NPDES FLR05B309 · Clean Water Act
BAKER PAINT, Sanderson, FL: NPDES FLR05B309 discharge permit, effluent exceedances, inspections, penalties
BAKER PAINT, Sanderson, Florida: General permit coverage FLR05B309, held by Pride Enterprises; Industrial stormwater; Administratively continued; issued April 5, 2021, term to April 4, 2026, by Florida Department of Environmental Protection; Paint and Coating Manufacturing.
- March 24, 2021: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
- March 24, 2021: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- March 24, 2021: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
- March 24, 2021: WW Storm Water Non-Construction - Failure to Monitor (ST6).
Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 2,733 were issued before FLR05B309. Pride Enterprises holds 9 permits in Florida.
Other permits held by Pride Enterprises
- UNION FOOD, Raiford: FLR05B303, issued 2021-04-11
- POLK FURNITURE, Polk City: FLR05B304, issued 2011-02-25
- UNION METAL FURNITURE, Raiford: FLR05B305, issued 2011-02-25
- CALHOUN PRINT, Blountstown: FLR05B306, issued 2021-04-07
- SUMTER FURNITURE, Bushnell: FLR05B307, issued 2021-04-11
- UNION FORESTRY, Raiford: FLR05B308, issued 2021-04-10
- PRIDE ENTERPRISES, Raiford: FLR05B310, issued 2011-02-25
- AVON PARK SANITARY MAINTENANCE, Avon Park: FLR05E201, issued 2021-04-08
Coverages issued nearest FLR05B309
- 2021-04-03: CANAVERAL PORT AUTHORITY, Cape Canaveral: FLR05B533, held by Canaveral Port Authority
- 2021-04-03: WM OF ORLANDO - RIO VISTA, Orlando: FLR05B922, held by Waste Management Inc of Florida
- 2021-04-04: US PIPE FABRICATION, Orlando: FLR05H950, held by US Pipe Fabrication
- 2021-04-04: LOTTS CONCRETE PRODUCTS, Fort Myers: FLR05I624, held by Lotts Concrete Products
- 2021-04-04: PROFORM FINISHING PRODUCTS, LLC, Orlando: FLR05I634, held by Proform Finishing Products, LLC
- 2021-04-07: CALHOUN PRINT, Blountstown: FLR05B306, held by Pride Enterprises
- 2021-04-08: TAMPA EXECUTIVE AIRPORT, Tampa: FLR05A456, held by Hillsborough County Aviation Authority
- 2021-04-08: PLANT CITY AIRPORT, Plant City: FLR05A475, held by Hillsborough County Aviation Authority
- 2021-04-08: PETER O KNIGHT AIRPORT, Tampa: FLR05A483, held by Hillsborough County Aviation Authority
- 2021-04-08: TAMPA INTERNATIONAL AIRPORT, Tampa: FLR05A530, held by Hillsborough County Aviation Authority
BAKER PAINT among its neighbors
1 discharge permits are in the Palestine Lake subwatershed (HUC 030702040401); FLR05B309 is one. Its county: 17, 1 major; FLR05B309 is minor permit.
What stands out
- Its term runs 4 years and 364 days, April 5, 2021 to April 4, 2026; the term ended 193 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a single-event violation on March 24, 2021, 2,030 days before EPA's file was loaded.
- No dated event in the 365 days to October 14, 2026.
- EPA's file dates 4 events for it, all in 2021.
- It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.
Identity
| Facility | BAKER PAINT |
|---|---|
| Permittee | Pride Enterprises |
| NPDES ID | FLR05B309 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | April 5, 2021 |
| Expires | April 4, 2026 |
| Agency | Florida Department of Environmental Protection |
| Address | Sanderson, FL 32087 |
| Subwatershed | Palestine Lake (HUC 030702040401) |
| NAICS | 325510 – Paint and Coating Manufacturing |
| SIC | 2851 – Paints And Allied Products |
| Other EPA IDs (FRS) | RCRA handler FL0000666065 |
NPDES FLR05B309: effluent limits and exceedances
BAKER PAINT (NPDES FLR05B309): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR05B309: no pollutant row on file.
NPDES FLR05B309: inspections, violations and enforcement
NPDES FLR05B309: 4 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| March 24, 2021 | WW Storm Water Non-Construction - Failure to Conduct Inspections | ST6 |
| March 24, 2021 | WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| March 24, 2021 | WW Storm Water Non-Construction - Failure to Maintain Records | ST6 |
| March 24, 2021 | WW Storm Water Non-Construction - Failure to Monitor | ST6 |
NPDES FLR05B309 (BAKER PAINT): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR05B309
NPDES FLR05B309: one email when its EPA record changes — $99/month.
Permits near NPDES FLR05B309
NPDES FLR05B309: 0 pollutant rows, 4 dated events; ICIS-NPDES download, loaded October 14, 2026.