NPDES FLR05A926 · Clean Water Act
DIAMOND R FERTILIZER CO INC, Winter Garden, FL: NPDES FLR05A926 discharge permit, effluent exceedances, inspections, penalties
DIAMOND R FERTILIZER CO INC, Winter Garden, Florida: General permit coverage FLR05A926, held by Diamond R Fertilizer Co Inc; Industrial stormwater; Administratively continued; issued June 5, 2016, term to June 4, 2021, by Florida Department of Environmental Protection; discharges to ST JOSEPH SOUND.
- Nitrite + Nitrate total [as N]: 2 limits, 1 violation of any kind.
- Phosphorus, total [as P]: 2 limits, 1 violation of any kind.
- Iron, total recoverable: 2 limits, 1 violation of any kind.
- Zinc, total recoverable: 2 limits, 1 violation of any kind.
- Lead, total recoverable: 2 limits, 1 violation of any kind.
- April 12, 2024: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
- April 12, 2024: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).
- April 12, 2024: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
- April 12, 2024: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- April 12, 2024: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
- June 8, 2022: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
- June 8, 2022: WW Storm Water Non-Construction - Failure to Monitor (ST6).
- June 8, 2022: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).
- June 8, 2022: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
- November 6, 2019: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- November 6, 2019: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
- November 6, 2019: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
- November 6, 2019: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
- November 6, 2019: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).
- November 6, 2019: WW Storm Water Non-Construction - Failure to Monitor (ST6).
- November 6, 2019: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 1,176 were issued before FLR05A926. Diamond R Fertilizer Co Inc holds 4 permits in Florida.
Other permits held by Diamond R Fertilizer Co Inc
- DIAMOND R FERTILIZER CO, INC, Okeechobee: FLR05G023, issued 2020-03-28
- DIAMOND R FERTILIZER CO INC, Labelle: FLRNEF902, issued 2023-04-08
- DIAMOND R FERTILIZER CO INC, Fort Pierce: FLRNEF939, issued 2023-08-26
Coverages issued nearest FLR05A926
- 2016-05-14: MASTERROCK RECYCLING CENTER, Sarasota: FLRNEE883, held by MasterRock LLC
- 2016-05-15: NUSTAR JACKSONVILLE TERMINAL, Jacksonville: FLR05H136, held by NuStar Terminals Operations Partnership L.P.
- 2016-05-22: WEST ROCK BRADENTON CONTAINER PLANT, Bradenton: FLR05H969, held by WestRock CP, LLC.
- 2016-05-23: XPO LOGISTICS DRAYAGE, LLC, Jacksonville: FLR05H970, held by XPO Drayage
- 2016-05-30: BHD PRECISION PRODUCTS, INC, Sarasota: FLRNEF382, held by B H D Precision Products Inc
- 2016-06-05: FORTERRA PIPE & PRECAST-DELAND, Deland: FLR05B451, held by Forterra Pipe & Precast, LLC
- 2016-06-09: MARLOW-HUNTER LLC, Alachua: FLR05B056, held by Marlow-Hunter, LLC
- 2016-06-09: BLASIUS ROAD MATERIAL RECOVERY FACILITY, Jacksonville: FLR05H198, held by Coastal Recycling Services LLC
- 2016-06-10: BASF CORPORATION - QUINCY PLANT, Quincy: FLR05C157, held by BASF Corporation
- 2016-06-13: WESTROCK, PANAMA CITY MILL, Panama City: FLR05B556, held by WestRock CP, LLC.
DIAMOND R FERTILIZER CO INC among its neighbors
70 discharge permits are in the Lake Apopka subwatershed (HUC 030801020302); FLR05A926 is one. Its county: 1,375, 15 major; FLR05A926 is minor permit.
