NPDES FLR05C241 · Clean Water Act
BELL MARINE SERVICE INC, Pensacola, FL: NPDES FLR05C241 discharge permit, effluent exceedances, inspections, penalties
BELL MARINE SERVICE INC, Pensacola, Florida: General permit coverage FLR05C241, held by Bell Marine Service Inc; Industrial stormwater; Administratively continued; issued September 23, 2016, term to September 22, 2021, by Florida Department of Environmental Protection.
- Iron, total recoverable: 2 limits, 1 violation of any kind.
- Zinc, total recoverable: 2 limits, 1 violation of any kind.
- Aluminum, total recoverable: 2 limits, 1 violation of any kind.
- Lead, total recoverable: 2 limits, 1 violation of any kind.
- April 23, 2026: Letter of Violation/ Warning Letter (State).
- March 30, 2026: Evaluation (S).
- October 19, 2023: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
- October 19, 2023: WW Storm Water Non-Construction - Failure to Monitor (ST6).
- October 19, 2023: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
- October 19, 2023: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- October 19, 2023: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).
- February 13, 2023: WW Storm Water Non-Construction - Failure to Monitor (ST6).
- February 13, 2023: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).
- February 13, 2023: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
- February 13, 2023: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
- February 9, 2022: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
- February 9, 2022: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
- February 9, 2022: WW Storm Water Non-Construction - Failure to Monitor (ST6).
- November 10, 2020: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
- November 10, 2020: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
- November 10, 2020: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
- November 10, 2020: WW Storm Water Non-Construction - Failure to Monitor (ST6).
- November 10, 2020: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).
- November 10, 2020: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 1,252 were issued before FLR05C241.
Coverages issued nearest FLR05C241
- 2016-09-19: DISNEY AUTO DISMANTLER, Orlando: FLR05E268, held by Disney Auto Dismantlers
- 2016-09-22: ANDERSON COLUMBIA CO INC, Marianna: FLR05A884, held by Anderson Columbia Co Inc
- 2016-09-22: NORTH PALM BEACH COUNTY GENERAL AVIATION AIRPORT, West Palm Beach: FLR05E202, held by Landmark Aviation
- 2016-09-22: XPO LOGISTICS FREIGHT, INC - NTH, Monticello: FLR05G014, held by XPO Logistics Freight, Inc.
- 2016-09-22: CMC RECYCLING, Gainesville: FLR05H202, held by Commercial Metals Company
- 2016-09-23: OLD DOMINION FREIGHT LINE TPA, Tampa: FLR05H199, held by Old Dominion Freight Line Inc
- 2016-09-23: CMC RECYCLING, Apopka: FLR05H203, held by Commercial Metals Company
- 2016-09-23: CMC RECYCLING, Tampa: FLR05H204, held by Commercial Metals Company
- 2016-09-24: POLYGLASS USA, Winter Haven: FLR05G404, held by Polyglass USA
- 2016-09-24: BUFFALO ROCK PANAMA CITY FRANCHISE, Panama City: FLRNEF001, held by Buffalo Rock Company
BELL MARINE SERVICE INC among its neighbors
66 discharge permits are in the Bayou Cico-Bayou Garcon Frontal subwatershed (HUC 031401050403); FLR05C241 is one. Its county: 333, 8 major; FLR05C241 is minor permit.
