase C-2, LLC; Construction stormwater; Effective; issued February 28, 2024, term to February 16, 2027, by U.S. EPA.
District of Columbia holds 228 Construction stormwater coverages of this permit type in EPA’s file; 108 were issued before DCR1000CV.
Coverages issued nearest DCR1000CV
- 2023-11-06: WOODMONT CHARTER SCHOOL - CC PREP, Washington: DCR1000A3, held by Andy Botticello
- 2023-11-14: CHESAPEAKE & OHIO CANAL LIFT LOCK 5, INLET LOCK 1, GUARD LOCK REHAB, Washington: DCR1000CM, held by Kokosing Construction Company
- 2023-11-21: BELMONT CROSSING APARTMENTS PHASE 2, Washington, Dc: DCR1000CL, held by Gilbane Development Company
- 2023-12-21: 2750-2754 CHAIN BRIDGE ROAD NW, Washington: DCR1000CP, held by 2800 Chain Bridge Road LLC
- 2024-01-25: 4425-4469 TINDALL STREET NW, Washington: DCR1000CQ, held by Square 1596 Partners LLC
- 2024-03-06: 900 55TH STREET NE, Washington, Dc: DCR1000CX, held by Habitat for Humanity of Washington, DC
- 2024-03-20: FEDERAL RESERVE BOARD: NORTH GARAGE AND EAST FOUNTAIN 20TH & C STREET NW, Washington: DCR1000CW, held by Balfour Beatty Construction, LLC
- 2024-04-26: NAMA 318722 NPS WEST POTOMAC PARK AND TIDAL BASIN SEAWALL/REHABILITATION, Washington: DCR1000CY, held by Cianbro Corporation
- 2024-06-12: VOLLEY BALL COURT RELOCATION, Washington Sw: DCR1000D0, held by Spiniello Companies
- 2024-07-01: PENTAGON COMMERCIAL VEHICLE INSPECTION FACILITY &, Washington Dc: VAR10X077, held by TMG Construction Corporation
SKYLAND PHASE C among its neighbors
153 discharge permits are in the Lower Anacostia River subwatershed (HUC 020700100204); DCR1000CV is one.
Other permits in the Lower Anacostia River subwatershed (HUC 020700100204)
- 100 POTOMAC AVE SW, Washington: DCR1000EI, minor, term to 2027-02-16
- 1150 1ST ST NE, 1150 1st St Ne: DCR10007E, minor, term to 2022-02-15
- 1200 SYCAMORE DRIVE, Washington: DCR10008O, minor, term to 2022-02-15
- 1319 SOUTH CAPITOL STREET SW, Washington Dc: DCR10009C, minor, term to 2022-02-15
- 1333 M STREET SE, Washington: 03R10I00A, minor, term to 2027-02-16
- 2266 25TH PLACE DC WAREHOUSE, Washington: DCR100093, minor, term to 2022-02-15
- 44 M STREET NE, Washington: DCR10008V, minor, term to 2022-02-15
- 4744 BENNING ROAD SE, Washington: 03R10I015, minor, term to 2027-02-16
- 60 NEW YORK AVENUE NE, Washington: DCR10008Y, minor, term to 2022-02-15
- 610 PARK ROAD, NW, Washington: DCR10009J, minor, term to 2022-02-15
Nearby on the register
- Discharge permits in Washington
- Every permit record in Washington, A to Z
- Discharge permits in District of Columbia
- Every permit record in District of Columbia, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
SKYLAND PHASE C is one of 33 storm water construction permits in Washington on EPA's NPDES register, and 6.1% of those 33 were issued before it. The permit has no pollutants under a numeric limit and no effluent exceedances, and 0.0% of the 33 Washington storm water construction permits have a violation on file.