Other permits in the Lake Apopka subwatershed (HUC 030801020302)
- 429 BUSINESS PARK, Ocoee: FLR20GW29, minor, term to 2028-12-23
- 429 BUSINESS PARK (EAST/WEST), Ocoee: FLR20GW28, minor, term to 2028-12-23
- 429@CROWN POINT-SOUTH, Winter Garden: FLR20IW15, minor, term to 2031-01-10
- 7-11, Ocoee: FLG073898, minor, term to 2029-01-02
- 7-11, Ocoee: FLR10WL83, minor, term to 2028-12-22
- ADVANCED DRAINAGE SYSTEMS, Winter Garden: FLR05J304, minor, term to 2030-02-10
- BALLISTIC ADVANTAGE, Apopka: FLR05J186, minor, term to 2029-03-22
- BELLA COLINA, Montverde: FLR10UI54, minor, term to 2026-05-19
- BELLA COLLINA, Montverde: FLR10UG21, minor, term to 2026-04-16
- BELLA COLLINA CCD RESIDENTIAL IRR PIPING, Montverde: FLR20GR36, minor, term to 2028-10-04
What stands out
- Its term runs 4 years and 364 days, June 5, 2016 to June 4, 2021; the term ended 1,929 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a single-event violation on April 12, 2024, 886 days before EPA's file was loaded.
- No dated event in the 365 days to September 15, 2026.
- EPA's file dates 16 events for it, from 2019 to 2024; the busiest year is 2019 with 7.
- It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.
Identity
| Facility | DIAMOND R FERTILIZER CO INC |
|---|---|
| Permittee | Diamond R Fertilizer Co Inc |
| NPDES ID | FLR05A926 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | June 5, 2016 |
| Expires | June 4, 2021 |
| Agency | Florida Department of Environmental Protection |
| Address | Winter Garden, FL 34787 |
| Receiving water | ST JOSEPH SOUND |
| Subwatershed | Lake Apopka (HUC 030801020302) |
| Other EPA IDs (FRS) | RCRA handler FLD067837435 |
NPDES FLR05A926: effluent limits and exceedances
DIAMOND R FERTILIZER CO INC (NPDES FLR05A926): 5 pollutants on file, 5 limited; 5 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Nitrite + Nitrate total [as N] | 2 | 1 | 0 | ||
| Phosphorus, total [as P] | 2 | 1 | 0 | ||
| Iron, total recoverable | 2 | 1 | 0 | ||
| Zinc, total recoverable | 2 | 1 | 0 | ||
| Lead, total recoverable | 2 | 1 | 0 |
NPDES FLR05A926: inspections, violations and enforcement
NPDES FLR05A926: 16 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| April 12, 2024 | WW Storm Water Non-Construction - Failure to properly install/implement BMPs | ST6 |
| April 12, 2024 | WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs | ST6 |
| April 12, 2024 | WW Storm Water Non-Construction - Failure to Maintain Records | ST6 |
| April 12, 2024 | WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| April 12, 2024 | WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP | ST6 |
| June 8, 2022 | WW Storm Water Non-Construction - Failure to Maintain Records | ST6 |
| June 8, 2022 | WW Storm Water Non-Construction - Failure to Monitor | ST6 |
| June 8, 2022 | WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs | ST6 |
| June 8, 2022 | WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP | ST6 |
| November 6, 2019 | WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| November 6, 2019 | WW Storm Water Non-Construction - Failure to Conduct Inspections | ST6 |
| November 6, 2019 | WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP | ST6 |
| November 6, 2019 | WW Storm Water Non-Construction - Failure to Maintain Records | ST6 |
| November 6, 2019 | WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs | ST6 |
| November 6, 2019 | WW Storm Water Non-Construction - Failure to Monitor | ST6 |
| November 6, 2019 | WW Storm Water Non-Construction - Failure to properly install/implement BMPs | ST6 |
NPDES FLR05A926 (DIAMOND R FERTILIZER CO INC): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR05A926
NPDES FLR05A926: one email when its EPA record changes — $99/month.
Permits near NPDES FLR05A926
NPDES FLR05A926: 5 pollutant rows, 16 dated events; ICIS-NPDES download, loaded September 15, 2026.