Other permits in the Bayou Cico-Bayou Garcon Frontal subwatershed (HUC 031401050403)
- 111 S JAMAICA STREET, Pensacola: FLG073907, minor, term to 2029-01-11
- 1B-24 ACCELERATED WORK, Pensacola: FLR10WT41, minor, term to 2029-04-21
- 1B-24 VOLUME 2, Pensacola: FLR10XE18, minor, term to 2029-10-09
- 200 BLK NEW WARRINGTON, Pensacola: FLR10XX82, minor, term to 2030-09-12
- 407 S PACE BLVD, PENSACOLA, FL 32502, Pensacola: FLR10VP44, minor, term to 2027-12-08
- 7.14 EROSION AT SINTON CIRCLE OVERPASS, Pensacola: FLR10WM11, minor, term to 2028-12-24
- 7.2 - DRAINAGE SWALE REPAIR AT CORRY STATION, Pensacola: FLR20GV86, minor, term to 2028-12-17
- 7.3 STW SYSTEM AT GOLF COURSE AND DUNCAN RD, Pensacola: FLR20IH53, minor, term to 2030-06-05
- 7.4 - SUBSIDENCE ALON STORMWATER OTFALL, Pensacola: FLR20HW31, minor, term to 2030-01-18
- 7.6 STORMWATER CONVEYANCE CHANNEL AT FARRAR ROAD, Pensacola: FLR20IX68, minor, term to 2031-01-22
What stands out
- Its term runs 4 years and 364 days, September 23, 2016 to September 22, 2021; the term ended 1,819 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is an informal enforcement action on April 23, 2026, 145 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 inspection, 1 informal enforcement action.
- EPA's file dates 20 events for it, from 2020 to 2026; the busiest year is 2023 with 9.
- It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.
Identity
| Facility | BELL MARINE SERVICE INC |
|---|---|
| Permittee | Bell Marine Service Inc |
| NPDES ID | FLR05C241 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | September 23, 2016 |
| Expires | September 22, 2021 |
| Agency | Florida Department of Environmental Protection |
| Address | Pensacola, FL 32507 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Bayou Cico-Bayou Garcon Frontal (HUC 031401050403) |
NPDES FLR05C241: effluent limits and exceedances
BELL MARINE SERVICE INC (NPDES FLR05C241): 4 pollutants on file, 4 limited; 4 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Iron, total recoverable | 2 | 1 | 0 | ||
| Zinc, total recoverable | 2 | 1 | 0 | ||
| Aluminum, total recoverable | 2 | 1 | 0 | ||
| Lead, total recoverable | 2 | 1 | 0 |
NPDES FLR05C241: inspections, violations and enforcement
NPDES FLR05C241: 18 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| October 19, 2023 | WW Storm Water Non-Construction - Failure to Maintain Records | ST6 |
| October 19, 2023 | WW Storm Water Non-Construction - Failure to Monitor | ST6 |
| October 19, 2023 | WW Storm Water Non-Construction - Failure to properly install/implement BMPs | ST6 |
| October 19, 2023 | WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| October 19, 2023 | WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs | ST6 |
| February 13, 2023 | WW Storm Water Non-Construction - Failure to Monitor | ST6 |
| February 13, 2023 | WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs | ST6 |
| February 13, 2023 | WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP | ST6 |
| February 13, 2023 | WW Storm Water Non-Construction - Failure to Maintain Records | ST6 |
| February 9, 2022 | WW Storm Water Non-Construction - Failure to Maintain Records | ST6 |
| February 9, 2022 | WW Storm Water Non-Construction - Failure to Conduct Inspections | ST6 |
| February 9, 2022 | WW Storm Water Non-Construction - Failure to Monitor | ST6 |
| November 10, 2020 | WW Storm Water Non-Construction - Failure to Maintain Records | ST6 |
| November 10, 2020 | WW Storm Water Non-Construction - Failure to Conduct Inspections | ST6 |
| November 10, 2020 | WW Storm Water Non-Construction - Failure to properly install/implement BMPs | ST6 |
| November 10, 2020 | WW Storm Water Non-Construction - Failure to Monitor | ST6 |
| November 10, 2020 | WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs | ST6 |
| November 10, 2020 | WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
NPDES FLR05C241: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| March 30, 2026 | Evaluation | S |
NPDES FLR05C241: 1 informal enforcement action
| Date | What EPA recorded | Agency |
|---|---|---|
| April 23, 2026 | Letter of Violation/ Warning Letter | State |
NPDES FLR05C241 (BELL MARINE SERVICE INC): no formal enforcement action on file.
Watch NPDES FLR05C241
NPDES FLR05C241: one email when its EPA record changes — $99/month.
Permits near NPDES FLR05C241
NPDES FLR05C241: 4 pollutant rows, 20 dated events; ICIS-NPDES download, loaded September 15, 2026.